01 - April 8, 2025 Committee of the Whole Agenda PackageEl m ou sty
Elgin County Council
Committee of the Whole Meeting
Orders of the Day
Tuesday, April 8, 2025, 9:30 a.m.
Council Chambers
450 Sunset Drive
St. Thomas ON
Note for Members of the Public:
Please click the link below to watch the Meeting:
https://www.facebook.com/ElginCounty
Accessible formats available upon request.
Pages
1. Meeting Call to Order
2. Approval of Agenda
3. Adoption of Minutes
4. Disclosure of Pecuniary Interest and the General Nature Thereof
5. Members' Motions
6. Reports of Council, Staff or Outside Boards
6.1 Director of Financial Services/Treasurer - Terrace Lodge Redevelopment 2
— Debenture Timeline
6.2 Cold In -Place Asphalt Recycling (Tender No. 2025-T10) and Hot Mix 5
Asphalt Paving (Tender No. 2025-T11) - Tender Awards
7. Adjournment
Report to Committee of the Whole
From: Jennifer Ford, Director of Financial Services/Treasurer
Date: April 8, 2025
Subject: Terrace Lodge Redevelopment — Debenture Timeline
Recommendation(s):
THAT the report entitled "Terrace Lodge Redevelopment — Debenture Timeline" dated
April 8, 2025 be approved by Council; and,
THAT the Warden, Chief Administrative Officer/Clerk, and Treasurer be approved to
sign the necessary documents once received as per the outlined timelines of
Infrastructure Ontario (10); and,
THAT a By -Law be brought forward for Council to approve at the next Council meeting
in order to meet the requirements of the debenture.
Introduction:
During the 2025 budget deliberations, staff brought forward information outlining the
requirement to finalize the debenture process to borrow $6M with Infrastructure Ontario
(10) for Terrace Lodge within 120 days of substantial completion of the project.
Substantial completion has now been achieved, and staff have proceeded to implement
Council's direction received during the 2025 budget process. This report is provided to
share the timeline with Council and to ensure that obligations are met related to the By -
Law approval.
Background and Discussion:
The debenture process outlined by 10 has some tight timelines and must align with
scheduled Council meetings in order to finalize the funding by May 1, 2025. Signatures
and a By -Law to finalize the borrowings and supersede By -Law 22-35 are required to be
completed throughout this process to avoid penalties. Staff have reviewed the outlined
timelines internally and have confirmed with 10 that the milestones within this timeline
can be met. Below are further details received from 10 related to navigation of the
debenture process.
Page 2 of 10
Financial Implications:
FA 1969 - Amortizing Debenture in the amount of $6,000,000.00 for a 10 year term,
compounding Semi -Annually;
April 3, 2025
• Preliminary debenture docs will be emailed by 10. These documents will outline
the amount, term, and projects attached to each debenture to be issued on the
Closing Day.
Upon receipt of these documents, please contact your legal counsel to ensure that they
will be available to review the debenture by law, debenture certificate, supporting
certificates of the treasurer and clerk, and to sign the template legal opinion and
coordinate delivery of these documents to 10 prior to the Closing Day. They will also
need to be able to authorize the release of these documents from escrow to 10 on the
morning of the Closing Day.
April 8, 2025
Soft copy of the signed preliminary debenture docs to be received by 10, originals to
follow by courier
Name and contact information of law firm to be provided to 10. Please provide us with
the by-law number that you will be using to pass the Debenture By-law.
April 11, 2025
• Interest Rate confirmation emailed by 10 around noon - to be signed and sealed
by Mayor and Treasurer
• Signed and sealed Interest Rate confirmation to be received by 10 no later than
3pm (please email me the soft copy and the originals to be sent with final
debenture docs to the lawyer's office)
Please note: once the rate offer is signed and accepted, if the debenture by-law
does not get passed at the council meeting or if the municipality elects not to
take the debenture, the municipality will be required to pay a penalty as a result of
not closing the debenture on the scheduled date
April 16, 2025
• Final debenture documents (including the debenture by-law template, debenture
certificate and legal opinion letter) to be emailed by Infrastructure Ontario after
Interest Rate Confirmation is received
Upon receipt of these documents, please contact your legal counsel to
ensure that they will be available to review the debenture by law,
debenture certificate, supporting certificates of the treasurer and clerk, and
to sign the template legal opinion and coordinate delivery of these
documents to 10 prior to the Closing Day. They will also need to be able
to authorize the release of these documents from escrow to 10 on the
morning of the Closing Day.
