Loading...
February 11, 2010MUNICIPALITY OF WEST ELGIN AGENDA COUNCIL MEETING FEBRUARY 11, 2010 COUNCIL CHAMBERS, WEST ELGIN MUNICIPAL BUILDING DISCLOSURE OF PECUNIARY INTEREST ADOPTION OF AGENDA MINUTES (Al —A22) *January 7, 2010 Special Session January 7, 2010 Closed Session (under separate cover) *January 14, 2010 Council *January 28, 2010 Council *January 28, 2010 Public Meeting Zoning Amendment (Slaats) *January 28, 2010 Public Meeting Zone Amendment (Neil) BUSINESS ARISING FROM MINUTES DELEGATIONS 11:30 a.m. 1:30 p.m. 1:45 p.m. REPORTS (C1 -C9) 1. ROADS a) *Monthly Report Spriet Associates re: Port Glasgow Trailer Park sewage treatment system upgrade (B1) Consideration meeting MacDairmid Drain Nancy Murray, Optimist Club re: request for funding C opt/ Feb. 11110 Page 2 2. RECREATION a) *Monthly Report b) `Report re: Water Reel Irrigation c) Wages for summer employees 3. BUILDING a) *Monthly Report for July, 2009 b) *Monthly Report for August, 2009 c) *Monthly Report for September, 2009 d) *Monthly Report for October, 2009 e) *Monthly Report for November, 2009 f) *Monthly Report for December, 2009 g) *Year -End Report 4. WATER a) *Monthly Report 5. BY -LAW ENFORCEMENT a) *Monthly Report 6. DRAINS a) Drain Maintenance grant 7. WEST ELGIN PRIMARY SYSTEM 8. ADMINISTRATION a) *Policy for Closed Meeting Investigations b) *Four Counties Transit Services Facts 2008 c) Employee Benefit Plan Feb. 111 10 Page 3 ACCOUNTS CORRESPONDENCE (D1 D11) COUNCIL CONSIDERATION RECOMMENDED: 1.* Tay Valley Township request for support of a resolution regarding Municipal property assessment and assistance to retired persons living on fixed incomes; 2.* Municipality of West Grey request for support of a resolution regarding the Green Energy and Green Economy Act; 3.* Municipality of West Grey request for support of a resolution to place an indefinite moratorium on industrial wind turbines; 4.* Township of Southwold request for support of a resolution regarding exotic animals; 5.* Township of South Stormont request for support of a resolution with regards to the accountability of Conservation Authorities; 6.* Dillon Consulting request an exemption for the Noise Control By -Law; 7.* Canada Day Committee request for support for activities for Canada Day; 8.* Devin Pearson, request to waive fees West Elgin Community Centre; 9.* Elgin County Conference Series: Evolution of the Harvest; RECOMMENDED TO ACCEPT FILE: 10. AMO Office of the President increase in membership fees and registration for annual conference; Summary of Watch File Issue; New Ontario Minister of Municipal Affairs and Housing; Government Releases Draft Regulations on Source Protection Plan Contents and Process; 2010 Pre budget Submission Elgin Group Police Services Board Minutes of November 18, 2009 meeting; Steve Peters support for bridge designation, Furnival Road Highway 401; Steve Peters support of a "smart moratorium" for disputed school closures; 11. Elgin St. Thomas Public Health launch of Active Elgin 2010 Guide; Feb. 111 10 Page 4 BY -LAWS By -law No. 2010 -11 By -law No. 2010 -12 By -law No. 2010 -13 By -law No. 2010-14 MINUTES (El-El) *West Elgin Chamber of Commerce December 7, 2009 OTHER BUSINESS (F1 -F2) 1. Council announcements 2. Closed session property matter Information enclosed CONFIRMING BY -LAW ADJOURNMENT NEXT MEETINGS: February 21 -24, 2010 February 25, 2010 Adopt procedure for closed meeting investigations MacDairmid Drain (first and second reading) Interim Tax Rate Zoning Amendment (Neil) OGRAIROMA conference, Toronto Council MEMBERS PRESENT: STAFF PRESENT: SUBJECT: CLOSED SESSION MINUTES OF THE CORPORATION OF THE MUNICIPALITY OF WEST ELGIN SPECIAL SESSION JANUARY 7, 2010 Mayor Graham Warwick, Deputy Mayor Wiehle Councillors: Trudy Balint, Mary Bodnar, Jonathan Wolf Joanne Groch Norma Bryant Paul VanVaerenbergh Administrator /Treasurer Clerk Road Superintendent This special session was called for the purpose of wage negotiations. RES. NO. 1 Moved by Bodnar Seconded by Balint RESOLVED that the Council of the Municipality of West Elgin adjourn to a closed session to discuss labour relations or employee negotiations. DISPOSITION: Carried RES. NO. 2 Moved by Balint Seconded by Wiehle RESOLVED that the Council of the Municipality of West Elgin do now rise and report. DISPOSITION: Carried Council discussed the requests made by staff and also the remuneration for Council. SUBJECT: 2010 WAGE NEGOTIATIONS RES. NO. 3 Moved by Balint Seconded by Wiehle RESOLVED that Council authorize a 2% increase for Council and employees for 2010 and that the necessary by -law be prepared. SUBJECT: CONFIRMATION BY -LAW RES. NO. 4 Moved by Balint Seconded by Wiehle RESOLVED that the mover be granted leave to introduce a By -Law to confirm the proceedings of the special meeting of Council held on January 7 2010 and this shall be the first and second reading and provisional adoption thereof. DISPOSITION: Carried January 7, 2010...Pg 2 of 2 RES. NO. 5 Moved by Wiehle Seconded by Balint RESOLVED that a By -law to confirm the proceedings of the special meeting of Council held on January 7 2010 be now read a third time and finally passed, signed, sealed and numbered By -law Number 2010 -01 Confirming By -law January 7 20010. DISPOSITION: Carried SUBJECT: ADJOURNMENT RES. NO. 6 Moved by Bodnar Seconded by Wolf RESOLVED that this Special Meeting of Council adjourn at 11:55 a.m. to meet again on January 14 2010. DISPOSITION: Carried These minutes were adopted on the 11 day of February, 2010. Mayor MEMBERS PRESENT: STAFF PRESENT: SUBJECT: MINUTES RES. NO. 2 Moved by Bodnar Seconded by Wolf December 10, 2009 December 10, 2009 December 10, 2009 December 17, 2009 December 17, 2009 DISPOSITION: Carried MINUTES OF THE CORPORATION OF THE MUNICIPALITY OF WEST ELGIN WEST ELGIN COUNCIL CHAMBERS January 14, 2010 Joanne Groch Norma Bryant Paul VanVaerenbergh Lloyd Jarvis Jeff Slater DECLARATION OF PECUNIARY INTEREST: None SUBJECT: ADOPTION OF AGENDA RES. NO. 1 Moved by Balint Seconded by Wiehle RESOLVED that the Council of the Municipality of West Elgin approves the agenda for January 14, 2010 as printed and circulated with the following additions: Report re: Fee structure for Recreation Centre Quotes for repairs to pumps at West Lorne Sewage Treatment Plant DISPOSITION: Carried Council Court of Revision Court of Revision Council Public Meeting SUBJECT: BUSINESS ARISING FROM MINUTES Mayor Graham Warwick, Deputy Mayor Bernie Wiehle Councillors Trudy Balint, Mary Bodnar, Jonathan Wolf Ad ministrator /Treasurer Clerk Roads Superintendent Water Superintendent Recreation Superintendent Segedin Drain Wiehle -King Drain Zoning Amendment (Swain) Councillor Bodnar enquired about port -a- potties in West Lorne. Councillor Wolf reported that he had spoken with a business owner about locating on his property and the owner was concerned about vandalism after hours. Councillor Balint reported that she has given consideration to a location in West Lorne and doesn't believe there is a visible location available and as a result did not approach any owners. Councillor Wolf noted that he had not received any further complaints. January 14110...Pg 2 of 10 The Mayor reported that he had spoken with the Chief Building Official about the KSR building permit. A conditional building permit has been issued for foundations but they are still waiting for drawings to be submitted as the foundation drawings were changed and the sprinkler system to be resolved. SUBJECT: BY -LAW NO. 2010 -02 AUTHORIZE AGREEMENT (RinC) RES. NO. 3 Moved by Balint Seconded by Bodnar RESOLVED that the mover be granted leave to introduce a By -Law to authorize the execution of an agreement between the Municipality of West Elgin and Her Majesty in Right of Ontario, as represented by the Minister of Energy and Infrastructure and the Minister of Health Promotion and this shall be the first and second reading and provisional adoption thereof. DISPOSITION: Carried RES. NO. 4 Moved by Bodnar Seconded by Balint RESOLVED that a By -law to authorize the execution of an agreement between the Municipality of West Elgin and Her Majesty in Right of Ontario, as represented by the Minister of Energy and Infrastructure and the Minister of Health Promotion and be now read a third time and finally passed, signed, sealed and numbered By -law Number 2010-02 Agreement RinC DISPOSITION: Carried SUBJECT: ROAD DEPARTMENT REPORT The Road Superintendent presented his monthly report. He reported that the County requested maintenance in the form of brushing along bridges. Further, brushing is being done on roads in preparation of gravel. Signs are being replaced or repaired as needed. SUBJECT: RECREATION DEPARTMENT REPORT The Recreation Superintendent presented his monthly report. SUBJECT: FEE STRUCTURE FOR THE RECREATION CENTRE Council reviewed a report from the Recreation Superintendent. Fees have been waived for services clubs and community groups for fundraising activities. The fees applied to private users are not consistent. Consideration could be given to reduce fees for seniors, which applies to youth programs, as they are offering programs to encourage activity for seniors. Councillor Balint enquired if the users are providing third party liability? After discussion Council directed that a policy should be developed that no fees would be required for fundraising and community services activities. SUBJECT: WATER DEPARTMENT REPORT The Water Superintendent presented his monthly report. He reported that there are 21 fire hydrants in the Crinan area that are filling up with water and freezing. He is investigating what can be done. As a result there are 14 fire hydrants that are covered and cannot be used. January 14110...Pg 3 of 10 SUBJECT: BY -LAW ENFORCEMENT Council reviewed the monthly report. The Clerk reported that #225 is before the courts. SUBJECT: TENDER FOR SEGEDIN DRAIN Council received the following tenders for the Segedin Drain: Van Bree Drainage Bulldozing Ltd. Timmermans Drainage Excavating A.G. Hayter Contracting Ltd. RES. NO. 5 Moved by Wiehle Seconded by Balint RESOLVED that the Council of the Municipality of West Elgin accepts the tender of Van Bree Drainage Bulldozing in the amount of $14,805.00 plus GST for Segedin Drain. DISPOSITION: Carried SUBJECT: TENDER FOR WIEHLE -KING DRAIN Council received the following tenders for the Wiehle -King Drain: Van Bree Drainage Bulldozing Ltd. Timmermans Drainage Excavating A.G. Hayter Contracting Ltd. RES. NO. 6 Moved by Bodnar Seconded by Wolf RESOLVED that the Council of the Municipality of West Elgin accepts the tender of Van Bree Drainage Bulldozing in the amount of $19,229.00 plus GST for Wiehle -King Drain. DISPOSITION: Carried SUBJECT: 2010 COUNCIL MEETING SCHEDULE SUBJECT: WEST LORNE HERITAGE HOMES PHASE II TOTAL (plus taxes) $14,805.00 $19,159.00 $17,950.00 TOTAL (plus taxes) $19,229.00 $21,232.00 $22,240.00 Council reviewed a report from the Clerk regarding the meeting schedule for 2010. RES. NO. 7 Moved by Balint Seconded by Bodnar RESOLVED that the Council of the Municipality of West Elgin approves the following changes to 2010 meeting schedule: 1. That the council meeting scheduled for November 11 2010 be changed to Wednesday, November 10 2010. 2. That the December meeting schedule be changed to meet on the third Thursday only and that the procedure by -law be so amended. 3. That the council meeting schedule for July and August be changed to meet on July 15 and August 12 on a trial basis for 2010, to be evaluated by Council in 2011. DISPOSITION: Carried Council reviewed a report from the Clerk outlining the items that need to be completed as well as cost implications. The Clerk reported that the Planner would be reporting on January 14/10...Pg 4 of 10 planning items at the next Council meeting. Discussion took place regarding the extension of Isabella Street to Main Street. Costs to construct the road plus purchase of the lands should be investigated. RES. NO. 8 Moved by Wolf Seconded by Balint RESOLVED that Council authorize the hiring of Bruce Lyle to negotiate the purchase of lands in West Lorne. DISPOSITION: Carried SUBJECT: DOG CONTROL The Administrator/Treasurer reported that the Animal Control Officer has requested an increase of 3% commencing in 2011. She reported that the fees collected for dog tags should be evaluated, as there is a small deficit. Should we look at increasing penalty fees or increase the dog tag fees? After discussion Council directed that a $5.00 increase be applied for 2010 and that an increase of 3% was agreeable for the Animal control Officer commencing in 2011. The necessary by -law to be prepared for Council approval. SUBJECT: GIS MAINTENANCE Council reviewed a proposal from Associated Engineering for maintenance to the GIS system for 2010. RES. NO. 9 Moved by Balint Seconded by Wiehle RESOLVED that the Council of the Municipality of West Elgin accepts the quotation of Associated Engineering in the amount of $5,850 plus taxes for 2010 Data Maintenance. DISPOSITION: Carried SUBJECT: REMUNERATION FOR COUNCIL AND STAFF The Administrator /Treasurer requested Council direction on two matters relating to remuneration. Council directed that the same night shift premium would apply to both night shift road employees. Further, that the Mayor and Deputy Mayor be paid the same for the second council meeting of the month for 2010. SUBJECT: MARINA IMPROVEMENTS The Administrator reported that the Yacht Club are submitting an application under the Community Adjustment Fund. The grant notes a commitment of 10% from the Yacht Club and the municipality. The Mayor noted that this contribution is leveraging money into the community. The project benefits the municipality and stabilizes the shoreline. Councillor Balint noted that this is cheap compared to hiring a harbour master. RES. NO. 10 Moved by Wiehle Seconded by Balint WHEREAS a study has been completed for improvements to the marina at Port Glasgow by Shoreplan Engineering, THEREFORE BE IT RESOLVED that the Council of the Municipality of West Elgin supports Option 2B as the preferred option, AND FURTHER BE IT RESOLVED that Council supports the application under the Community Adjustment Fund by the Port Glasgow Yacht Club for marina improvements. DISPOSITION: Carried January 14110..,Pg 5 of 10 SUBJECT: QUOTATION FOR REPAIRS AT WEST LORNE SEWAGE TREATMENT PLANT The Administrator reported that repairs are required to two pumps at the West Lorne Sewage Treatment Plant. The contractor determined what was needed after evaluating the pumps and provided a quotation for repair or replacement. RES. NO. 11 Moved by Bodnar Seconded by Wiehle RESOLVED that the Council of the Municipality of West Elgin accepts the quotation of Ampro electric Ltd. in the amount of $5,255.55 plus taxes for repairs to two pumps at the West Lorne Sewage Treatment Plant. DISPOSITION: Carried DELEGATION: SHUFFLEBOARDERS and CARPET BOWLERS Also in attendance: Les Welch (President), Mary Taylor (Treasurer), Adam Hrabinski (Vice President) Mr. Welch referred to their letter of December 10 where they asked for a reduction of their fees to $50.00 per month. The Mayor noted that Council discussed the fee structure this morning and noted that some groups don't pay fees or pay reduced fees. Mrs, Taylor reported that their membership has dropped from 50 members in 1997 -98 to 25 members in 2009. At $25.00 per year membership, they cannot pay $100.00 per month. They have reduced their usage to 9 months to save money. Membership voted against raising fees. Their biggest problem is membership. The Deputy Mayor noted that advertising could help increase membership. Councillor Balint noted that advertising could be funded through the Recreation budget. After discussion it was agreed that the monthly fee would be reduced for 2010 and be re- evaluated in 2011. Further the municipality would fund the group for advertising. The group to prepare and submit the advertisements and invoice the municipality. Councillor Wolf noted that this may solve their problem but the fee structure policy should be reviewed by future Council with the Recreation Superintendent. RES. NO. 12 Moved by Bodnar Seconded by Balint RESOLVED that Council reduce the monthly fee for Shuffleboarders and Carpet Bowlers to $50.00 per month for 2010 and reimburse the group for 3 advertisements in the Chronicle to try to increase membership. DISPOSITION; Carried DELEGATION: PAUL TUNKS, CRIMESTOPPERS Mr. Tunks reported to Council that Crimestoppers is looking to promote their tip phone number and are suggesting signs be placed at the entrances to Elgin County. These signs would promote the tip line, educate the community and act as a deterrent to crime. It was noted that the best locations are on county roads, which will require County of Elgin approval. Discussion took place regarding placing small signs on municipal properties such as the beach and two parks. Crimestoppers will approach the County for approval on county roads. (v6 January 14110..,Pg 6 of 10 SUBJECT: ACCOUNTS RES. NO. 12 Moved by Wiehle Seconded by Bodnar RESOLVED that the Mayor and Administrator /Treasurer are hereby authorized to sign Payment Voucher #1 amounting to $732,764.93 in settlement of General, Road, Water and Arena Accounts (including cheques: 4639 4895). DISPOSITION: Carried SUBJECT: CORRESPONDENCE 1.