Loading...
03-36 COUNTY OF ELGIN By-law No. 03-36 BEING A BY-LAW TO RESTRICT THE WEIGHT OF VEHICLES PASSING_OVER BRIDGES' " WHEREAS Section 123 (2) of the Highway Traffic Act, being Chapter H.8, RS.O 1990, as amended, provides that the Municipal Corporation or other authority having Jurisdiction over a bridge may by by-law limit the gross weight of any vehicle or any class thereof passing over such bridge, and the requirements of Subsection 1 with respect to the posting up of notice apply thereto; and vehicles passing over of imit the weight WHEREAS it is deemed expedient to certain bridges in the County of Elgin. the Municipal Council of the Corporation of the County of Elgin NOW THEREFORE enacts as follows: 1 That no vehicle or any class thereof, whether empty orloaded, shall be operated over any bridge designated in Schedules NO.1 and No, 2, forming part of this By-Law, with a weight in excess of the weight limit prescribed in the Schedule for such bridge, 2. That any person violating any of the provisions of this By-Law shall be subject to the penalty provided in Section 125 of the Highway Traffic Act. 3. That this By-Law shall become effective once a notice of the weight permitted, legibly printed, has been posted up in a conspicuous place at either end of each bridge designated in the attached Schedules. November 14,2005 That this By-Law shall be effective upon passing and unti By-Law No. 01-36 be and is hereby repealed That 4. 5 time this 25th day of November 2003 READ a third time and finally passed this 25th day of November 2003. \ Mark G."Mcuona.~, Chief Administrative Officer. READ a first and second //-11 ,¿...._~ 1 By-Law No. 03-36 SCHEDULE NO Type of Floor Finish Year of Construction BRIDGESQN_CQUNTY ROADS Weight Limit in Tonnes Location Name of Bridge Road No. Bridge No. (MTO) No Concrete 1900 8 Lot 16, Range 1 North of Union Road, Township of Southwold Meeks 27 5-133 1 Associates as This weight limit is based on the detailed evaluations and recommendations of Spriet per their report dated October 4, 2003. Steel 1938 Level 1-13 Level 2-18 Level 3-23 Reg. Plan 117, former Village of Port Stanley, now Municipality of Central Elgin, East Side Kettle Creek, Lot 5, West Side Kettle Creek, Lots 5 and 6 King George Lift Bridge 4 5-136 2 This weight limit is based on the detailed evaluations and recommendations of Byrne Engineering Inc, as per their report dated November 17, 2003. SCHEDULE NO.2 By-Law No. 03-36 BRIDGES ON LOCAL ROADS No Bridge Name of Location Weight Year of Type of No. Bridge Limit in Construction Floor (MTO) Tonnes Finish - 1. 5-60 Fulton Lots 3 and 4, Range Level 1-12 1912 Concrete I, West of River Level 2-18 Road, Township Level 3-23 of Southwold 2. 5-138 Jamestown Lot 28, Con. II, 2 1909 Wood Municipality of Central Elgin 3, 5-158 Vienna Lot 14, Con. III, Level 1-10 1925 Concrete Municipality of Level 2-15 Bayham Level 3-24 4. 5-139 Gillets Lot 27, Con. IV, Level 1-25 1930 Concrete Municipality of Level 2-32 Central Elgin· Level 3-34 This weight limit is based on the detailed evaluations and recommendations of Spriet Associates as per their report dated October 14,2003.