Page 3 of 10
April 22, 2025 (council meeting date)
Debenture By -Law to be passed at Council meeting
April 25, 2025
• All original signed and sealed debenture documents to be received by
Infrastructure Ontario in PDF format, which will be held in escrow until
municipality's external counsel authorizes their release by email on the morning
of the Closing Date
May 1, 2025 (closing date)
• your external legal counsel must contact 10 Debenture Closings at
lelbeii)taiir�: cr loslir°)g § g�lii °).flra siirLictLiireoii)ia irlio,c,, by 10 a.m. on the morning of
closing to release the documents from escrow so that 10 may proceed with the
transaction
Advancement of the Strategic Plan:
Although the subject of this report does not directly relate to advancing a specific priority
in Council's Strategic Plan and relates more to general operations of the corporation, it
does directly relate to ensuring responsible and sustainable financial management for
the County.
Local Municipal Partner Impact:
�m
Communication Requirements:
�m
Conclusion:
The debenture will finalize $61VI in borrowings for the Terrace Lodge Redevelopment
Project. Staff bring this report forward to ensure that the timelines outlined by
Infrastructure Ontario are met in accordance with our contractual obligations.
All of which is Respectfully Submitted
Jennifer Ford
Director of Financial Services/Treasurer
Approved for Submission
Blaine Parkin
Chief Administrative Officer/Clerk
Page 4 of 10
Report to County Council
From: Peter Dutchak, Director of Engineering Services
Mike Hoogstra, Manager of Procurement & Risk
Date: April 8, 2025
Subject: Cold In -Place Asphalt Recycling (Tender No. 2025-T10) and Hot Mix Asphalt
Paving (Tender No. 2025-T11) - Tender Awards
Recommendation(s):
THAT Roto-Mill Inc. be selected to complete Cold In -Place Asphalt Recycling on various
roads, Tender No. 2025-T10 at a total price of $2,079,245.30 inclusive of a $100,000
contingency allowance and exclusive of H.S.T.; and,
THAT Brantco Construction be selected to complete Hot Mix Asphalt Paving on various
roads, Tender No. 2025-T11 at a total price of $7,795,770.10 (County Portion) inclusive
of a $250,000 contingency allowance and exclusive of H.S.T.; and,
THAT the Warden and Chief Administrative Officer be directed and authorized to sign
the contracts.
Introduction:
As part of the 2025 Capital Budget, tenders were advertised and issued as per the
County's Procurement Policy for Cold In -Place Asphalt Recycling and Hot Mix Asphalt
Paving on various roads.
Backaround and Discussion:
Cold In -Place Asphalt Recycling (Tender No. 2025-T10)
As part of the recommended 2025 Capital Budget, five (5) county roads will be
rehabilitated utilizing a Cold In -Place Asphalt Recycling with Expanded Asphalt Material
(CIREAM) technique in advance of hot mix asphalt paving.
The following roads are scheduled to be recycled this construction season:
1. Fingal Line (CR 16) between Iona Road and Currie Road — 10.4 km
2. Clinton Line (CR 11) between Sunset Road and Wonderland Road — 2 km
Page 5 of 10
3. Heritage Line (CR 38) between Talbot Line and Richmond — 1.7 km
4. Lyons Line (CR 48) between Putnam Road and Imperial Road — 5.3 km
5. Fruitridge Line (CR 51) between Sunset Road and the Railroad Crossing - .82 km
A total of seven (7) contractors downloaded tender documents for this project from the
������te. ic,,� r Three (3) contractors submitted electronic bids
ounty's bidding system II.�°�ua�.�..�"���:!':����...�.:�°'......................
for this tender which closed on March 25, 2025. Bids were received as follows:
Company
Bid Price'
(exclusive of HST)
Roto-M i II Inc.