* County of Grey request for support of a resolution regarding concerns over Bill 150 Instruction: File 2.* City of Kawartha Lakes request for support of a resolution regarding heath concerns of wind turbine projects Instruction: RES. NO. 14 Moved by Wolf Seconded by Balint RESOLVED that Council of the Municipality of West Elgin is in support of a resolution put forth by the City of Kawartha Lakes regarding Bill 150, Green Energy and Green Economy Act. DISPOSITION: Carried 3.* City of Oshawa request for support of a resolution regarding condominium Superintendents Key Holders Instruction: File 4.* Tiny Tots Co- operative Nursery School request to waive fees for use of West Elgin Recreation Centre Instruction: RES. NO. 15 Moved by Balint Seconded by Wiehle RESOLVED that the Council of the Municipality of West Elgin authorize the waiving of rental fees for the use of the West Elgin Recreation Centre on January 23, 2010 from 8:00 a.m. to 11:00 p.m. for the "Scrap- a -Thon" being hosted by the Tiny Tots Co- operative Nursery School. DISPOSITION: Carried 5.* Township of Mapleton request for support of a resolution regarding studies by Ministry of Environment for wind energy projects Instruction: File 6.* West Elgin Rodeo request to waive fees for temporary zoning change Instruction: RES. NO. 16 Moved by Balint Seconded by Wiehle RESOLVED that the Council of the Municipality of West Elgin authorize the waiving of zoning amendment application fees for lands owned by Ken and Joan Neil for a temporary use by -law for the Dodge Rodeo. DISPOSITION: Carried January 14110... Pg 7 of 10 7.* CUPW copy of Charter and petition to revise Instruction: RES. NO. 17 Moved by Balint Seconded by Wiehle WHEREAS the federal government is allowing Canada Post to close public post offices in spite of a moratorium on closures in rural and small towns, and WHEREAS the government expects Canada Post to inform people at least one month prior to dosing, moving or amalgamating their public post office and explore options that address people's concerns; and WHEREAS a month is an inadequate amount of time for a whole community to discuss a closure and explore options; and WHEREAS public post offices connect communities throughout this vast land, helping us to overcome differences and distances; and WHEREAS public post offices play a key role in our social and economic life by providing the infrastructure that healthy communities need to thrive and businesses to grow. THEREFORE BE IT RESOLVED that the Council of the Municipality of West Elgin call on the Government of Canada to instruct Canada Post to maintain and improve its network of public post office and maintain rural postal delivery and to consult with the public, their elected representatives, postal unions and other major stakeholders to develop a uniform and democratic process for making changes to this network. DISPOSITION: Carried 8.* Arts Cookery Bank letter of thanks Instruction: File 9.* Dennis Joyce letter concerning black smoke from Erie Flooring Instruction: Councillor Wolf will discuss with Erie Flooring 10.* Dillon Consulting Rehabilitation of Four Bridges over 401 Instruction: File 11.* Rodney Aldborough Agriculture Society request for support for liquor application for Quiz night Instruction: RES. NO. 18 Moved by Wiehle Seconded by Balint RESOLVED that Council has no objections to the Rodney Aldborough Agricultural Society holding a quiz night including the serving of alcohol on Saturday January 30, 2010 at the West Elgin Recreation Centre. DISPOSITION: Carried 12.* Rodney Aldborough Agriculture Society request to waive fees for use of West Elgin Recreation Centre Instruction: RES. NO. 19 Moved by Bodnar Seconded by Wolf RESOLVED that the Council of the Municipality of West Elgin authorize the waiving of rental fees for the use of the West Elgin Recreation Centre on January 30, 2010 from 6:00 to 12:00 p.m. (midnight) for the Quiz Night being hosted by the Rodney Aldborough Agricultural Society. DISPOSITION: Carried January 14/10,..Pg 8 of 10 13.* Rodney Aldborough Agriculture Society invitation to Annual meeting Instruction: The Mayor will attend. 14.* Rodney Kiwanis Club request to waive fees for use of West Elgin Recreation Centre Instruction: RES. NO. 20 Moved by Balint Seconded by Wiehle RESOLVED that the Council of the Municipality of West Elgin waives the user fee for the use of the West Elgin Recreation Centre warm room for the Rodney Kiwanis Club to host a card party fundraiser on March 13, 2010 from 6:00 to 11:00 p.m. DISPOSITION: Carried 15. AMO Auditor General's 2009 Report Proposed Energy Consumer Protection Act Ontario Municipal Partnership Fund Allocations Announcement Instruction: File 16. Foundation for Rural Living thank -you letter Instruction: File 17. Elgin County Land Division Committee Notice of Decision Application No. E78/09, West Lorne Holdings Ltd. Instruction: File 18. Elgin County Land Division Committee Notice of Decision Application No. E84/09, Port Glasgow Yacht Club Instruction: File 19. Elgin County Land Division Committee— Notice of Decision Application No. E85109, Robert A. Miller, Audrey H. Miller and Norman A. Miller Instruction: File 20. Elgin County Land Division Committee Notice of Decision Application No. E86/09, Robert A. Miller Instruction: File 21. Elgin County Land Division Committee Notice of Decision Application No. E 89/09, Adrian Dewild Instruction: File 22. Natural Resources Canada Fall 2009 Edition Newsletter Instruction: File 23. Homeless Partnering Strategy Outreach Communities Ontario Proposals Instruction: File 24. Trans Canada Trail Annual Report Instruction: File 25. Ontario Ministry of Health Promotion request to endorse Policy framework on Affordable Access to Recreation for Ontarians Instruction: File Waste Management Graham Warwick, Bernie Wiehle, Jonathan Wolf West Elgin Recreation Trudy Balint, Jonathan Wolf West Lorne /Rodney Fire Department Jonathan Wolf Bernie Wiehle West Elgin Community Centre (Arena) Trudy Balint, Mary Bodnar Water Management All members of Council Police Committee Trudy Balint, Mary Bodnar LTVCA Mary Bodnar Marina Board Graham Warwick, Bernie Wiehle January 14/10...Pg 9 of 10 26. Ministry of Finance Ontario Municipal Partnership Fund allocations 2010 Instruction: File 27. South West LHIN Highlights December, 2009 Instruction: File 28. MEPCO AMO OMERS pension plan Instruction: File RES. NO. 21 Moved by Bodnar Seconded by Balint RESOLVED that the correspondence be dealt with as per the instructions of Council as noted. DISPOSITION: Carried SUBJECT: BY -LAW NO. 2009 -84 SEGED €N DRAIN RES. NO. 22 Moved by Wolf Seconded by Wiehle RESOLVED that a by -law to provide for drainage works in the Municipality of West Elgin in the County of Elgin to be called and known as the Segedin Drain be now read a third time and finally passed, signed, sealed and numbered By -law Number 2009 -84 Segedin Drain. DISPOSITION: Carried SUBJECT: BY -LAW NO. 2009 -85 WIEHLE -KING DRAIN RES. NO. 23 Moved by Balint Seconded by Wolf RESOLVED that a by -law to provide for drainage works in the Municipality of West Elgin in the County of Elgin to be called and known as the Wiehle King Drain be now read a third time and finally passed, signed, sealed and numbered By -law Number 2009 -85 Wiehle -King Drain. DISPOSITION: Carried MINUTES: *West Elgin Chamber of Commerce December 7, 2009 SUBJECT: COMMITTEE APPOINTMENTS RES. NO. 24 Moved by Wolf Seconded by Bodnar RESOLVED that Council of the Municipality of West Elgin approves the following committee appointments to commence January 1, 2010 until November 30, 2010 Parent -Child Resource Centre Trudy Balint Chamber of Commerce Bernie Wiehle, Jonathan Wolf Elder Care Strategy Mary Bodnar _Four Counties Transit Graham Warwick Fair Board Bernie Wiehle MPoWER Mary Bodnar, Graham Warwick West Lorne Heritage Homes Bernie Wiehle Participation for which mileage only is paid for attendance: Friends of Four Counties Health Services Mary Bodnar, Graham Warwick Small Schools Coalition Rural Schools Graham Warwick Economic Development activities Graham Warwick, Bernie Wiehle January 14/10...Pg 10 of 10 RES, NO. 24 cont'd DISPOSTION: Carried SUBJECT: CONFIRMATION BY -LAW RES. NO. 25 Moved by Wolf Seconded by Bodnar RESOLVED that the mover be granted leave to introduce a By -Law to confirm the proceedings of the meeting held on January 14' 2010 and this shall be the first and second reading and provisional adoption thereof. DISPOSITION: Carried RES, NO. 26 Moved by Bodnar Seconded by Wolf RESOLVED that a By -law to confirm the proceedings of the meeting held on January 14`", 2010 be now read a third time and finally passed, signed, sealed and numbered By -law Number 2010-03-- Confirming By -law January 14 2010 DISPOSITION: Carried SUBJECT: ADJOURNMENT RES. NO. 27 Moved by Wiehle Seconded by Balint RESOLVED that this Regular Meeting of Council shall adjourn at 4:10 p.m. to meet again January 28, 2010. DISPOSITION: Carried These minutes were adopted on the 11 day of February, 2010. Mayor Clerk MINUTES OF THE CORPORATION OF THE MUNICIPALITY OF WEST ELGIN WEST ELGIN COUNCIL CHAMBERS JANUARY 28, 2010 MEMBERS PRESENT: Mayor Graham Warwick, Deputy Mayor Bernie Wiehle Councillors Trudy Balint, Jonathan Wolf, Mary Bodnar STAFF PRESENT: Joanne Groch Administrator /Treasurer Norma Bryant Clerk ALSO PRESENT: Ted Halwa Planning Consultant DECLARATION OF PECUNIARY INTEREST: None SUBJECT: ADOPTION OF AGENDA RES. NO. 1 Moved by Bodnar Seconded by Wiehle RESOLVED that the Council of the Municipality of West Elgin approves the agenda for January 28, 2010 as printed and circulated. DISPOSITION: Carried Council recessed to hold two public meeting on Zoning Amendments (Slaats Neil) and resumed their meeting thereafter. SUBJECT: BROWNFIELDS FINANCIAL TAX INCENTIVE PROGRAM Also in attendance: John Diane Slaats The Planner presented a report outlining the steps for participation in the Province's 'Brownfields Financial Tax Incentive Program'. The incentive program is available only after much of the work has been completed and costs incurred. SUBJECT: HERITAGE TERRACE Also in attendance: Malcolm Ross, Robert White, Doug Staddon The Planner presented a report regarding the proposed site plan and rezoning. More information is required to determine what zoning standards, i.e. parking, are not being met and should be part of the rezoning by -law. Mr. Ross noted that 50% of the 16 existing units have cars; CHC staff uses the balance. He is requesting the zoning be enacted to show that the project is ready when the application is filed in March. They are now considering relocating the proposed January 28110...Pg 2 of 6 community centre to an area in the front parking area. This would allow the second building to be closer. Council directed that a public meeting be scheduled to rezone the lands as deemed necessary by the Planner. Further, they agreed that the parking requirements be reduced to one per unit. Mr. Ross agreed to have revised plans available for review at the public meeting. Discussion took place regarding the need for a survey and extension of Isabella Street. Staff referred to the report dated January 14"' regarding items to be considered for this project. Staff after researching the need for a survey, are of the opinion that a survey is necessary. RES. NO. 2 Moved by Wiehle Seconded by Balint RESOLVED that Council direct staff to investigate the requirements /necessity for a survey to transfer the lands to West Lorne Heritage Homes and if required that a survey be undertaken. DISPOSITION: Carried SUBJECT: PROPOSED SEVERANCE LOT 9. CONCESSION 1 (BEAUREGARD) The Planner presented a report on a proposed severance on Lot 9, Concession 1. The proposal is to sever the dwelling and convey the balance of the lands (18.1 hectares) to the adjacent property. The Planner is suggesting the rear lot depth be shortened to 3 feet from the existing accessory buildings. The applicant has agreed to this revision. Discussion took place regarding the width of the proposed lot. The existing buildings are set back a considerable distance from the road, with a laneway access. Council discussed the issue of the amount of agricultural land being lost due to the proposed frontage. What will happen with the lands adjacent to the laneway? Council agreed that the lot should be a 'flag" shape with the narrow laneway width at the road and widen to accommodate the existing buildings at the rear and decrease the lot depth as discussed. If the applicant does not agree with this requirement, he will have to speak with Council. SUBJECT: CLASS EA MARINA IMPROVEMENTS Council referred to correspondence item #1 from the Ministry of Environment and after discussion agreed that all items raised in this letter have been addressed. The Planner to advise the Ministry. SUBJECT: MARINA IMPROVEMENTS PERMITS APPROVALS The Planner reported that approval has been received from the Lower Thames Valley Conservation Authority. Approval is still required from the Department of Fisheries Oceans (DFO) and the Ministry of Natural Resources (MNR). DFO approval is required first. Consultation with DFO will involve providing the necessary background, what needs to be done and the fish habitat compensation. RES. NO. 3 Moved by Balint Seconded by Wiehle RESOLVED that Council authorize the expenditure of up to $5,000.00 for permits and approvals tasks for the marina improvements project. DISPOSITION: Carried January 28/10...Pg 3 of 6 The Planner left the meeting. DELEGATION: GRACE MCGARTLAND RE: ARTS COOKERY BANK Ms. McGartland attended Council to provide an update on the Arts Cookery Bank project. They are pleased with the progress and are working to get the project completed by June. They are asking for the municipality's help in gaining public support of the project by talking about the positives of the project. She provided a card that gives a brief description of what they do and outlined future projects. Their next fundraising is selling "Heritage Pathway" stones. DELEGATION: PAT WATTERWORTH RE: INTERNATIONAL PLOWING MATCH Ms. Watterworth outlined the two Beautification Challenges that are available individual and community. June 1 is the entry deadline. Entries include a photo, completion of entry form and $20.00. The idea is to improve curb appeal throughout West Elgin and Elgin County. Grants are available if completed by March 31 She noted that West Elgin Council had accepted a challenge from the Township of Southwold. DELEGATION: JOHN GAWLEY, COMMUNITY SAFETY NET RE: SMART CHOICES FOR LIFE Mr. Gawley provided copies of two documents that are distributed to grades 4 and 6 every year. The documents are entitled: "Public Heath' and "Drug Safety They are looking for support for purchasing the books for West Elgin students. They need funding for 120 books at $15.00 each. Forward to budget consideration. DELEGATION: WENDI DUPUIS RE: MUNICIPAL PARK PROPERTY MANAGEMENT PROPERTY LEASE OPTION Ms. Dupuis presented Council with a review of a property lease option currently practised by Chatham -Kent at the Mitchell's Bay marina campground. Chatham -Kent manages the contract and collects the lease payment, which goes into general revenue. The contract is 25 years. Part of the contract is maintenance, repairs and improvements to the infrastructure. Ms. Dupuis wanted Council to have this information prior to the presentation of the Port Glasgow Trailer Park budget in February. SUBJECT: ACCOUNTS RES. NO. 4 Moved by Bodnar Seconded by Wiehle RESOLVED that the Mayor and Administrator/Treasurer are hereby authorized to sign Payment Voucher #1A amounting to $284,438.92 in settlement of General, Road, Water and Arena Accounts (including cheques: 4896 5016). DISPOSITION: Carried SUBJECT: CORRESPONDENCE 1.