September 27, 2005 Agenda
ORDERS OF THE DA Y
FOR TUESDA Y. SEPTEMBER 27. 2005 - 9:00 A.M.
PAGE # ORDER
Meeting Called to Order
Adoption of Minutes - for the meeting of September 13, 2005
Disclosure of Pecuniary Interest and the General Nature Thereof
Presenting Petitions, Presentations and Delegations
Motion to Move Into "Committee Of The Whole Council"
Reports of Council, Outside Boards and Staff
Council Correspondence - see attached
1 ) Items for Consideration
2) Items for Information (Consent Agenda)
OTHER BUSINESS
1) Statementsllnquiries by Members
2) Notice of Motion
3) Matters of Urgency
In-Camera Items (see separate agenda)
Recess
1st
2nd
3rd
4th
5th
2-59 6th
7th
60-68
8th
69-78
9th
10th
11th
12th
13th
14th
Motion to Rise and Report
Motion to Adopt Recommendations from the Committee Of The Whole
Consiq'r~tion of By-Laws
ADJOURNMENT
t.'/\;>'.,:i-',
10:00 - 11 :00 A.M.
"WALK THROUGH AND COFFEE BREAK" AT THE ELGIN-ST. THOMAS
EMS SATELLITE BASE - 31 SHAW VALLEY DRIVE, ST. THOMAS
At 11 :00 A.M. upon returning from the Ambulance
Base Council photos will be taken.
LUNCH WILL BE PROVIDED
REPORTS OF COUNCIL AND STAFF
September 27.2005
Councillor Reports - (ATTACHED)
3 Lynn Acre - Tillsonburg District Memorial Hospital Annual Report
6 Paul Baldwin - Elgin St. Thomas Health Unit Annual Report
12 Bonnie Vowel - St. Thomas Elgin General Hospital 2004-2005 Highlights
Staff Reports - (ATTACHED)
14 Chief Administrative Officer - 2006: A Look Ahead
22 Purchasing Co-Ordinator - Donation Form, Policy and Procedure
26 Director of Financial Services - Budget Comparison - August 31,2005
29 Director of Financial Services - Ambulance Base Update - August 29, 2005
33 Financial Analyst, Director of Financial Services, Director of Engineering Services - Capital
Projects Budget as at August 31,2005
50 Manager of Archives and Director of Library Services - Museum Facility Design and Draft
By-Law
59 Director of Senior Services - Bobier Villa - Ontario Nursing Strategy
Director of Engineering Services and Purchasing Co-Ordinator - Tender Award -
County Road 74 Slope Rehabilitation
2005 Annual Report
Tillsonburg District Memorial Hospital
Lynn Acre, Director TDMH
Diagnostic Imaging: On June 30, TDMH became the first community hospital in the Thames
Valley Hospital Planning Partnership (TVHPP) to link into the Thames Valley Digital Imagining
Network. X-rays and ultrasounds are not stored on film anymore; instead, they are stored as
computer files. This shared imaging project is the first for Ontario and one of two underway in
Canada. It means that staff and physicians who need the information to care for a patient can now
access Tillsonburg patients' x -rays and ultrasounds from any hospital within the network with just
the click of a mouse. The TVHPP includes; London's St. Joseph's Health Care and London Health
Sciences Centre, Strathroy General Hospital, Tillsonburg District Memorial Hospital, Four Counties
Health Centre in Newbury, St.Thomas Elgin General Hospital, Alexandra Hospital in Ingersoll and
Woodstock General Hospital. London and Tillsonburg hospitals are now connected, by December
all eight hospitals will be on the system. State-of-the-art technology ensures the privacy and security
of all patient information. Access to images is limited to those who require it to diagnose and/or
treat a patient. Two data centers constantly mirror the information, so ifthere were a malfunction at
one centre, the other centre would automatically take over to ensure an uninterrupted flow of vital
patient information. The Ontario Ministry of Health and Long-Term Care and Canada Health
Infoway, a federal-provincial-territorial initiative responsible for accelerating the development of
Electronic Health Records across Canada, are jointly funding the TVHPP pilot phase of the shared
digital imaging project.
Improved Patient Care Through Partnerships: A local pilot project, aimed at improving care for
patients suffering with delirium (the sudden onset of confusion) will soon be helping others as well.
Together with the Regional Geriatric Team and the Oxford Community Care Access Centre,
TDMH launched a program in 2004, designed to improve the detection and management of patients
with delirium through education, and changes to the manner in which referrals are made. The
routine Confusion Assessment Method (CAM) screening that's administered to all patients admitted
to TDMH identifies patients for assessment. As part ofthe project, and to ensure a well-rounded
care model, hospital nursing team members were also provided with a three-hour training session
that focused on how to differentiate between depression, dementia and delirium. This ensures that
referrals made to the Oxford Geriatric Assessment Team are more appropriate. TDMH's pilot
delirium project has been so successful, that plans are in the works to implement similar initiatives
at other facilities as well.