$2,079,245.30
Lavis Contracting Co. Limited
$2,110,568.00
GIP Paving Inc.
$2,229,345.00
' Inclusive of a $100,000 contingency allowance.
Roto-Mill Inc. submitted the lowest compliant bid for the project at a total price of
$2,079,245.30 exclusive of HST.
Hot Mix Asphalt Paving (Tender No. 2025-T11)
As part of the approved 2025 Capital Budget, nine (9) roads and two (2) road shoulders
will receive hot mix asphalt resurfacing and new granular shoulders as part of a
rehabilitation projects or as stand-alone resurfacing projects, as detailed on the
appended map.
The following road sections are scheduled to be paved with asphalt this construction
season:
1. Fingal Line (CR 16) from Iona Road (CR14) to Currie Road (CR8) - 11.56km
2. Clinton Line (CR11) from Sunset Road to Wonderland Road - 2km
3. Heritage Line (CR 38) from Talbot Line to Curb in Richmond - 1.72km
4. Lyons Line (CR 48) from Imperial Road to Putnam Line - 5.57km
5. Fruitridge Line (CR 51) Sunset Drive to Railroad crossing - 0.83km
6. Talbot Line (CR3) from Dunborough Road to Currie Road - 16.37km
7. Avon Drive (CR 37) from Helder Road to Imperial Road - 1.86km
8. Calton Line (CR 45) from Richmond Road to Plank Line - 6.63km
9. Dexter Line (CR24) from Imperial Road to top of hill west - .75km
10. North side shoulder on John Wise Line (CR45) .3km
11. West side shoulder on Highbury Ave South of Mapleton Line .5km
In addition to the County Road sections noted above, two Southwold Township roads
were included in the County's tender this year.
A total of eight (8) contractors downloaded tender documents for this project from the
������te. ic,,� r Four (4) contractors submitted electronic bids
ounty's bidding system II.�°�ua�.�..�"���:!':����...�.:�°'......................
for this tender which closed on March 25, 2025. Bids were received as follows:
Page 6 of 10
Company
Bid Price' 2
(exclusive of HST)
Brantco Construction
$8,367,698.70
J-AAR Civil Infrastructures Limited
$8,923,683.00
Dufferin Construction Company
$9,330,413.00
GIP Paving Inc.
$10,218,000.00
' Inclusive of a $250,000 contingency allowance.
2 Total bid prices submitted, including County portion and Southwold Township portion.
Brantco Construction submitted the lowest compliant bid for the project at a total price of
$8,367,698.70 exclusive of HST.
Financial Implications:
The Cold In -Place Asphalt Recycling with Expanded Asphalt Material (CIREAM) tender
represents road rehabilitation activities for five (5) different projects within the 2025
capital budget. Sufficient project funds exist to accommodate the lowest bid received
for these projects and a projected budget surplus of $146,386.54 is anticipated. The
following summary of projected estimated costs is provided for review and will be
confirmed throughout the project:
CIREAM Tender Value $ 2,079,245.30
Net HST (1.76%) $ 36,594.72
Total Projected Costs' $ 2,115,840.02
Combined 2025 Capital Budget Allocationsz $ 2,262,226.56
Forecast Budget Surplus/(Deficit) $ 146,386.54
' Inclusive of a $100,000 contingency allowance.
2 Cumulative estimated project costs of CREAM activities within five (5) identified projects.
The Hot Mix Asphalt Paving tender represents road rehabilitation activities within eleven
(11) different projects within the 2025 capital budget. Sufficient project funds exist to
accommodate the lowest bid received for this project and a projected surplus of
$512,600.79 is anticipated. The following summary of projected estimated costs is
provided for review and will be confirmed throughout the project:
Hot Mix Asphalt Paving Tender Value (County Portion) $ 7,795,770.10
Net HST (1.76%) $ 137,205.55
Total Projected Costs' $ 7,932,975.65
Combined 2025 Capital Budget Allocationsz $ 8,445,576.44
Forecast Budget Surplus/(Deficit) $ 512,600.79
Page 7 of 10
Inclusive of a $250,000 contingency allowance.