* Ministry of Environment re: Class EA marina improvements Instruction: See discussion above 2.* Joe Preston, MP invitation to Pre Budget Consultation Instruction: Deputy Mayor attended the meeting. January 28 /10...Pg 4 of 6 SUBJECT: BY -LAW NO. 2010 -04 FEES CHARGES ADMINISTRATION RES. NO. 5 Moved by Balint Seconded by Wiehle RESOLVED that the mover be granted leave to introduce a By -Law to establish various fees and tariffs for services provided by the Administration Department of the municipality and this shall be the first and second reading and provisional adoption thereof. DISPOSITION: Carried RES. NO. 6 Moved by Wiehle Seconded by Balint RESOLVED that a By -law to establish various fees and tariffs for services provided by the Administration Department of the municipality be now read a third time and finally passed, signed, sealed and numbered By -law Number 2010 -04 Fees Charges Administration DISPOSITION: Carried SUBJECT: BY -LAW NO. 2010-05 AUTHORIZE AGREEMENT WITH UPPER THAMES VALLEY CONSERVATION AUTHORITY RES. NO. 7 Moved by Bodnar Seconded by Wolf RESOLVED that a by -law to authorize the execution of an agreement between the Municipality of West Elgin and the Upper Thames River Conservation Authority to provide for funding for technical studies for Source Water Protection Assessment Report be now a first and second and provisionally adoption thereof. DISPOSITION; Carried RES. NO. 8 Moved by Wolf Seconded by Bodnar RESOLVED that a by -law to authorize the execution of an agreement between the Municipality of West Elgin and the Upper Thames River Conservation Authority to provide for funding for technical studies for Source Water Protection Assessment Report be now read a third time and finally passed, sealed and numbered By -law Number 2010 -05 Agreement Upper Thames Conservation Authority (SWP) DISPOSITION: Carried SUBJECT: BY -LAW NO. 2010 -06 AMEND PROCEDURE BY -LAW 2007 -112 RES. NO. 9 Moved by Bodnar Seconded by Wolf RESOLVED that the mover be granted leave to introduce a By -Law to amend By -law No. 2007 -112, being a by -law to govern the calling, place and proceedings of meetings and this shall be the first and second reading and provisional adoption thereof. DISPOSITION: Carried RES. NO. 10 Moved by Wolf Seconded by Bodnar RESOLVED that a By -law to amend By -law No. 2007 -112, being a by -law to govern the calling, place and proceedings of meetings be now read a third time and finally passed, signed, sealed and numbered By -law Number 2010 -06 Amend Procedure By -law 2007 -112 DISPOSITION: Carried January 28110...Pg 5 of 6 SUBJECT: BY -LAW NO. 2010-07 COUNCIL REMUNERATION 2009 RES. NO. 11 Moved by Wiehle Seconded by Balint RESOLVED that the mover be granted leave to introduce a By -Law to provide for remuneration for members of Council for 2009 and this shall be the first and second reading and provisional adoption thereof. DISPOSITION: Carried RES. NO. 12 Moved by Balint Seconded by Wiehle RESOLVED that a By -law to provide for remuneration for members of Council for 2009 be now read a third time and finally passed, signed, sealed and numbered By -law Number 2010 -07 Council remuneration 2009 DISPOSITION: Carried SUBJECT: BY -LAW NO. 2010 -08 COUNCIL REMUNERATION 2010 RES. NO. 13 Moved by Wolf Seconded by Bodnar RESOLVED that the mover be granted leave to introduce a By -Law to provide for remuneration for members of Council for 2010 and this shall be the first and second reading and provisional adoption thereof. DISPOSITION: Carried RES. NO. 14 Moved by Bodnar Seconded by Wolf RESOLVED that a By -law to provide for remuneration for members of Council for 2010 be now read a third time and finally passed, signed, sealed and numbered By -law Number 2010 -08 Council remuneration 2010 DISPOSITION: Carried SUBJECT: BY -LAW NO. 2010 -09 EMPLOYEE REMUNERATION RES. NO. 15 Moved by Wiehle Seconded by Balint RESOLVED that the mover be granted leave to introduce a By -Law to set rates of remuneration and expenses for municipal officials and employees for the calendar year 2010 and this shall be the first and second reading and provisional adoption thereof. DISPOSITION: Carried RES. NO. 16 Moved by Balint Seconded by Wiehle RESOLVED that a By -law to set rates of remuneration and expenses for municipal officials and employees for the calendar year 2010 be now read a third time and finally passed, signed, sealed and numbered By -law Number 2010 -09 Employee Remuneration DISPOSITION: Carried SUBJECT: COUNCIL ANNOUNCEMENTS Councillor Wolf reported that he had met with Erie Flooring management on January 22 Erie Flooring have decommissioned one of the wood burning furnaces and using a natural gas one instead, which should help. A letter to be sent to Mr. Joyce. January 28110...Pg 6 of 6 Councillor Wolf reported that he had attended an Elgin Fire Service committee meeting. A change from analogue to digital communication systems is coming and it will affect all departments. It is being advised to start budgeting for this at local levels. The total cost countywide could be $1.5 to $2 million. SUBJECT: CONFIRMATION BY -LAW RES. NO. 17 Moved by Balint Seconded by Wiehle RESOLVED that the mover be granted leave to introduce a By -Law to confirm the proceedings of the meeting of Council held on January 28 2010 and this shall be the first and second reading and provisional adoption thereof. DISPOSITION: Carried RES. NO. 18 Moved by Wiehle Seconded by Balint RESOLVED that a By -law to confirm the proceedings of the meeting of Council held on January 28 2010 be now read a third time and finally passed, signed, sealed and numbered By -law Number 2010-10 Confirming By -law January 28 2010 DISPOSITION: Carried SUBJECT: ADJOURNMENT RES. NO. 19 Moved by Wolf Seconded by Bodnar RESOLVED that this Regular Meeting of Council shall adjourn at 3:50 p.m. to meet again an February 11, 2010 DISPOSITION: Carried These minutes were adopted on 11 day of February, 2010. MAYOR CLERIC MEMBERS PRESENT: STAFF PRESENT: ALSO IN ATTENDANCE: SUBJECT: REZONING (SLAATS) MINUTES OF THE CORPORATION OF THE MUNICIPALITY OF WEST ELGIN PUBLIC MEETING WEST ELGIN COUNCIL CHAMBERS JANUARY 28, 2010 Mayor Graham Warwick, Deputy Mayor Bernie Wiehle Councillors: Trudy Balint, Mary Bodnar, Jonathan Wolf Joanne Groch Norma Bryant Administrator/Treasurer Clerk Ted Halwa Planning Consultant 167 -170 HARPER STREET 166 QUEEN STREET Also in attendance: Diane John Slaats, Wendie Dupuis, Bob Bodkin The Mayor called the meeting to order at 9:30 a.m. The Clerk informed those present that notice of this meeting had been given under Section 34(12) of the Planning Act by prepaid first class mail to all assessed owners within 150 metres of the subject property and advertised in the Chronicle as well as provincial agencies and ministries as prescribed by regulation. Correspondence was received from the Lower Thames Valley Conservation Authority noting that the subject property is subject to the Authority's Development and Alterations to Shorelines and Watercourses regulation regarding the Wismer Drain. The proposed amendment would change the zoning of lands lying on the south side of Queen Street west of Furnival Road in the Village of Rodney, from the Central Commercial (C1) Zone to the Residential Second Density (R2) Zone to permit their development for residential purposes, namely, the erection of five semi detached dwellings. The subject lands comprise two separate parcels lying south of Queen Street and west of Furnival Road and separated by Harper Street. The northernmost parcel (167 Harper Street and 166 Queen Street) is a `through' lot, having a frontage of 37.2 metres (122 ft) on both Queen Street and Harper Street, a depth of 63 metres (206.5 ft) and an area of 2,341 square metres (0.6 acres). The southernmost parcel (170 Harper Street) has a frontage of 20 metres (66 ft) on Harper Street, a flankage of 35.5 metres (116 feet) on Jane Street and an area of 1,318 square metres (0.3 acres). The lands are devoid of buildings and structures and were, until about 2006, occupied by a machine shop and an egg processing facility (Lashbrook Egg Products) situated on the northernmost parcel and a quonset -style storage building associated with the egg processing facility situated on the southernmost parcel. The owner proposes to construct five, one storey semi- detached dwellings (for a total of 10 dwelling units) on January 28110 ...Pg 2 of 2 the two parcels four of which would occupy the northernmost parcel and one of which would occupy the southernmost parcel. Consideration will be given to applying a 'site- specific' (Le. R2 zoning to permit reductions with respect to matters such as minimum lot area, minimum lot frontage, and front, side and rear setbacks. Application of the holding (H) symbol would prevent premature development of the lands until such time as a site plan agreement is executed between the owner and the Municipality. The subject lands are designated 'Central Business District' in the Village of Rodney Official Plan. The Planner reported that the setbacks from watercourses in our by -law may be excessive and as a result may have to be amended. Soil contamination is also an issue. This property is on the periphery of the downtown; therefore residential development is permitted in the Official Plan. Although R2 zoning is proposed, more information is needed regarding the site layout, including dimensions, before the exact zoning can be determined. Access to the public lane is being proposed; however its width is less than normal. There are drainage issues as well. Mr. Bobkin asked what was the minimum distance of buildings to the side lot line? The Planner reported 1 metre and that the proposal appears to meet this requirement. Mr. Bobkin also noted that rainfall drains into his backyard now. The Mayor noted that drainage would be addressed in the site plan approval. The Planner noted that the setback to the drain is 4 metres in the zoning by -law. This will have to be reviewed with the Conservation Authority and the site plan may have to be revised. The Deputy Mayor asked what size of unit is being proposed? Mr. Slaats replied 800 square feet plus garage. More details are needed regarding the affects of soil contamination on siting of buildings; drain setbacks, building setbacks, dimensions, and back yards for units. More details are required before the zoning by -law can be prepared. SUBJECT: ADJOURNMENT RES. NO. 1 Moved by Balint Seconded by Wiehle RESOLVED that the Public Meeting concerning a proposed Zoning By -law Amendment for land located at 167 -170 Harper Street and 166 Queen Street in the former Village of Rodney (Slaats) be hereby adjourned. DISPOSITION: Carried These minutes were adopted on this 11 day of February, 2010. MAYOR CLERK MEMBERS PRESENT: STAFF PRESENT: ALSO IN ATTENDANCE: MINUTES OF THE CORPORATION OF THE MUNICIPALITY OF WEST ELGIN PUBLIC MEETING WEST ELGIN COUNCIL CHAMBERS JANUARY 28, 2010 Mayor Graham Warwick, Deputy Mayor Bernie Wiehle Councillors: Trudy Balint, Mary Bodnar, Jonathan Wolf Joanne Groch Norma Bryant SUBJECT: REZONING LOT 16, CONCESSION 7 (NEIL) Also in attendance: Ken Neil, Randall Reiss Administrator/Treasurer Clerk Ted Halwa Planning Consultant The Mayor called the meeting to order at 9:30 a.m. The Clerk informed those present that notice of this meeting had been given under Section 34(12) of the Planning Act by prepaid first class mail to all assessed owners within 150 metres of the subject property as well as provincial agencies and ministries as prescribed by regulation. Correspondence was received from the Lower Thames Valley Conservation Authority noting that the subject property is subject to the Authority's Development and Alterations to Shorelines and Watercourses regulation regarding the wetland known as the Elgin Nature Reserve located on and adjacent to the subject property. Correspondence was also received from the Ministry of Transportation inidicating no objections to the proposal; no event signing can be visible to Highway 401. The proposed amendment would permit the staging of an event described as the The West Elgin Dodge Rodeo' on lands situated on the south side of Downie Line west of Graham Road, being part of Lot 16, Concession VII. The event is proposed to take place over a three -day period, being July 23 to July 25 2010. The subject parcel, owned by Kenneth Catherine Neil, comprises an area of 19 hectares (47 acres) and a frontage of 299 metres (980 ft) on Downie Line and lying adjacent to Highway No. 401. The parcel is occupied by a single unit dwelling (being the residence of the owners) and various farm buildings and structures and has been cleared for agricultural purposes with the exception of a woodlot occupying the southerly portion of the farm. No permanent buildings or structures are proposed. The rodeo would be held on the northwesterly portion of the parcel to the west of the existing dwelling and occupy an area of approximately 4 hectares (10 acres). Events include open -air rodeo performances, vendors, beer gardens, a `West Elgin Dodge Rodeo Tour Dance' and a 'Cowboy Breakfast'. January 28110 ...Pg 2 of 2 The lands are zoned Agricultural (Al). Permitted uses include an agricultural use, riding school, forestry use, home occupation, single unit dwelling, bed and breakfast establishment and an accessory use. Commercial uses, unless they otherwise qualify as a 'home occupation' or as a 'bed and breakfast establishment', are not permitted. The proposed temporary use by -law would permit the event to take place only for the above noted dates notwithstanding the Agricultural (A1) zoning of the lands, which would otherwise remain in effect. The subject lands are designated 'Agricultural' in the Township of Aldborough Official Plan. Mr. Neil reported that the event may be three days July 23, 24 25 Mr. Reece asked if there is going to be a beer tent and what about washroom facilities? Will there be port -a- potties at the 401? The Mayor noted that there would be port -a- potties on site, which is meeting their responsibilities. SUBJECT: ADJOURNMENT RES. NO. 1 Moved by Wiehle Seconded by Balint RESOLVED that the Public Meeting concerning a proposed Zoning By -law Amendment for land located at Lot 16, Concession 7 (Neil) be hereby adjourned. DISPOSITION: Carried These minutes were adopted on this 11 day of February, 2010. MAYOR CLERK TRANSMITTAL DATE: February 8, 2010 DISTRIBUTION: Municipality of West Elgin FROM: Spriet Associates Mr. Larry Gigun, P,Eng. and Mr. Art Bos P. Eng REGARDING: Port Glasgow Trailer Park Cost Comparison of Alternative Treatment Systems At your request, a cost comparison of alternative treatment technologies has been undertaken including the estimated 25 -year operating cost. The capacity of new treatment plants required at the park will be approximately 75,000 L /day. The compared costs are for the treatment plant only excluding installation, beds, sewers and pump stations that will be required for all systems. We have relied on available pricing information adjusted