The same basic philosophy that spawned the delirium project came into play when the hospital
launched its Bedside Swallowing Assessment Project. Designed to improve the flow of care to
patients who have difficulty swallowing, or dysphagia, the project began with the formation of a
team which included a clinical nurse educator, occupational therapist, dietitian, physiotherapist,
registered respiratory therapist and a speech-language pathologist. Working together, the team
developed a swallowing screening system, and a plan to follow when a physician refers a patient for
assessment. When testing is complete, the team makes recommendations to the patient's physician
about the next steps in providing care and then continues to monitor and reassess the patient, usually
on a weekly basis to make changes to his or her care regime as necessary.
Dialysis Project: For patients in the area who rely on dialysis to survive, having treatment in
Tillsonburg will shave significant amounts oftime off patients' weekly treatments, leaving patients
more time to spend with family and friends. TDMH's six-chair dialysis unit, a satellite ofthe
LHSC, is being constructed in the north wing ofthe first floor. Ten full and part time staff have
been hired to run the unit, which is scheduled to open in December.
2
Safety Award: For being a leader in advancing occupational health and safety, the Tillsonburg
District Memorial Hospital received an Award of Merit in 2005 from the Health Care Health and
Safety Association. The award was in recognition of the hospital's innovative Safe Moves training
video. Developed by the hospital's Safe Moves Committee, the video illustrates the proper way to
conduct patient lifts and transfers, and features an added twist: Thanks to collaboration with the
Oxford County Emergency Medical Service, the video also demonstrates the right way to remove
patients from vehicles when they present at the hospital emergency department. The video has been
used for stafftraining, but is also being shared with other hospitals and health care facilities that are
implementing minimal lifting programs as well.
Accreditation Survey: A voluntary process, accreditation is a concrete way for hospital staffto
gage their performance and service, and for hospital clients to know they're getting the best possible
care. Utilizing a multi-pronged review, accreditation identifies a facility's strengths, and suggests
areas for improvement. Each department reviews its service, measuring their performance against a
detailed set of criteria. These reports were submitted to the accreditors, who reviewed them and
followed up with an on-site review last September. They spent 2 1/2 days at TDMH interviewing
teams and focus groups, and touring various areas including Pharmacy, Diagnostics and the Lab.
Two months later, the council honoured the hospital with a three-year accreditation with no required
follow-up visit or report. Today, changes to the accreditation process make it virtually impossible
for a facility to achieve accreditation without recommendations. Team members at TDMH have
embraced the new format, and are using recommendations from the surveyors to help improve
operations at the hospital for both patients and staff.
Technology: Technology is taking health care into the space age in the TVHPP. The eight
hospitals of the partnership, which includes TDMH, are working toward an Electronic Patient
Record (EPR) system that will mean better care for patients, and greater efficiencies for staff. The
EPR will expand upon Cerner, a hospital information system that's been in place for years at LHSC.
The system tracks patients as they visit the hospital's different services - even those who visit the
hospital's emergency department of diagnostic services on an outpatient basis. The first phase of
EPR implementation will streamline services such s patient registration and scheduling, chart
tracking, chart deficiency, transcription, pharmacy, order entry and results viewing, with each
TVHPP hospital implementing the system based on its own priorities. Once all the modules are in
place, patients in Tillsonburg will reap benefits including decreased test duplication and more
timely access to information. But caregivers will also benefit because the EPR will make it faster
and easier to access the most up-to-date patient information available, to share that information
when interdisciplinary care is required, and to access information when consultations are necessary.
It will also eliminate the need to track patients on paper. Of course preserving the security of patient
records and information is a priority in implementing this new technology and pains are being taken
to do just that. While high technology often comes with a high price tag, the collaborative approach
being taken by TVHPP means facilities will be able to access the technology while realizing
efficiencies and cost-savings through a single contract. The EPR will be fully operational by the end
of2005.
Operation "IMPACT": If the best way to prevent impaired driving-related tragedies among youth
is by making an IMP ACT on them, TDMH is doing its part. On March 8, the hospital hosted its first
ever Operation IMP ACT. An acronym standing for Impaired Minds Produced by Alcohol Cause
Trauma, IMP ACT was started in 1989 at LHSC and brought to Tillsonburg in an effort to educate
high school students about the dangers of impaired driving. Twenty-two Leadership Program
students from Glendale High School attended the 2-hour event, and in interactive 20-minute
seminars, learned how alcohol affects an individual's ability to function, and the resulting
3
consequences. Students spent time in the back of an ambulance with members of the Oxford County
Emergency Medical Services Team, seeing how victims would be boarded and collared at the scene
of an accident. They also had a session in the emergency department, where they witnessed a mock
trauma in which the victim portrayed a passenger in a vehicle where the driver had been drinking.
OPP also participated by allowing students to test out a set of goggles designed to show the effects
of alcohol in the bloodstream. Students also learned what can happen to the chest and airway during
a trauma, and saw how a patient would be intubated and a chest tube inserted. Perhaps the most
poignant dynamic of IMP ACT, however, was the session in the hospital morgue with the coroner
who presented three local impaired driving-related cases that shook students to the core. Though
IMP ACT sometimes relies on grim detail and shock value to make its point, the effort is worthwhile
if just one student thinks twice about drinking and driving.