2 Cumulative estimated project costs of paving activities within eleven (11) identified projects.
The bid prices also include `Provisional' items to pave road shoulders as designated
cycling lanes on Talbot Line (excluding Wallacetown) and Fingal Line in accordance
with the draft Cycling Master Plan (CMP) currently being developed as part of the
Transportation Master Plan. These `Provisional' items total a value of approximately
$962,000 and this work will be completed if the CMP is approved by Council. Council
will receive a report from staff seeking endorsement of the CMP in an upcoming
meeting.
The anticipated surplus for asphalt resurfacing was originally budgeted to facilitate the
resurfacing of Talbot Line through Wallacetown but was removed from the tender scope
until approval to implement cycling lanes, as part of the Cycle Master Plan (CMP) has
been approved by Council. If approved by Council, the paved shoulders as designated
cycling lanes will be installed along Talbot Line, including through Wallacetown, which
will necessitate the retrofitting of curb ramps, repaving the asphalt boulevard and other
activities. Therefore, the majority of the projected surplus will be used to fund the
implementation of the CMP in 2025, if approved by Council.
It should also be noted that any projected surplus' may be reduced to fund the potential
increase in the cost of asphalt cement material used in these contracts. A portion of
these project values is tied to the WTO Asphalt Cement Price Index", which is indirectly
tied to other oil commodity prices.
Advancement of the Strategic Plan:
Construction methods that utilize existing road building materials, such as Cold In -Place
Asphalt Recycling, minimizes the use of natural resources, reduces GHG emissions
from manufacturing and hauling those materials, is less expensive and a quicker activity
than conventional remove and replace methods of construction. These initiatives
advance the County's strategic strategy to achieve sustainable community growth and
to promote environmental sustainability.
Local Municipal Partner Impact:
Elgin's local municipal partner staff will be provided the details regarding the County's
2025 road projects. The County's asphalt resurfacing tender also included projects for
the Township of Southwold who will be provided the bid results and will enter into their
own agreement with the low bidder.
Communication Requirements:
Project sign boards will be installed at each project location in advance of all roadworks
and project details will be posted on the Municipal 511 platform.
A weekly capital project update will be circulated to Elgin's local municipal partners and
elected officials to advise them of the following weeks anticipated works.
Page 8 of 10
Conclusion:
Tenders for capital projects on County roads were issued and received for CIREAM and
Hot Mix Asphalt Paving. This work forms part of eleven (11) separate road projects
being completed in 2025. Work on these projects is expected to commence in May with
completion anticipated to be achieved by the end of October. A copy of the 2025
Construction Project Map is included for Council's information. The road sections
identified as `Rehabilitation' will receive asphalt recycling and asphalt paving, and the
road sections marked as `Resurfacing' will receive asphalt resurfacing only.
The work scope may include the asphalt paving of road shoulders to create cycling
lanes on Talbot Line and Fingal Line if the cycle master plan (CMP) is approved by
Council at an upcoming meeting.
As per the County of Elgin's Purchasing Policy, if change orders are required and the
cost increases above the tender amount approved by Council by less than 10%, and the
amount is within the overall budgeted project amount, work will proceed upon
authorization by the Director. However, if the cost increases above the tender amount
approved by Council by more than 10%, the Director will prepare a further report to
Council outlining the expenditures.
All of which is Respectfully Submitted
Peter Dutchak
Director of Engineering Services
Mike Hoogstra
Manager of Procurement & Risk
Approved for Submission
Blaine Parkin
Chief Administrative Officer/Clerk
Page 9 of 10
,,.
- - o
o
a
IS
uj
w o
JI r N
N
w
a
I.07
W:o 3 3
QM 6
N
v
El
vim,
IN
e
o
o
� da
ms I o
Iqm a
W
o M
o
to o_
.. /
a j a
w o
m
in
�Im
\
E E
\ \ E
. \ jx °N'
Cc
AllIr
Ay Im O N E
N E
O I`
2� A / A A V •. . .�° 2 U) H 2�' a�
do v a) a) aD o
h
•' r A A w /V v/ A. U 12� of Of UJ Co m m W
000
CL
uj
ol
V'
g \ \
% e
is� ......... ..