for 2010 that may vary from tendered prices. The cost differences between the preferred alternatives are within the level of confidence of the price estimates. We have consulted directly with representatives of Ecoflo and Waterloo Biofilter (WBF) for cost information that has been incorporated. All systems will require the same type and size of leaching beds as determined by the native soils and groundwater characteristics at the site. A summary of findings to date is also included in this report. PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 1 P)- Summary of Findings and Review of Alternative Treatment Technologies Port Glasgow Trailer Park PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 2 1. Introduction This report was prepared only to assist the municipality in selecting the type of treatment unit(s) to be used for replacement sewage systems in the park. There are four existing sewage systems in the park: a.) Northwest System constructed as a conventional septic tank/raised bed system approximately 15 years ago to serve 30 sites including a public washroom facility. This system is not believed to be failing and is not currently being replaced. b.) Central West System constructed as a conventional trench system although few details of construction are available. All sewage flows by gravity to an undersized septic tank from which it flows to a pump station that doses a failing bed of unknown size. This system currently services 41 sites and a dumping station. The total estimated sewage load of this system is 20425 Llday. c.) Main Central System believed to be constructed as a conventional trench system although few details are available regarding the number and lengths of distribution pipes. The sewage system may in fact be connected to the Central West System and is failing. All sewage flows by gravity to a single deep undersized 20,000 L tank located at the extreme northeasterly side of the park between a ravine and a washroom building. From here it flows to a deep pump station near the ravine and is pumped more than 200m to the bed. This system currently services most of the park with an estimated 99 serviced sites and 10 unserviced sites for a current total sewage load estimate of 44825 Llday. d.) South Snack Bar and Washroom System is constructed as a small conventional trench system with a small 4500 L septic tank. Since the washroom serves 40 unserviced sites in the vicinity, the total estimated sewage load of this system is 11000 Llday. Although this system does not indicate signs of failure, the tank is undersized and it is intended to connect these facilities to a centralized system. PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 3 2. Scope of Work Spriet Associates received a request from the municipality to examine the requirements for replacement of all systems except the Northwest System that was constructed somel5 years ago. The work plan included site review, background review, preparation of a base site plan, topographical survey of the park and soil testing in the available bed areas to assist in developing a remedial plan. In addition, some sewers were located excavated to determine elevations of existing infrastructure. A meeting was arranged with the Ministry of the Environment to confirm the required levels of approval and applications. Several subsequent communications were held with the Ministry. In the end, the system was deemed a "replacement system" negating the need for a Class EA. However some consideration of groundwater flows was requested in the application to be made for a Certificate of Approval. The purpose of this report is to summarize the findings to date and to summarize the proposed solution. More specifically, this report is to assist the municipality in selecting the treatment technology to be used and approximate costs of the project. 3. Site Soils and Hydrogeology At the beginning of November, five boreholes were formed by Atkinson Davies Inc. in the available areas for sewage systems in the park. Groundwater elevations and background nitrate concentrations were measured, soil profiles were logged and hydraulic conductivity was tested. A report was prepared with considerations for sewage systems at the site. In summary, total Nitrogen (nitrate+nitrate) concentrations in the central septic system and snack bar areas were elevated and above MOE Guidelines for drinking water. However the concentration of nitrate /nitrates near the ravine (in the direction of groundwater flow) were low. A recommended design percolation time of the native soil is 20 minutes /cm for the native silty sand above the measured groundwater level. The silty sand is underlain by hard grey silty clay at depths ranging from 0.7 to 1.8m in depth. Treatment beds must therefore be partly raised at this site to maintain separation from the documented seasonal high water table and the silty grey clay. 4. Proposed New Sewage System Layout It is proposed to construct three (3) new sewage systems (Service Areas 1 through 3) to handle all park wastewater except for that area served by the northwest system. The PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 4 more recent Northwest system was constructed within the last 15 years and was therefore not assessed and there are not currently plans to make modifications. Due to the large required size of conventional trench systems and due to the high water table and silty soils at the site, treatment beds were designed based on secondary treatment that provides cleaner effluent and hence, a much smaller bed footprint. The proposed new service areas are outlined on the attached drawing and are described as follows together with the required treatment bed sizes and the required tank capacities for those treatment systems that will require septic tanks: 4.1 New Service Area 1 This area will be comprised of the sites served by the current Central West System and 24 serviced sites that_are currently serviced by the main central system. SERVICE AREA 1 DESIGN LOAD AREA 1A 38 SERVICED SITES 425 L.DAY AREA 1 B: 24 SERVICED SITES 425 L.DAY AREA 1C 3 SERVICED SITES 425 L.DAY DUMPING STATION 10 /DAY 300 L TOTAL LOAD 16150 L.DAY 10200 LIDAY 1275 LIDAY 3000 L/DAY 30625 LIDAY AREA 1 BED PROPOSED BED CAPACITY 30625 LIDAY MIN. IMPORTED STONE AREA Q150 612 rn2 MIN. IMPORTED SAND AREA Q x T 1850 720 m2 (Where native T 20 min /cm) MIN. SAND AREA FOR UNIT AREA LOADING OF 40 L1m 0140 766 m2 SAND DEPTH 60cm (ABOVE HWT) STONE DEPTH 30 cm TANK CAPACITY /SUBAREA (If treatment unit requires a tank) AREA 1A 29500 L (Existing Central West are) AREA 1B: 22700 L (Rerouted sewer from Main Central System rerouted at Lot 55 by gravity flow) AREA 1C 6800 L (EXISTING) (New sewer required to replace "Big 0" corrugated pipe under road) PUMP STATION(S) THE PUMP STATION CAPACITY WILL BE 0.5 TO 1.0 TIMES THE DAILY DESIGN LOAD DEPENDING ON THE TYPE OF SYSTEM USED 15,300 L to 30625 L WITH DUAL ALTERNATING PUMPS. SOME TREATMENT UNITS WILL REQUIRE A SECOND PUMP STATION. In order to justify the proposed reduced bed size relative to a conventional raised bed (and based on a unit area loading of 40 L /m /day), it is necessary to include a treatment system that meets the secondary effluent quality guidelines of the Ontario Building Code. These options are the subject of this report and will be discussed in Section 5 below. PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 5 4.2 New Service Area 2 This area will be comprised of the sites served by the current Main Central System except that 24 serviced sites will be redirected to Service Area 1 and 15 serviced sites will directed to Service Area 3. Sites were removed from the system to reduce the required size of the septic and/or treatment tanks due to the limited available space at the bottom end of the central system sewers for such tanks between the new washroom building and the ravine. SERVICE AREA 2 DESIGN LOAD AREA 2 60 SERVICED SITES 425 L.DAY 25500 LIDAY AREA 2: WASHROOM —10 UNSERVICED SITES 275 L.DAY 2750 L/DAY TOTAL LOAD 28250 LIDAY AREA 2 BED PROPOSED BED CAPACITY =28250 L/DAY MIN. STONE AREA Q/50 565 m2 MIN. SAND AREA Q x T 1850 665m2 (Where native T 20 min /cm) MIN. SAND AREA FOR UNIT AREA LOADING OF 40 LIm21DAY Q/ 40 706 m2 SAND DEPTH 60cm (ABOVE HWT) STONE DEPTH 30 cm TANK CAPACITY /SUBAREA (If treatment unit requires tanks) AREA 2: TWO TANKS EACH 29500 L WITH MANHOLE JUNCTION TO SPLIT FLOW PUMP STATION(S) THE PUMP STATION CAPACITY WILL BE 0.5 TO 1.0 TIMES THE DAILY DESIGN LOAD DEPENDING ON THE TYPE OF SYSTEM USED 14000 L to 28250 L WITH DUAL ALTERNATING PUMPS. SOME TREATMENT UNITS WILL REQUIRE A SECOND PUMP STATION. In order to justify the proposed reduced bed size relative to a conventional raised bed (and based on a unit area loading of 40 L /m /day), it is necessary to include a treatment system that meets the secondary effluent quality guidelines of the Ontario Building Code. These options are the subject of this report and will be discussed in Section 5 below. PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 6 4.3 New Service Area 3 This area will be comprised of 15 sites served by the current Main Central System as well as 40 unserviced sites facilitated by the washroom. SERVICE AREA 3 DESIGN LOAD AREA 3A 15 SERVICED SITES 425 L.DAY AREA 3B WASHROOM 40 UNSERV!CED SITES 275 L.DAY TOTAL LOAD 6375 L/DAY 11000L /DAY 17375 L /DAY AREA 3 BED PROPOSED BED CAPACITY =17375 L/DAY MIN. STONE AREA Q /50 350m2 MIN. SAND AREA Q x T 850 410m2 (Where native T 20 min /cm) MIN. SAND AREA FOR UNIT AREA LOADING OF 40 L /m2 /DAY Q/ 40 435 m2 SAND DEPTH 60cm (ABOVE HWT) STONE DEPTH 30 cm TANK CAPACITY /BED AREA 3A: ONE TANK: 13600 L (Serviced Sites) AREA 3B: ONE TANK: 22700 L (Washroom Tank) PUMP STATION(S) THE PUMP STATION CAPACITY WILL BE 0.5 TO 1.0 TIMES THE DAILY DESIGN LOAD DEPENDING ON THE TYPE OF SYSTEM USED 8700 L to 19375 L WITH DUAL ALTERNATING PUMPS. SOME TREATMENT UNITS WILL REQUIRE A SECOND PUMP STATION. In order to justify the proposed reduced bed size relative to a conventional raised bed (and based on a unit area loading of 40 L /m /day), it is necessary to include a treatment system that meets the secondary effluent quality guidelines of the Ontario Building Code. These options are the subject of this report and will be discussed in Section 5 below. PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 7 5. ALTERNATIVE TREATMENT PLANTS COSTS A cost comparison of alternative treatment technologies has been undertaken including an estimated 25 -year operating cost. The capacity of new treatment plants required at the park will be approximately 75,000 L /day. The compared costs are for the treatment capacity per 20,000 L /day and are 25 -year costs of the treatment plant only excluding installation, beds, sewers and pump stations that will be required for all systems. Following are descriptions of several modular "off-the-shelf' treatment plants that are in common use throughout Ontario. At the end of this analysis, the cost estimate for preferred systems will be prorated to the sewage Toads for the park systems. It is noted that since the proposed system at this site is considered a replacement system by MOE, there are no specific requirements to attain certain effluent standards other than the minimum standards for certification of these systems under the Ontario Building Code. Since all of these systems meet secondary effluent standards under the OBC, effluent quality was not specifically compared between units. Many of these units can be installed in various configurations. 5.1 BIONEST Model BN Manufacturer's Description: The BIONESTTM system is a submerged fixed film bioreactor using a non biodegradable media. The wastewater treatment is accomplished through two identical tanks installed side by side. The primary treatment uses a conventional two- compartment septic tank equipped with an effluent filter. The advanced secondary treatment is performed in the BIONESTTM bioreactor, a tank identical in size and form to the septic tank. The BIONESTTM media is installed inside the two compartments of the tank, which are both, equipped with sludge removal devices. Continuous aeration of the first compartment of the bioreactor is provided with a linear air pump and with bubble air diffusers. A recirculation pump is installed in the last compartment of the tank and returns part of the effluent of the bioreactor to the first compartment of the septic tank. Maximum Treatment Capacity: 10,000 L/day Treatment Method: Aeration air pump and synthetic media Number of Units Required /20,000 L: 2 Budget Cost/Unit: $21,000 x 2 $42,000 Other: Pretreatment tank 40,000 L ($12,000 additional) PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 8 Total Budget Capital Cost: $54,000. (excluding installation, pump station, sewers, bed &maintenance) 5.2 Ecoflo ST- 650 (Premiertech Environmental) Manufacturer's Description: The Ecoflo Biofilter is made of a durable fiberglass shell enclosing a natural filtering media (peat) specially treated to purify the wastewater coming from a septic tank before it is discharged to the environment. Maximum Treatment Capacity /Unit: 2200 Llday (Model ST -650) Treatment Method: Aerobic Peat Moss media Number of Units Required /20,000 L: 10 Budget Cost/Unit: $4200 x 10 42000. Other: Pretreatment tank 40,000 L and Effluent Filter ($12,500 additional) Total Budget Capital Cost: $54,500. (excluding installation, pump station, sewers, bed &maintenance) Note that this treatment plant is one that does not require distribution pipes as the treatment units are open- bottomed and are located over the distribution beds. However, it is the only system that requires replacement of the growth media at least every 8 years. Ecolfo now also makes a unit with capacity of 2850 Llday. 5.3 MicroFAST Model 3.0 (Pinnacle Environmental) Manufacturer's Description: The MicroFAST® (Fixed Activated Sludge Treatment) process employs a unique hybrid combination of attached and suspended growth in an aerobic, packed bed bioreactor. This proven IFAS (Integrated Fixed -Film Activated Sludge) combination includes the stability of fully- submerged, fixed -film media and the effectiveness of activated sludge treatment, making the innovative, patented FAST system technologically advanced and extraordinarily reliable. Natural separation and settling processes occur prior to entering the MicroFAST treatment module. A remote mounted, above- ground blower, the system's only moving part, introduces air (oxygen) into the treatment module to facilitate a robust circulation of wastewater through the media's channeled flow path. FAST's fixed film media provides a high surface -to- volume ratio to maintain exceptional microbial growth during low, average and peak usage. Bacteria become "fixed" or attached to the stationary media where the abundant, diverse and self regulating population of microbes is consistently maintained in the aeration zone to metabolize the incoming waste. PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 9 Maximum Treatment Capacity: 11,400 Llday Treatment Method: Aeration compressor and synthetic media Number of Units Required /20,000 L: 2 Budget Cost/Unit: $22,000 x 2 $44,000. Other: Pretreatment tank(s) are part of the unit Total Budget Capital Cost: $44,000. (excluding installation, pump station, sewers, bed &maintenance) 5.4 NORWECO Sinqulair Model 960 —1500 Manufacturer's Description: Employing the extended aeration process, the Singulair plant provides flow equalization, pretreatment, aeration, clarification, tertiary filtration and optional chemical addition within a single precast concrete tank. The only mechanical component is the fractional horsepower aerator. The patented Bio- Kinetic device is an integral component and assures that all flow through the Singulair system is equalized and completely treated. Maximum Treatment Capacity /Unit: 5700 L/day Treatment Method: Aeration (agitators) and "Bio-kinetic" Filter and screen Number of Units Required /20,000 L: 4 Budget Cost/Unit: $13,000 x 4 $52,000. Other: Pretreatment tank(s) are part of the unit Total Budget Capital Cost: $52,000. (excluding installation, pump station, sewers, bed &maintenance) 5.5 Waterloo Biofilter Model (Configuration 2) Manufacturer's Description: The Waterloo Biofilter is a patented trickle -filter type treatment system which uses an innovative filter medium to treat residential and industrial wastewater. Wastewater is sprayed intermittently onto the medium and is allowed to drain through by gravity. Organic biomass grows quickly within the medium after start -up, oxidizing organic material and nitrifying ammonia in the wastewater as it passes over the biomass layer. The Biofilter media can be installed PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 10 in numerous configurations. Configuration 2 is the use of open bottomed units that dissipate into a stone layer that in tum is distributed over a sand layer. Maximum Treatment Capacity /Unit: Variable (10,000 L typical) Treatment Method: Natural Air Diffusion with foam chip media Number of Units Required /20,000 L: Depends on Tank Configuration Budget Cost/Unit: $34,500 Other: Pretreatment tank 40,000 L and Filters ($13,000 additional) Total Budget Capital Cost: $47,500. (excluding installation, pump station, sewers, bed &maintenance) WBF also priced their above- ground open bottomed shipping container system, although this was much more costly at 78,000 total capital cost. 5.6 Whitewater Model DF 150 FF Manufacturer's Description: Aerobic systems of this type work by using the bacteria that nature has provided by pumping air into the system, the bacteria grow and thrive in much larger amounts than would occur naturally. The over- population of bacteria speeds up the process of breaking down domestic wastewater this makes it safe to release into the environment. This entire process takes place within the walls of the specially designed, self contained Whitewater® Treatment System. The Whitewater® System is made up of an outer mixing chamber and center settling chamber. Raw unsettled domestic wastewater enters directly into the mixing chamber. Mixing is accomplished by air passing from the air pump to the air drop -lines located around the outer wall of the mixing chamber. The design is such that solids remain in suspension with a general flow pattern up the outer plant wall, then down the outside of the settling chamber when the air pump is on. This flow pattern allows a quiet condition in the settling chamber. The mixed liquid enters the hopper shaped settling chamber at the bottom and travels upward toward the discharge pipe. The quiet condition allows solids to settle down and re -enter the mixing chamber. Maximum Treatment Capacity /Unit: 5670 L/day Treatment Method: Air Diffusion with Air Pump /compressor Number of Units Required /20,000 L: 4 Budget Cost/Unit: $10,000. X 4 $40,000. PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 11 Other: Pretreatment tank: 40,000 L filter ($12,500 additional) Total Budget Capital Cost: $52,500. (excluding installation, pump station, sewers, bed &maintenance) 5.7 Treatment Unit Cost Comparison A full -cost summary table was prepared based on retail price lists for the above systems to treat 20,000 Llday. Where applicable, the cost estimates include electricity and maintenance costs based on a simple 25 -year operation excluding discount rates. This chart is for comparisons only and may not reflect final tendered prices. Assumptions and other comments are noted on the chart. This chart is located in Appendix A. 5.8 Analysis and Recommendation of Preferred Options Based on chart comparison, most of the systems have relatively comparable 25 -year total costs. The cost range is from $76,500 to $104,000 per 20,000 L of treatment. The lowest cost units are the Microfast and the above ground concrete Waterloo Biofilter systems with a 25 -year cost in the order of $77,000. Ecoflo systems have the next lowest cost although somewhat higher at 92,000. There are two systems that can be mounted on the beds without the need for distribution pipes. These are the Waterloo Biofilter (Manufacturer's Configuration #2) and the Ecoflo system. Both of these systems can be mounted with open bottoms that sit over stone beds that are situated on sand beds. Although this feature eliminates the need for installation of distribution pipes in the stone the savings are offset by increased costs of higher backfilling. One other large advantage of placing the treatment units on the beds is the elimination of added treatment tanks at the collection point. This may be important in Service Area 2 where there is limited available space for the tanks between the new washroom building and the ravine. MicroFAST The MicroFAST system is a good treatment system that has superior treatment capabilities at sensitive sites. However, this site does not have stringent treatment requirements as a replacement system. Comparing the three lowest cost systems, the Microfast system is the only one that has mechanical blowers that can wear and the system requires significant electrical services that may involve added work at this site. PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 12 Ecoflo It is necessary to replace the peat media in the Ecoflo units every eight years, which is reflected in the higher cost of these units. These units are pumped in a similar manner, as septic tanks and the supplier will include a contract for this service at start -up. Unlike the Microfast units, one negative factor of a non mechanical, fixed media system, such as Ecoflo, is that the dosing rate of these systems is limited to a maximum volume that will require load balancing and timed dosing of the beds. Waterloo Biofilter In the case of the Waterloo Biofilter, the foam media is now guaranteed for 20 years and may last longer before replacement if not abused with detrimental inputs. Unlike the Microfast units, one negative factor of a non mechanical, fixed -media system, such as the Waterloo Biofilter (WBF) is that the dosing rate of these systems is limited to a maximum volume that will require load balancing and timed dosing of the beds. The dosing volume of the WBF is somewhat higher than the Ecoflo system and the 25 -year cost estimate of the WBF is lower than that of the Ecoflo system. However, due to the small footprint of the above ground concrete units, uniform distribution of effluent over the stone surface will be more difficult. Also, there are concerns with potential for clogged nozzles in the pressured spray system. For maintenance purposes, it is preferable to use the same treatment system for each of three service areas. if space constraints can be overcome in Service Area 2 near the ravine, the Microfast system is the lowest cost system to use at all three service areas. However, if the space constraints cannot be overcome, it is recommended that a Waterloo Biofilter system be installed over the bed for service area 2 and that Microfast treatment units be employed at service areas 1 and 3. PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 13 6.0 Preliminary Capital Budget Estimate for Installation 6.1 Service Area 1 (30625 Llday) 2 Microfast Treatment Unit Model 4.5 $40,000 each $80,000. 2 Effluent Screens 500 each $1000. Treatment Unit Installation 40% of materials $32,000. Bed Installation (including stone, sand distribution pipes) $150,000. Installed Pump Station $10,000. Permits Engineering Contingency 15% $40,000. TOTAL Estimated Cost $313,000. 6.2 Service Area 2 (28250 Llday) 3 Bulk- filled WBF tanks spray manifolds $20,000 each $60,000. 2- 29000 L septic tanks with effluent screens $16,000. Treatment Units Installation 40% of materials $30,000. Bed Installation (including stone, sand distribution pipes) $141,000. Installed Pump Station $15,000. Permits Engineering Contingency 15% $39,000. TOTAL Estimated Cost $301,000. 6.3 Service Area 3 (17375 Llday) 1 Microfast Treatment Unit Model 4.5 $40,000 each $40,000. 1 Effluent Screen 500 each $500. Treatment Units Installation 40% of materials $16,000. PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 14 Bed Installation (including stone, sand distribution pipes) $87,000. Installed Pump Stations (2 small demand stn incl) $10,000. Permits Engineering Contingency 15% $39,000. TOTAL Estimated Cost $192,500. 6.3 Total Estimated Capital Cost Service Area 1 313,000. Service Area 2 301,000. Service Area 3 192,500. TOTAL ESTIMATED CAPITAL COST $806,500. PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 15 APPENDICES A COST COMPARISON TABLE B PARK SEWAGE SYSTEM LAYOUT DRAWING PORT GLASGOW TRAILER PARK SEWAGE SYSTEM PAGE 16 V oaf 1 B 1111 TILA a e$ 2. i RI gg i 0. d R“ m .40 S F. 5 a m 20 mq 11 o o N g N O w Idll Q e v m m n g n t d z 5 8,43 a f 42 §i o z m n OM O O b 0 p 8 `3 V 2 N 4 4V) 0 o 0 0 0 U o a o W N N N R 00 m n o c O o n o °o 1 H 4 N v m y o o p o ig E. O 88 O b .0 a. 8.t a V Y Y N H ,fN( N .511 3 G z G 4 C 14 CC D I@ ai 1- ill K 2 ,y c v c m c a M1 S j O. 6 5 y 6 j j QQ- Iq NW N 41 NW NE p? N N P Z z O U p o p b N O O 1l1 v N V 8 m r r r r r r T O p O O O Q u v C C N V O� Cp1 P oO F .5 a 8 [V vi N N 8 Y] 7 j o CC WW w Z L Ti o C.� C W L h pill C 3 J84 m 1-- �U w n� r 'ndU n U 'a c7,0 0 85 w Cl. 000 w 0 ffi°w o S r cu m m P o 8 o 3 V I 19 .2 ✓I 11 m c ry n CO w i 2 3 3 3 3 zz °O JANUARY 2010 ROADS REPORT 1. Brushing and tree trimming is being carried out on various roads. One crew is working on Municipal roads in preparation for this years regravelling program. Overhanging branches that would be struck by the dump trucks as they are spreading gravel are removed. As well, the brush along side the roads that will require ditching is being cut. 2. Another crew is working along side County bridges, removing trees and brush, which shades the structure and keeps it from drying allowing rust and rot to occur. 3. A few snowfalls occurred and gave the brushing crews a bit of a change in their work for the day. 4. Our January thaw gave us a bit of time to go and cold patch a few potholes on various paved roads. More of this will be happening with the next warm spell! Paul Van Vaerenbergh C.R.S.I. Roads Superintendent West Elgin Recreation Report For West Elgin Council February 112010 The ice season is slowly corning to a dose. Minor Hockey teams are involved in both OMHA Playoffs as well as league playoffs. The West Elgin Skating Club is hosting their annual Pop Concert on Monday February 22 at 6:15 pm, and the end of the Season Carnival on Saturday March 27 with shows at 1 and 7 pm. As of Monday February 8 2010 Spriet has not confirmed with me when the tenders will be available for the Arena Renovation. A call for proposals will be advertised in the chronicle for the next three weeks for the Operation of The Concession at the Arena. The current agreement terminates in April of 2010. The new agreement contains some new clauses, eliminated some of the old ones, and will be for a period of three years. Upon the termination of the third year of the agreement a call for proposals will then be re- issued. Preparations are still on going to complete the Trail in Miller Park. The trail is substantially installed however the trees as well as the amenities have still to be installed. The advertisement for the summer staff will be appearing in the near future in the Chronicle. The possible college teacher strike could have implications for our summer staff. We are currently constructing a trailer that will be used solely for the purpose of watering the flowers for the horticultural societies. Budget preparations are underway for the Parks as well as the arena. As far as Capital expenses for the Parks outside of the grant, equipment wise, we will only be requesting the watering reel from 2009, and a lawnmower grass catcher broom unit at an approximate cost of 20,000.00, a unit that will have four season capabilities. West Elgin Recreation Report for West Elgin Council Date: February 11 2010 Subject: Water Reel Irrigation Discussion: Part of the 2009 Capital Budget included the installation of a water line to feed the Water Reel that is intended to irrigate the athletic fields in Miller Park. In 2009 the two inch water line was installed, at an approximate cost of 3,000.00. The final portion of this project is to purchase the water reel. To this end two estimates were procured. Both companies were given the same information regarding the two inch feeder line and the fact that we wanted to irrigate a soccer field in a single pass. Both units quoted will function as intended. 1) Cadman Water Reel, Mini Traveller: 7480.00, Price is excusive of freight and applicable taxes. Cadman Power equipment 2) Kifco Water Reel: 10,827.75 Price is exclusive of applicable taxes. Vanden Bussche Irrigation Recommendation: As this was a 2009 Budget Item, project, that was partially completed I would like to recommend to Council that they authorize the purchase of the Cadman Water Reel at a cost of 7480.00, plus freight and applicable taxes. My concern in waiting is that we may have to wait for a unit to be produced and that would delay using the unit this summer. Jeff Slater West Elgin Recreation Superintendent. Feb. 11 2010. Council Feb 1 2010 C Z) Cadn'uan sz.i... POWER EQUIPMENT Date: JAN 25/10 GERRY Date: APR 15/10 C.O.D CADMAN PICKUP OTHER 4 AGRLCULTURAL MAC itNORY IRRIGATION EQSJI?MENT 38 Main Street, Box 100 Courtland, Ontario, Canada NOJ 1E0 1 Phone: 1- 865.422 -3626 Fax: (519) 688 -2100 e -mall: inquiries(ccadmanpower.com Customer: THE MUNICPALITY OF WEST ELGIN Quote Contact: JEFF SLATER Salesperson: Address; 22413 HOSKINS LINE BOX 490 Shipment RODNEY, ONTARIO NOL 2C0 Terms: Phone: 519 -768 -1380 Deliver: Fax: 519 -768 -0577 Cell: 519 -857 -6132 QTY PART DESCRIPTION UNIT PRICE AMOUNT 1 TR ASY -1400 1.4" X350' Cadman mini hard hose traveller 4,850-00 4,850.00 1 SP- KOM -TMKIT Komet Twin Max Gun 695.00 695.00 SER 1 TR OPT 0PC55 5.5 HP. Cornell Booster Pum• 1,935.00 1,935.00 THIS UNIT WILL DO THE JOB YOU NEED 360 FO HARD HOSE AND WILL DO 205 FOOT WIDTH MEI THANKS 1.1111.1111111111 11111111111.11111=1 GERRY SlNNESAEL ME E_ •IIIIIIIIIII1 i i' is is All prices PURCHASER'S MIIIIIIIIIIIIIIIMI a propose on y. rces are FOB Courtland, Ontario, SIGNATURE r r..$ 1C Irae11' ,480.00 are go r i ays. Canada. G.S.T. 622.40 389.00 SALESPERSONS SIGNATURE 1 J t3ALANCE 8,791.40 Proposal Worksheet a:144-0650r lifittAit Marsh VandenBussche 01/26/10 *40E204 vERIG VANJOBJSSCif Celli VBI Truck COD a:144-0650r lifittAit 000000 01/26/10 356-00 WESI E1J tbEl 1 VANDEN BUSSCHE PARIOATIOlt---- I Mark to Sax 304,1110waye INLI.C+1 coda WM1 Delhi, ON (519) 582-2380 Fax: (519) 582-1514 Milton, ON (905) 875-4545 Fax: (905) 878-9501 Kling Cfly, ON (905) 8334545 fax: (905) 833.4445 Scarborough, ON (416) 289.3635 Fax: (416) 289-6678 www.vandenbussche.com LL 10: CASH DVB-13% GST R105486096 COST. a: SHIP TO: 901 WEST ELGIN RECREATION DEPART 22413 HOSKINS LINE,PO BOX 490, 519 768 1380/FX#519 768 0577 ROONEY. ON NOL 2C0. QUOTE NP 11UT(0N LastFt9e:: 1 PlOOSTER PUMP 1. NOZZLE 1 QM THE DELIVEW ESUPPLIED 25 0 PSI 2" 4 0 0 10750.00 930.00 17.71 15.30209X 2.62 10.30534t 1.29 400 22.48062X 5WW: Qty Ship0.e.d....: 32 Total G.S.T. /H .S.T.........::::::::...-..:... P.S.T. Invoice Total No. of Permits Issued for Month of July 2009 2008 SFD Units New /Additions 3 3 Demolitions 2 1 Storage Buildings New /Additions Storage Buildings New /Additions 1 2 Demolitions Garages/ Car Ports New Garages/ Car Ports New 1 Demolitions Farm Buildings New /Additions Farm Buildings New /Additions 1 6 Demolitions 1 Other New Other New 2 1 Demolitions Septic Permits 8 Septic Permits 3 3 Estimated Value Permit Revenue for for Year Year Estimated Value Permit Revenue for for Month of July Month of July $103,200.00 $749,000.00 2,743.33 6,042.65 No. of Permits Issued for year to date SFD Units New /Additions 18 11 Demolitions 3 1 Storage Buildings New /Additions 3 3 Demolitions Garages/ Car Ports New 1 Demolitions Farm Buildings New /Additions 6 16 Demolitions i 3 Other New 5 11 Demolitions Septic Permits 8 13 Estimated Value Permit Revenue for for Year Year $1,637,790.00 $3,338,944.00 15,1 50.85 27,354.17 TO: FROM: DATE: RE: MUNICIPALITY OF WEST ELGIN MONTHLY REPORT COUNCIL OF THE MUNICIPALITY OF WEST ELGIN LORNE McLEOD, CHIEF BUILDING OFFICIAL February 11, 2010 BUILDING REPORT FOR MONTH OF July, 2009 O:Ireports\bldg.rcport. monthiy..doc PNo. of Permits Issued for Month of August 2009 2008 SFD Units New /Additions 15 4 Demolitions 1 Storage Buildings Storage Buildings New /Additions 3 Demolitions Demolitions Garages/ Car Ports Garages/ Car Ports New 2 2 Demolitions Farm Buildings Farm Buildings New /Additions 5 3 Demolitions 11 Other Other New Demolitions Demolitions Septic Permits 8 Septic Permits Estimated Value for Year Permit Revenue for Year $1,751,790.00 Estimated Value for Month of August Permit Revenue for Month of August $114,000.00 $219,250.00 1,640.48 1,663.53 No. of Permits Issued for year to date SFD Units New /Additions 18 15 Demolitions 3 1 Storage Buildings New /Additions 3 3 Demolitions Garages/ Car Ports New 1 2 Demolitions Farm Buildings New /Additions 11 19 Demolitions 1 11 Other New 5 Demolitions Septic Permits 8 13 Estimated Value for Year Permit Revenue for Year $1,751,790.00 $3,558,194.00 16,791.33 29,017.73 1 5 TO: FROM: DATE: RE: MUNICIPALITY OF WEST ELGIN MONTHLY REPORT COUNCIL OF THE MUNICIPALITY OF WEST ELGIN LORNE McLEOD, CHIEF BUILDING OFFICIAL February 11, 2010 BUILDING REPORT FOR MONTH OF August, 2009 Oareports \bldg.report.monthly..doc No. of Permits Issued for Month of September 2009 5 2008 2 SFD Units New /Additions Demolitions 3 2 Storage Buildings New /Additions 1 3 Demolitions Garages/ Car Ports New 1 2 Demolitions Farm Buildings New /Additions 1 1 Demolitions 1 Other New 2 11 Demolitions Septic Permits 1 4 Estimated Value for Month of September Permit Revenue for Month of September $119,699.00 $203,000.00 1,920.79 2,772.79 No. of Permits Issued for year to date SFD Units New /Additions 23 17 Demolitions 3 3 Storage Buildings New /Additions 4 3 Demolitions Garages/ Car Ports New 1 2 Demolitions Farm Buildings New /Additions 12 20 Demolitions 1 Other New 7 11 Demolitions Septic Permits 9 17 Estimated Value Permit Revenue for for Year Year $1,871,489.00 $3,761,194.00 18,712.12 31 ,790.52 TO: FROM: DATE: RE: MUNICIPALITY OF WEST ELGIN MONTHLY REPORT COUNCIL OF THE MUNICIPALITY OF WEST ELGIN LORNE McLEOD, CHIEF BUILDING OFFICIAL February 11, 2010 BUILDING REPORT FOR MONTH OF September, 2009 O:\reports\bldg.report. month ly..doc No. of Permits Issued for Month of October 2009 2008 SFD Units New /Additions 4 7 Demolitions 2 Storage Buildings New /Additions Storage Buildings New /Additions 1 Demolitions Garages/ Car Ports New Garagesl Car Ports New Demolitions Demolitions Farm Buildings New /Additions Farm Buildings New /Additions 1 1 Demolitions Other New Other New 1 Demolitions 1 Demolitions 1 Septic Permits 9 Septic Permits 3 $1,975,689.00 $4,234,394.00 $19,933.08 $36,077.36 Estimated Value for Month of October Permit Revenue for Month of October $1,289.46 $473,200.00 $108,200.00 $4,286.84 No. of Permits Issued for year to date SFD Units New /Additions 27 24 Demolitions 5 3 Storage Buildings New /Additions 5 3 Demolitions Garages/ Car Ports New 1 2 Demolitions Farm Buildings New /Additions 13 20 Demolitions 1 Other New 8 11 Demolitions 1 Septic Permits 9 20 Estimated Value for Year Permit Revenue for Year $1,975,689.00 $4,234,394.00 $19,933.08 $36,077.36 C.-4d TO: FROM: DATE: RE: MUNICIPALITY OF WEST ELGIN MONTHLY REPORT COUNCIL OF THE MUNICIPALITY OF WEST ELGIN LORNE McLEOD, CHIEF BUILDING OFFICIAL February 11, 2010 BUILDING REPORT FOR MONTH OF October, 2009 O:\reports\b ldg.report. mon th ly..doc No. of Permits Issued for Month of November 2009 2008 SFD Units New /Additions 2 1 Demolitions Storage Buildings New /Additions Storage Buildings New /Additions 2 1 Demolitions Garages/ Car Ports New Garages/ Car Ports New Demolitions I Demolitions Farm Buildings New /Additions Farm Buildings New /Additions 2 1 Demolitions Other New Other New 1 Demolitions 1 Demolitions Septic Permits 11 Septic Permits 2 Estimated Value for Year Permit Revenue for Year $2,111,189.00 Estimated Value for Month of November Permit Revenue for Month of November $135,500.00 $96,500.00 2,140.15 $781.94 No. of Permits Issued for year to date SFD Units New /Additions 29 25 Demolitions 5 3 Storage Buildings New /Additions 7 4 Demolitions Garages/ Car Ports New 1 3 Demolitions Farm Buildings New /Additions 15 21 Demolitions 1 Other New 9 11 Demolitions 1 Septic Permits 11 20 Estimated Value for Year Permit Revenue for Year $2,111,189.00 $4,330,894.00 $22,073.83 $36,859.30 TO: FROM: DATE: RE: MUNICIPALITY OF WEST ELGIN MONTHLY REPORT COUNCIL OF THE MUNICIPALITY OF WEST ELGIN LORNE McLEOD, CHIEF BUILDING OFFICIAL February 11, 2010 BUILDING REPORT FOR MONTH OF November, 2009 O:\reports\b Idg. report.monthly..doc No. of Permits Issued for Month of December 2009 2008 SFD Units New /Additions 2 1 Demolitions 1 Storage Buildings New /Additions Storage Buildings New /Additions Demolitions Demolitions Garages/ Car Ports New Garages/ Car Ports New Demolitions Demolitions Farm 1uildings New /Additions Farm Buildings New /Additions Demolitions 1 Demolitions Other New Other New 1 1 Demolitions Septic Permits 12 Septic Permits 1 Estimated Value for Year Permit Revenue for Year $2,376,189.00 Estimated Value for Month of December Permit Revenue for Month of December $265,000.00 $98,000.00 1,485.66 $225.00 No. of Permits Issued for year to date SFD Units New /Additions 31 26 Demolitions 6 3 Storage Buildings New /Additions 7 4 Demolitions Garages/ Car Ports New 1 3 Demolitions Farm 1uildings New /Additions 15 21 Demolitions 1 Other New 9 12 Demolitions 1 Septic Permits 12 20 Estimated Value for Year Permit Revenue for Year $2,376,189.00 $4,428,894.00 $23,559.49 $37,084.30 TO: FROM: DATE: RE: MUNICIPALITY OF WEST ELGIN MONTHLY REPORT COUNCIL OF THE MUNICIPALITY OF WEST ELGIN LORNE McLEOD, CHIEF BUILDING OFFICIAL February 11,2010 BUILDING REPORT FOR MONTH OF December, 2009 O :Ire p orts\b I dg. report. mont h i y.. doc YEAR PERMITS HOUSES SEPTIC VALUE CONSTRUCTION 2000 88 16 3,903,650.00 2001 92 13 3,257,000.00 2002 106 12 +2 M.H.) 7,669,246.00 2003 108 15 3,817,400.00 2004 97 15 4,109,410.00 2005 80 11 1 5,314,512.00 2006 69 9 13 6,734,238.59 2007 115 14 16 Apts. 23 7,297,318.86 2008 87 6 20 4,428,894.00 2009 76 3 12 $2,376,189.00 10 Year Totals 915 114 16 apts. 69 $48,907,858.45 MUNICIPALITY OF WEST ELGIN YEARLY REPORT TO: COUNCIL OF THE MUNICIPALITY OF WEST ELGIN FROM: LORNE McLEOD, CHIEF BUILDING OFFICIAL DATE: February 11, 2010 RE: YEAR —END BUILDING REPORT Below is a summary showing the number of permits, number of houses, number of septic permits and value of construction for the past 10 years. 0:1reports \bldg.report.yearly.2009. doc Attention: Council MUNICIPALITY OF WEST ELGIN WATER WORK REPORT January, 2010 1. Several maintenance items were completed in the water distribution system over the last month. Major water line break on 1939 -1940 vintage cast iron water main on Graham Road. Hockey tournament had to be cancelled. We've had two breaks on this line in the last two months in West Lorne. Several water meters were replaced and fire hydrant repairs in the Crinan area. The fire hydrants in this Crinan area were installed two years ago and three quarters of the twenty three fire hydrants were leaking water and freezing in the closed position. Replacement parts were supplied by "Corix the supplier under the warranty. This problem was created by "offshore" produced material parts of lesser quality that what is standard in the water industry. 2. Spriet Associates will be presenting today at 11:30 am proposals for the Port Glasgow Park replacement sanitary sewer system. Discussion will take place at that time. 3. Water department staff are participating in training courses and upgrading their skills in the water industry which is mandatory by MOE guidelines. 4. Any new or unfinished business for discussion. Lloyd Jarvis N 7 N, Z z W W1 z W W 0 TO: FROM: DATE: RECOMMENDATIONS: Norma I. Bryant, HonB AMCT Clerk Tly of COUNCIL OF THE MUNICIPALITY OF WEST ELGIN NORMA BRYANT, CLERK FEBRUARY 11, 2010 RE: POLICY FOR CLOSED MEETING INVESTIGATIONS INTRODUCTION: In accordance with Section 239 of the Municipal Act the municipality has appointed a Closed Meeting Investigator effective January 1, 2008. DISCUSSION: .cot I The Closed Meeting Investigator has requested that Council adopt a policy /procedure for closed meeting investigations. Attached is the proposed policy for West Elgin. That By-law No. 2010 -11, a by -law to adopt to a policy for Municipal Closed Meeting Investigations be enacted. 22413 Hoskins Line, Box 490, Rodney, Ontario NOL 200 Tel: (519) 785 -0560 Fax: (519) 785 -0644 MUNICIPALITY OF WEST ELGIN POLICY MANUAL Chapter: Council Index No. CO -1.3 Section: Municipal Act Effective Date: Jan 1/08 Subject: Closed Meeting Investigation Revision Date: Page: 1 of 3 1 PURPOSE: 1.01 To provide for a procedure for closed meeting investigations. 2 POLICY: 2.01 The Municipality of West Elgin is committed to ensuring that requests for an investigation under Section 239.1 of the Municipal Act, 2001 as amended is dealt with in a fair, open and expeditious manner. 2.02 The municipality commits to full co- operation including the provision of all information requested by the Municipal Closed Meeting investigator, either written or through interviews, to assist the Investigator in his investigations. 2.03 The municipality commits to including any report received from the Investigator related to an investigation under the Municipal Act, on a public agenda and to considering such report in an open public meeting of Council or a Committee of Council. 2.04 This policy shall be posted on the municipal website and available from the Clerk's Office, 22413 Hoskins Line, Rodney, ON NOL 2C0 or by contacting the Clerk's Office at 519 785 -0560 or through the municipality's website at www.westeluin.net. 3 BACKGROUND: 3.01 The municipality has appointed Mr. John Maddox of JGM Consulting as a Municipal Closed Meeting Investigator and authorized him to conduct investigations upon receipt of a complaint in respect of meetings or part of meetings that are closed to the public to determine compliance with the Municipal Acf or the Municipal Procedural By -law and to report on the results of such investigations. 4 PROCEDURE: 4.01 Members of the public are encouraged to speak directly with the Clerk regarding a Complaint in order to resolve any concerns prior to beginning the formal complaint process. 4.02 Members of the public may submit complaints either to the Clerk's Office or directly to the Investigator relating to compliance with the Municipal Act or the Municipal Procedural By -law for meetings or part of meetings that are closed to the public. 4.03 All complaints will be treated as confidential, unless authorization is given by the complainant to release his or her identity. 4.04 Every request for an investigation shall be initiated through the submission of the "Municipal Investigation Complaint Form" provided. The said Complaint Form shall be made available to the public through the Clerk's Office or can be downloaded from the municipality's website at www.westelgin.net. Completed Complaint Forms will not be accepted by facsimile, e-mail or other electronic means. MUNICIPALITY OF WEST ELGIN POLICY MANUAL Chapter: Council Index No. CO -1.3 Section: Municipal Act Effective Date: Jan 1/08 Subject: Closed Meeting Investigations Revision Date: Page: 2 of 3 4.05 A completed Complaint Form shall be submitted to either the Clerk's Office or directly to the Municipal Closed Meeting Investigator and shall be accompanied by payment of an administrative/processing fee in accordance with the municipality's Fees Charges By -law Administration. The fee shall be payable in cash or bank draft to the Corporation of the Municipality of West Elgin, in accordance with the following: (a) By delivery to the Clerk in a sealed envelope clearly identified as a Complaint under Section 239 of the Municipal Act, or (b) By mail directly to: John Maddox, Municipal Closed Meeting Investigator 99 Edgevailey Rode, Unit #42 London, Ontario M5Y 5N1 4.06 Inquiries only may be submitted by e-mail to John Maddox: maddoxlo(a�sympatico.ca or by telephone at 519 951 -0330 during regular office hours. 4.07 A completed Complaint Form will not be accepted unless accompanied by payment of the required administrative/processing fee. 4.08 In the event that the Municipal Closed Meeting Investigator concludes that either an item discussed in a closed meeting ought not to have been discussed in such closed meeting or that Council did not act in accordance with its Procedural By -law, then the said administrative/processing fee shall be refunded to the submitting Complainant. 4.09 All complaints must contain: (a) Name of municipality (b) Complainant's name, mailing address, telephone number and e-mail address (if applicable) (c) Date of Closed Meeting under investigation (d) Nature and Background of the particular occurrence (e) Any activities undertaken (if any) to resolve the concern (f) Any other relevant information (g) Direction with respect to release of identity (h) Original signature 4.10 When complaints are submitted directly to the Clerk, the Clerk shall follow the following procedures: (a) Take all measures to ensure the envelope remains sealed and its contents remain confidential; (b) Assign a file number and record said file number on the envelope; (c) Log the file number together with the date and time received; (d) Forward to the Municipal Closed Meeting Investigator by regular mail. MUNICIPALITY OF WEST ELGIN POLICY MANUAL Chapter: Council Index No. CO -1.3 Section: Municipal Act Effective Date: Jan 1/08 Subject: Closed Meeting Investigations Revision Date: Page: 3 of 3 4.11 For all complaints, the municipality shall supply the following or any other information or documentation as requested by the Municipal Closed Meeting Investigator related to a complaint: (a) Certified copy of notice of meeting (b) Certified copy of agenda (c) Certified copy of minutes of meeting (d) Relevant resolutions (e) Municipal contact list. 5 ADMINISTRATION: 5.01 The Clerk shall ensure the procedure is followed. 6 REFERENCE: 6.01 Closed Meeting Complaint Form Schedule 'A' to By -law to appoint Closed Meeting Investigator 7 ATTACHMENTS: 7.01 None Council authorization: By -law No. 2007 -104 By -law No. 2009 -92 By -law No. 2010 -11 Date of signature COMPLAINT FORM FOR MUNICIPAL INVESTIGATION Section 239 Municipal Act 2001 (As Amended) COMPLAINANT `S NAME ADDRESS TELEPHONE E -MAIL HOME WORK CAN YOUR IDENTITY BE REVEALED DURING THE INVESTIGATION? YES NO PERSONAL INFORMATION IS COLLECTED UNDER THE AUTHORITY OF SECTION 239 OF THE MUNICIPAL ACT 1001 (AS AMENDED) AND WILL BE USED BY THE MUNICIPAL INVESTIGATOR TO CARRY OUT AN INVESTIGATION UNDER THE ACT. NAME OF MUNICIPALITY DATE OF CLOSED MEETING MUNICIPAL CONTACT NAME TELEPHONE BACKGROUND This should provide as much information as is required to explain the nature and background of the particular occurrence. (i.e.) Timing; Municipal Contact; Municipal Explanation. ACTION 1 Activities that the complainant has undertaken to resolve the matter. SUMMARY /COMMENTS Signature of Complainant Date: November 25, 2009 Memo To: Ontario Specialized Transit Systems Subject: Ontario Specialized Transit Services 2008 Fact gook We would like to thank you for your assistance in helping us to complete the enclosed Ontario Specialized Transit Services 2008 Fact Book. This report, containing operating statistics from 79 transit systems providing specialized transit services in Ontario, was prepared by the Canadian Urban Transit Association (CUTA), and funded by the Ontario Ministry of Transportation (MTO). The Fact Book provides detailed data for 2007 and 2008 and key performance indicators for each system. It also contains summary information for the province and population groups. We hope you will find this information of use in managing your system. Thank you again for your contribution to this project. Christopher Norris Director of Technical Services Canadian Urban Transit Association Encl. Main Office Bureau principal Suite 1401 55 York Street Toronto, ON Canada M5J 1R7 1500 St. Laurent Boulevard Ottawa, ON Canada K1G OZ8 416.365.9800 1=5 416.385.1295 4$ CUTA C -8b ACTU CANADIAN URBAN TRANSIT ASSOCIATION ASSOCIATION CANAOIENNE DU TRANSPORT UROAIN transit @cutaactu.ca www.cutaactu.ca 2009 Ottawa Office Bureau d'Ottawa C 613.842.3816 CD 613.744.7271 West Elgin Four Counties Transportation Contact: Joanne Groch Title: Administrator/Treasurer Telephone: 519 -785 -0560 Fax: 519- 785.0644 Email: jgroch @westeigirnet Dedicated Serv. Operated by Transit System/Municipality Private Contractor(s), number. Private Non Profit Org. VEHICLE KILOMETRES HOURS 2007 Rev. Veh. Km. Dedicated Service 54,128 Tot. Veh. Km. Dedicated Service 54,128 Rev. Veh. Hrs. Dedicated Service 1,483 Tot. Veh. Hrs. Dedicated Service 1,483 Non-Dedicated Service Veh. Km. Non Dedicated Service Veh. Hrs. PASSENGER DATA Dedicated Service 3,775 Non- Dedicated Service TOTAL PASSENGERS 3,775 Subscription! Pre booked 100 Reservation On- Demand !Day of trip Cancelled in advance No-shows !Cancelled at door 5 Unaccommodated trips Number of complaints OPERATING EXPENSES Administration $1,398 Operations: Internal Dedicated Service $25,731 Contract Dedicated Service Contract Non Dedicated Service Contract Taxi Scrip Maintenance (Vehicles Facilities) $5,290 Fuel $7,303 TOTAL OPERATING EXPENSES $39,722 OPERATING REVENUES AND OTHER FUNDING CONTRIBUTIONS Passenger Revenue $15,149 Other Operating Revenue Total Operating Revenue $15,149 Federal Contributions Provincial Contributions $777 Municipal Contributions $23,776 Other! Donations $20 TOTAL $39,722 CAPITAL EXPENSES Vehicles Purchased Debt Servicing Other Capital Expenses TOTAL CAPITAL EXPENSES CAPITAL FUNDING SOURCES Transit System Federal Contributions Provincial Contributions Municipal Contributions Other 1 Donations TOTAL CAPITAL FUNDING o� 2008 41,468 41,468 1,284 1,284 Other eligibility criteria includes persons with an application signed by a health care professional or doctor. From June 2008 a new bus was leased from the Four Counties Health Services. From Jan -June the old bus was in the ownership of the municipality of West Elgin. Ridership has decreased as a result of deaths and immobility of seniors. Ontario Specialized Transit Services Fact Book 2008 Operating Data Page 76 Population served: Service area (km Communities served: Service began: Advisory Committee members: Eligibility Committee members: Non Dedicated Service: Contractors: Taxi Scrip Program Available: 18,500 1,107.0 5 01101!1994 7 NIA SERVICE HOURS SCHEDULING Weekday. 0900 to 1600 Saturday. to REGISTRANTS Wheelchair/Scooter Users: Ambulatory: Attendants: Companions: Other: Total: Advanced booking notice: 1 days) Minimum notice for reservation: 24 hour(s) Reservations Scheduling: Manual FARE STRUCTURE 3,093 Effective Date 01/01/2008 Cash 3,093 Adult $4.00 100% Child $4.00 Student $4.00 Senior $4.00 169 Attendant $4.00 Companion 54.00 Other $8/rider round trip fare EMPLOYEE DATA Operators Other Operations Vehide Mechanics General and Administration Other TOTAL NUMBER OF EMPLOYEES Union Affiliations: Operators: Mechanics: Other (specify): Top Operator Wage Rate: 516.84 $13,834 Top Mechanic Wage Rate: PERFORMANCE INDICATORS 513,834 FINANCIAL R/C Ratio 59,437 Net Operating Cost 1 Capita $21,337 Total Exp. l Passenger 5100 Total Exp.! Elig €ble Passenger $44,708 Transportation Exp. 1 Passenger Dedicated Service Non- Dedicated Service Transportation Exp. Hour (Dedicated Service) OPERATING Registrants Capita Passengers Capita Passengers Registrant Passengers Hour (Dedicated Service) Kms l Passenger (Dedicated Service) Average Speed (Dedicated Service) $1,580 524,644 $9,070 $9,414 544,708 Eligibility Criteria: Unable to Board Unable to Use Other Criteria Sunday: Holiday Tickets/Cards (unit price) Full-time Active 27 31 58 10 10 Monthly Pass Free Part-time 5 5 Total 27 31 0.0035 0.0031 0.2041 0.1672 58.08 53.33 2.55 2.41 14.34 13.41 36.50 32.30 PASSENGER DATA Ambulatory Wheelchair /Scooter Users Attendants Companions Other (specified) TOTAL Ded. Service 2,100 315 678 3,093 Non -Ded. Service Veh. Number Peak VEHICLE DATA Non- Accessible Cars Accessible Vans Minivans Small Buses Other TOTAL DED. VEHICLES Vehicle ownership: Vehide maintenance responsibility: Municipality Accessible taxis: 1 1 1 1 Four Counties Health Services Avg. Capac ty per Veh. Wheelchair Ambulatory N/A 2 N/A 16 N/A 58 2007 2008 38% 31% 51.33 51.67 510.52 514.45 $14.18 $18.51 $10.15 $13.94 525.84 $33.59 4, Tay Valley Township DATE: January 18, 2010 TO: Ontario Municipalities RE: Municipal Property Assessment and Assistance to Retired Persons Living on Fixed incomes The following motion was passed on January 12, 2010 and was forwarded to the Premier of Ontario. Tay Valley Township seeks the support of other municipalities on this important issue: Whereas the municipal property assessment and municipal property tax calculation processes in Ontario used to be very straightforward And whereas while straightforward the processes were deemed to result in unfair taxation for the non- residential sectors; And whereas in attempting to modernize and make the processes fairer for all concerned, the resultant legislation has rendered the property assessment and property fax calculation processes in Ontario incredibly complex and difficult to understand or explain; And whereas the Province of Ontario recently changed the property assessment valuation dates from annually to every four years phased -in over four years, to reduce the immediate property tax impact for those properties whose values increased at a faster rate than others, at the expense of those properties whose relative values did not increase as much; And whereas at the time of making the property valuation date change the Province of Ontario committed to reviewing the assessment process; And whereas as long as taxes are levied based upon the market value of properties there will always be perceived winners and losers in a re- evaluation period; And whereas the practice of levying property taxes based upon property values is unlikely to change in the foreseeable future; And whereas the real losers in this whole process are retired persons living on fixed- incomes who simply wish to remain in the homes they live in, but through no fault of their own sometimes see their property taxes increase to harmful and unmanageable levels; And whereas municipalities cannot change the taxes levied upon such persons and properties because property taxes must be levied in a like matter throughout a municipality; And whereas municipalities cannot solve this problem because it is a matter that only the senior levels of government can address through their sophisticated information retention processes and their various responsibilities and programs for senior citizens; Now therefore be it resolved that the Province of Ontario be encouraged to continue its review of the assessment process with a view to greatly simplifying it; And further be it resolved that the Province of Ontario work with the Government of Canada to develop a process through the annual filing of income tax returns that would negate the impact of harmful property fax increases for refired pensioners; And further be it resolved that this motion be distributed to all municipalities in Ontario for their support. Motions of support can be sent to the attention of Rob Tremblay, Municipal Clerk by email at clerk(a7tayvalleytwp.ca or by fax or regular mail. Regards, Robert Tremblay Clerk DISCLAIMER This material is provided under contract as a paid service by the originating organization and does not necessarily reflect the view or positions of the Association of Municipalities of Ontario (AMO), its subsidiary companies, officers, directors or agents. Tay Valley Township 217 Harper Road, R.R. 4, Perth, Ontario K7H 3C6 www.tayvalleytwp.ca Fax: (613) 264 -8516 Phone: (613) -267 -5353 (613) 1- 800- 810 -0161 Christine Robinson, CAO /Clerk Mark Turner, Deputy Clerk Ken Gould, Public Works Manager Corporation of the Municipality of West Grey 402813 Grey Road #4, R.R. #2, Durham, Ontario NOG 1R0 Kerri Mighlon, Treasurer /Deputy Tax Collector Tel: 519- 369 -2200 Sharon Hinds Tax Collector /Deputy Treasurer Pax: 1 -519 -5962 Brian Marcell, CBO /By -Law Enforcement /Property Standards Toll Free: 1- 800 -538 -9647 E -Mail: info @westgrey.co WHEREAS the need for renewable energy resources is recognized at the federal, provincial, municipal and local community levels; AND WHEREAS the Council of the Municipality of West Grey has concern over the Green Energy and Green Economy Act in relation to its application to industrial wind turbines; AND WHEREAS there is evidence that the Act has created incentives for one group of residents to profit at the expense of others, the Act does not acknowledge infringement on the rights of property owners who have not leased their land for industrial wind turbine development, and thereby receive no compensation despite the reduced value and enjoyment of their land; AND WHEREAS there is also evidence of reduction in property values in areas currently with industrial wind turbines or in broad geographical areas where industrial wind turbines are being considered; AND WHEREAS these issues will bring about a reduction of assessment to any municipality within these areas which would have a deleterious effect on the tax base of affected municipalities; AND WHEREAS the Council of the Municipality of West Grey is dissatisfied with the Province of Ontario removing industrial wind turbine approvals and overall decision making approvals from the Municipal Governments; AND WHEREAS the Council of the Municipality of West Grey is dissatisfied with regulations imposed by the Province of Ontario on the erection and operation of industrial wind turbines with respect to land use planning and the impact on building economically viable and sustainable communities; AND WHEREAS the Council of the Municipality of West Grey is concerned with the overall adverse health effects that would be imposed on people in this community due to industrial wind turbines; AND WHEREAS the potential health effects is proving to be destructive and divisive to the social and cultural fabric of our rural urban community; AND WHEREAS other Ontario municipalities have passed resolutions articulating concern with the health effects and other issues associated with industrial wind turbines; AND WHEREAS the Council of the Municipality of West Grey requires validated reports and studies regarding the total impact and projected future impacts of industrial wind turbines on our rural urban community; AND WHEREAS the Council of the Municipality of West Grey raises the issue that there are enough industrial wind turbines erected and operating in the Province of Ontario at this time that should be studied for overall economic, social and cultural impact on rural urban communities, the people of the rural urban communities, the environment, wildlife, livestock and domestic animals; AND WHEREAS these necessary Province of Ontario reports and studies should be provided to the Ontario Municipal and County Governments; NOW THEREFORE BE IT RESOLVED that the Council of the Municipality of West Grey request the Province of Ontario to place an indefinite moratorium on industrial wind turbines in the Municipality of West Grey and other Ontario municipalities in order for the Province of Ontario to commission a third -party study regarding the health, safety and well -being of persons, and the protection of persons and property, including consumer protection of persons; AND FURTHER that the Council of the Municipality of West Grey request that the moratorium on industrial wind turbines remain in place until the Council of the Municipality of West Grey is satisfied that the health, safety and well -being of persons of the Municipality of West Grey and the protection of persons and property, including consumer protection of persons of the Municipality of West Grey is satisfied; AND FURTHER that the Council of the Municipality of West Grey call upon the Province of Ontario to consider the issues raised by the Municipality of West Grey and other Ontario municipalities and to consider alternative approaches to address the issues created by industrial wind turbines; AND FURTHER that this resolution be circulated to all municipalities within Grey and Bruce Counties, including Grey County and Bruce County, requesting their support and that this resolution be forwarded to AMO for circulation to all municipalities in Ontario also requesting support of this resolution; AND FURTHER that this resolution be circulated to all Provincial Ministers and MPP's, and the local and area MP's. D2 Mr. Kevin Eccles 402813 Grey Road 4, RR 2 Durham, ON NOG 1R0 January 13, 2010 TO: Yours truly Kevin Eccles Mayor Municipality of West Grey OFFICE OF THE MAYOR All Provincial Ministers All Members of Provincial Parliament Local Members of Parliament Area (Grey and Bruce Counties) Member of Parliament All Municipalities within Grey and Bruce Counties Grey County and Bruce County All Ontario Municipalities ORIGINAL SIGNED BY MAYOR KEVIN ECCLES Telephone: 519- 369-2200 Facsimile: 519 369 -5962 Email: keccles @greycounty.ca As Mayor of the Municipality of West Grey, on behalf of the Council and citizens of West Grey, I am calling upon the Province of Ontario to place an indefinite moratorium on industrial wind turbines in the Municipality of West Grey and other Ontario municipalities. The Council of the Municipality of West Grey, as its meeting held on January 11, 2010 passed the attached resolution regarding industrial wind turbines and is seeking all Provincial Ministers, MPP's, local and area MP's and all Ontario municipalities, including Grey and Bruce Counties to support this resolution. DISCLAIMER This material is provided under contract as a paid service by the originating organization and does not necessarily reflect the view or positions of the Association of Municipalities of Ontario (AMO), its subsidiary companies, officers, directors or agents. Sincerely, Donna Ethier, CAO/Clerk TOWNSHIP OF SOUTHWOLD OFFICE OF THE CLERK 35663 Fingal Line Fingal, ON NOL 1K0 Phone: (519) 769 -2010 Fax: (519) 769-2837 Email: dmcleod @twp.southwold.on.ca RESOLUTION OF THE COUNCIL OF THE CORPORATION OF THE TOWNSHIP OF SOUTHWOLD JANUARY 25, 2010 To All Ontario Municipalities: Please find a copy of the resolution adopted by the Township of Southwold Council at its January 25 2010 session We request your support on this very important issue. "WHEREAS the Province of Ontario has not enacted legislation to regulate, monitor or licence the care and control c dangerous exotic animals in captivity which may risk public health and safety; and, WHEREAS the Township of Southwold did pass a local municipal by -law in 2004 to regulate the keeping of exotic animals within the Township for the protection of the public; and, WHEREAS for reasons expressed in a judgment rendered in 2006, the Ontario Court of Justice quashed the said by -law, which reasons included but where not limited to the impact of the by -law upon individual and property rights; and, WHEREAS it is understood that a patchwork network of municipal by -laws attempting to regulate the care and control of exotic animals does exist in Ontario remain largely untested and unproved; and, WHEREAS there appears that there is no guarantee that the existing municipal by -laws will prevail if challenged in a court of law; and, WHEREAS notwithstanding prohibitions against possession of exotic animals contained in the aforenoted by- laws, it appears that owners of exotic animals may move from one community to another, never having to register potentially dangerous animals; and, WHEREAS there appears to be no uniform provincial approach to address many of the health, public safety, animal welfare, and environmental issues presented by the exotic species pet trade which has increased within the Province of Ontario over the last 20 years as a result of, among other things, captive breeding techniques and marketing tools such as the internet; THEREFORE BE IT RESOLVED THAT given the recent and tragic death resulting from a Tiger attack and the tremendous potential for other life threatening situations to occur across the province, and the uncertainty and efficacy of existing and diverse municipal by -laws across Ontario, the Premier of Ontario be strongly encouraged to develop comprehensive legislation regulating the exotic animal industry in order to guarantee the fair and consistent application of policy throughout Ontario for the safety of Ontario's citizenry and the exotic animal population; AND BE IT FURTHER RESOLVED that this resolution be forwarded to all municipalities in Ontario for support and that each endorsement be then forwarded to, the Premier of Ontario, the Ministry of Natural Resources, the Ministry of Community Safety and Correctional Services, Steve Peters, MPP, AMO, and the Township of Southwold," Carried. TOWNSHIP OF SOUTH STORMONT 4949 County Road No. 14 P.O. Box 340 Ingleside, ON KOC 1M0 Phone: (613) 537-2362 Fax: (613) 537 -8113 Email: info @southstormont.ca January 18, 2010 To: All Municipalities in Ontario Re: Support Request The Council of the Township of South Stormont passed the following resolution on January 13, 2010; your support would be appreciated. Please contact the Township of South Stormont at the address above for further details concerning this motion and we look forward to receiving your anticipated support. Moved by: Seconded by: Yours truly, Betty de Haan, CMO CAO /Clerk Councillor Tammy Hart Councillor Cindy Woods Resolution #010/2010 Whereas Council has reviewed the position taken by: 1. The Township of Essa as outlined in Resolution No. C222 -2009; and 2. The Township of Mulmur as described in correspondence to Hon. David Ramsey in November, 2007 and Hon. Donna Cansfield in November, 2009 with regards to the accountability of Conservation Authorities; And whereas courts have held that fees cannot and should not raise more than 100 per cent of the reasonable cost to provide the service. This principal is presented in the Building Code Act of Ontario; And whereas it is the opinion of Council that the roles, responsibilities and authority provided to Conservation Authorities do not have mechanisms in place to ensure appropriate use of public funds and elimination of duplication and accountability measures are adhered to. Now therefore be it resolved that Council supports the positions taken by the Township of Essa and the Township of Mulmur, as attached, and further, strongly encourages the Province of Ontario to conduct a review of the Conservation Authority mandate, responsibilities and allowable cost recovery methods. Further be it resolved that Council circulate this motion to MNR, MMAH, OMAFRA, DFO, AMO, AMCTO, OBOA, our local MP and MPP and all Ontario Municipalities for their support and endorsement. Carried. DISCLAIMER This material is provided under contract as a paid service by the originating organization and does not necessarily reflect the view or positions of the Association of Municipalities of Ontario (AMO), its subsidiary companies, officers, directors or agents. DS January 29, 2010 Municipality of West Elgin 22413 Hoskins Line P.O. Box 490 Rodney, Ontario NOL 2C0 Attention: Norma Bryant, AMCT Clerk Highway 401, Bridge Rehabilitations G W P 141 -99 -00 Furnival Road Underpass Dear Ms. Bryant: P13] i1C PAl.rtY OF Ws'ST ELGIN FEE a 2010 1 As discussed January 20, 2010, Dillon Consulting Limited has been retained by the Ministry of Transportation to complete the Detailed Design and Class Environmental Assessment of the rehabilitation of four structures over Highway 401 in Elgin County, including the Furnival Road Underpass. It is anticipated the rehabilitation of the Furnival Road structure will be completed over six months, between May and November, 2010. During construction, a single lane of traffic will be maintained in each direction on Furnival Road. Overnight full closure of Highway 401 in one direction will be required up to four times during construction for girder removal and replacement. During the closures, Highway 401 traffic will be diverted to the Emergency Detour Routes. The full closure of Highway 401 will be completed overnight, when traffic volumes on Highway 401 are typically the lightest. To accommodate the overnight construction activities, we are requesting that West Elgin Council grant an exemption from the West Elgin Noise Control By -law (2004 -77) for the proposed work. We cannot specify dates as the timing of specific construction activities, including the overnight work, is up to the Contractor. As a result, we are requesting Council grant an exemption for the duration of the project, with the provision that the Municipality and residents with homes within 1 km of the structure be advised in writing one week in advance of the overnight construction activities. If an exemption is granted by Council, a special provision will be included in the construction Contract, outlining the specific details of the exemption. �unl inuct1 D1LLON CONSULTI NG 130 Dufferin Avenue London, Ontario Canada N6A 5R2 Mail: Box 426 London, Ontario Canada N 4W7 tele pnone (519) 438 -6192 Fax (519) 672 -8209 Dillon Consulting Limited Nlunicipalilr nJ Wes1 Elgin Page 2 January 29. 2010 Please advise when this request will be brought to Council and if a representative from Dillon or MTO is required to attend the meeting. Thank you for your assistance on this project. Through you we will keep Council informed of progress. Please contact us if you require additional information. Yours sincerely, DILLON CONSULTING LIMITED SNS:amb Sabrina Stanlake, RPP for Jeff Matthews, P.Eng. Project Manager cc: Brian Goudeseune, MTO Bob Felker, MTO Our File: 09 -2128 11 \5umw/ Thanking you in advance. Yours truly it,a Ann Smith Canada Day Committee /as T unicipalit of imt Pgin Corporation of the Municipality of West Elgin 22413 Hoskins Line Rodney, Ontario NOL 2C0 February 11, 20110 Dear Mayor Council: Re: Canada Day, Miller Park, West Lorne Thursday, July 1st 2010 Our Canada Day Committee will be organizing our Canada Day celebration. The following service clubs will be participating Kiwanis Club of West Lorne, Optimist Club of West Lorne, West Elgin Community Health Centre, West Lorne Lawn Bowling Club, West Lorne Rodney Fire Departments, Knights of Columbus and West Lorne Legion. The committees will be meeting to organize the events. The following is a list of events to date, however more activities may be organized. Thursday, July 1st 1. BaseballNolleyball Tournament; 2. Kids Country Carnival which was a huge success thanks to the local businesses; 3. Knights of Columbus Fish Fry; 4. Opening Ceremonies; 5. West Lorne Firemen vs. Rodney Firemen Fun Baseball game; 6. Snake Lady Show; 7. Fireworks West Elgin Fire Departments. We are therefore requesting support for the following: (a) Council approval to hold Canada Day celebrations at Miller Park/Rodney Park on July 1 2010; (b) Provide a grant for the use of the arena on July 1 if necessary; (c) Authorization to request funding for the celebrate Canada Day program from Heritage Canada; (d) Funding to cover the fireworks expense. 22413 Hoskins Line, Box 490, Rodney, Ontario NOL 2C0 Tel: (519) 785 -0560 Fax: (519) 785 -0644 Dear Municipality of West. Elgin Council. TB'i' Youth Wellness and Education Centre Devin Pearson. Director 151 Maple St. P.O. Box 554 Rodney, ON NOL 2C0 The TBT Youth Centre would like to request the use of the West Elgin Community Centre, Rodney, to hold another fund raising dance on Saturday, February 13. 201 The dance will he held from. 7:00 -10:00 and he open to students in Grade 5- Grad.e 9. Refreshments will also be available. The dance will be fully chaperoned and the directors of the Youth Centre will be on site. We would request that all fees be waived and the facility be set up in the afternoon of the 13 with the assistance of the Youth Centre volunteers. Please contact Devin Pearson at 519 -785 -1912 if you require more information. Thank you in advance for your consideration o'fthis natter and also for your continued support of opening a full- service Youth Centre in Rodney. Yours in Education, Devin Pearson Director TBT Youth Wellness and Education Centre MUNrCrPALirr OF WEST ELGIN FEB 4 2010 Thursday February 4, 2010 Municipality of West Elgin c/o Graham Warwick, Mayor 22413 Hoskins Line PO Box 490 Rodney, ON NOL 2C0 Details of the event are as follows: Wednesday March 3 8:3Oam- 3:00pm New Sarum Diner, We look forward to seeing you there. Sincerely, Alan Smith General Manager Economic Development 9��� `4 T,„ A 2 Re: Elgin County Conference Series: Evolution of the Harvest On Wednesday March 3rd Elgin County will host a seminar for farmers, agricultural service providers, and rural leaders to learn more about what's around the corner and down the road for on -farm alternative energy, biomass, biofuel and energy crop developments. Dynamic keynote and informative presentations will be delivered by speakers ranging from innovative farmers to energy researchers. Registration cost is $25 (including breakfast, lunch, and refreshments) and can be done on -line at www.progressivebynature.com or by calling 519- 631 -1460 ext 164. Enclosed are 12 registration forms that we encourage you to share amongst your colleagues and support this exciting new Energy and Environment Conference Series being developed by our Economic Development department. County of Elgin Economic Development 450 Sunset Drive St. Thomas, On N5R 5V1 Phone: 519 631 -1460 www.elgincounty.ca Progressive by Nature West Elgin Chamber of Commerce Minutes for 5 Jan 2010 Rodney Old Town Hall Guest Speaker Presentation 20 minutes Devon Pearson Youth Center Goal is to share information regarding the opening of a youth center in Rodney. Wants to act as a hub to connect youth with services of which they might not be aware. Assist with homework tutoring, health center connections, provide opportunity to connect with Wet Lorne services without the need for transportation. Goal was to open 4 Feb, but may slide to mid spring. Looking to provide a more constructive outlet for youthful energy overcome the "There's nothing to do here" syndrome. They often are the first to leave, and they return when raising a family. Want to provide motivation for the return. One suggestion is to create crafts and artwork to beautify the town, and maybe present the good outcomes to the local seniors, etc. At heart, young people are good folks, they need an opportunity to have a positive outlet. The center will be open to all, and business people are welcome to drop in and see what is being done. Intention is to be "fully funded by means beyond government grants. Intent to be open daily 4 to 11 pm. Fusion center in Ingersoll is the model. Currently looking at locating at the old hardware store in Rodney. Privileges will be earned. Staffing to be initiated based on an initial grant, and staffed with full time and volunteer personnel. Ran an initial dance, for grade 6 level, and future will be for teens and "tweens Definite need appears to be grade 6 to grade 13. Ages beyond are welcome, but will be used as volunteers. Want to have the students actually build it to instill ownership, and will be tutored by competent builders, etc. Organization formed by several local adults parents of children in this age range. Close to formalizing the structure. Attendees Keith Fretter, Wendie Dupuis, Ed Kebbel, Robert White, Ed Markham, Tom Rita Hurley, Devon Pearson, John Slaats, Irene Puddester, Jonathan Wolf, Heather Bell. Apologies from Iris Fretter and Libby Barrett Futcher. Welcome from Chair Approval of Minutes Agenda Wendie Dupuis moved, seconded by Irene, carried. Review of minutes moved by Robert, seconded by Jonathan, carried. Business arising from previous meeting None from the floor Volunteer Recognition Awards Keith read the letter, and the item was discussed. Recognized that we are unable to address this topic this year, and will strike a committee at the next general meeting to create a list to be reviewed in November. Ted to download the form and nominate Norma Schneckenberger and Bill Purchitis from the last two years. Alan Smith letter Keith read the letter. Some confusion appears to exist as to who is doing what. The TJ appears to be setting up a duplicate service book. Alan to be informed that a membership exchange arrangement exists, and that we should already be considered to be members. Ted to draft letter. Strongly word the lack of exposure for western Elgin within their marketing plan process. Progressive by Nature logo issues to be raised in the same letter. REPORTS Director's Report: Nil report Correspondence: Business Beat, Chamber Group Insurance Plan, United Way "Bridges out of Poverty" seminar, OCC invoice, Websites Made Easy invoice, Imperial Oil "The Review EBRC "Elgin Advantage various seasonal greetings. Have solved the e-mail issues, but need up to date information regarding e-mail addresses. Ed Markham requested to provide update. Heather Bell sent a card from Dalton McGuinty. Committee Reports: Treasurer: Bank balance is $8425.73, and Receipts were $6598.57, and disbursements are $2285.96, and net income is $4312.61. Moved by Heather, seconded by Ed Markham, report accepted. Membership: 51 members as of today. Welcoming Committee: Pam and Jesper Andersen on board to help. Tourism Economic Development: MPower want to run the "Home for Christmas" event, and are partnering with us and the Dutton /Dunwich Chamber. Looking for approval so that they can enter the required information in several tourist guides, to attempt to get people to buy gift certificates for goods to be purchased within the community. We agree Merchants are encouraged to support this activity. Committee meeting to occur Tuesday evening, 12 Dec 2010, 7 PM, Keith's. Business After 5: Keith read e-mail for Libby, which provided a reconciliation of some expenses, but the event was a success. We appear to have made a $98 profit to offset the cost of the food. Discussion regarding insurance coverage for special event insurance to cover alcohol, etc. Wendie Dupuis volunteered to hold one in May. Community Improvement: Meetings planned with Rodney Horticultural, and West Lorne Horticultural hosted by Ted Halwa. Website Committee: Data issues being overcome old data corrupted and changes being made manually. Other Business Requesting input on the topic of a location for a proposed Farmer's Market There is interest, either in town or on the fringe. A "tailgate" system angle parked down the hardware store parking lot may work. A weekday evening may work, out -of -doors may be preferable, and the old railway right of way might be a suitable site. A Chrysler dealership may be taking the place of Miller Motors. Heather signs and where are they municipality is storing the letter sign, Heather has the parade sign, and Ed Markham has the parade banner. Robert Money is available for mass transit, and there is no real intercommunity bus service. Shouldn't we be pursuing a more comprehensive transit program? Jonathan asked to take the concept back to Council is there an appetite for providing such a service, and is there funding? Summer bus service is not well used. Any new or expanded service would need to be sustainable. Jonathan to provide information regarding funding opportunities, and service issues for Feb meeting. London Free Press has a spread every week regarding the Chamber. Ed Markham wants to know if there would be an appetite for a similar approach monthly in the Chronicle. Ed to provide info by Feb meeting. Please Note: See you 2 Feb 2010! Website address www.westelginchamber.ca