Board Chair/CEO Report: John Moylan
It's been another exciting year for Tillsonburg District Memorial Hospital. One of the Board's most
important tasks this year was the selection of a new President and Chief Executive Officer. Brenda
Butters retired last July after four years in the position and twenty years with the organization. We
advertised nationally, interviewed a number of candidates and selected Tom McHugh, who grew up
outside Ingersoll and has held a number of senior leadership positions in hospitals as far away as
Thunder Bay.
Last summer we were notified that our budget increase from the Ministry of Health and Long Term
Care would be just I %. Across Ontario, hospitals are experiencing annual growth in expenses
between 6-8% due to increasing labour and supply costs, population growth and the aging
population. We were forced to undertake a process of cost cutting and the result was some job loss
with the remaining team members taking on extra duties. We did not cut any care to patients.
At the same time, the hospital has experienced unprecedented demand for inpatient beds resulting in
patients being accommodated in the Emergency Room overnight when no inpatient beds are
available. These 'back-ups' are due to a lack of Long Term Care (Nursing Home) beds in the
community. We continue to advocate with MHL TC for more long-term care beds and for realistic
funding increases so that we can preserve the important services we provide to our tri -county
community in Oxford, Elgin and Norfolk Counties.
The demand for these important services continues to grow and change as our community
requirements change. A second full time general surgeon was recruited last fall and we added
another ultrasound machine and technologist. This year we have increased the number of cataract
surgeries we perform and we will be ready later this year to offer dialysis to thirty area patients who
are currently traveling to London or Woodstock for their life-sustaining treatments.
On June 30, our Chief of Staff for the last 20 years, Dr. Richard Dalby, retired. He has been
replaced with Dr. Barry Roth.
elgin
st. thomas
health unit
ELGIN ST. THOMAS HEALTH UNIT
ANNUAL REPORT
TO
THE COUNTY OF ELGIN
SEPTEMBER 2005
Submitted By:
Elgin St. Thomas Health Unit
Annual Report
Of Elgin St. Thomas Health Unit
To County of Elgin
September 2005
INTRODUCTION
The Elgin-St. Thomas Health Unit is pleased to provide the following report related to its
activities in 2005. The Health Unit is a team of professionals who are dedicated to building
a healthy community by promoting and supporting the health of the people who live, work,
and play in Elgin County through the delivery of effective public health programs and
services. Listed below are just a few highlights of the many programs and services we
offer in Elgin County. The highlights are divided into two main program areas: health
promotion and health protection.
We are proud of our achievements this year and appreciate the opportunity to share these
highlights. Thank you to the County of Elgin for their continued support!
HEALTH PROMOTION HIGHLIGHTS
In promoting the health of Elgin County residents, the goal of the Health Promotion
programs and services is to increase the length and quality of life by reducing sickness
and death associated with chronic diseases like cancer and heart disease, injuries and
substance abuse and by promoting the health of children, youth and families.
~ Over the past 7 months, our ambitious health promotion staff:
. Responded to about 11,400 telephone, drop-in and e-mail requests for advice and
information
. Provided about 40 prenatal classes across the County
. Made 1,053 home visits to families with babies and young children
. Offered 236 parenting sessions, mostly through our Baby and Me program
. Gave 154 presentations to groups in Elgin, reaching about 5,200 people on a
variety of topics
. Communicated to the public through about 70 media ads, articles and interviews
. Screened about 2,800 children for oral health problems and treated 171 children
with urgent dental needs under the Children in Need of Dental Treatment Program
That's on top of many other educational, partnership and advocacy activities, along with
the 1,550 hours of service provided by our great volunteers.
~ There could be as many as 15,000 women, 50 years or older, in the Southwest region
who do not have a Family Physician and fall within the target age group for screening
at the Ontario Breast Screening Program (OBSP). We are working with the Cancer
Prevention and Early Detection Network-Southwest Region in order to reach some of
these women in Elgin County. These women will be reached through the media,
women's groups, walk-in clinics and emergency departments, and encouraged to self-
refer to OBSP at the St. Thomas-Elgin General Hospital.
2
~ Every year, the Health Unit is mandated to assess the cost of a "Nutritious Food
Basket", which is a tool that measures the cost of healthy eating, based on nutrition
recommendations. It consists of a fixed basket of food items for various age/sex
groups, and it is often expressed as the minimum cost to feed a reference family of four
(a man and a woman each aged 25-49 years; a boy 13 -15 years of age and a girl of 7
-9 years).
The total weekly cost for a family of four, comparing Elgin to Ontario is shown below:
1999
2000
2001
2002
2003 2004
Ontarioaverage $113.28 $111.08 $118.95 $123.58 $121.92 122.83
Elgin Average
$112.43 $106.06 $114.00 $123.00 $122.75 $124.39
This indicates a 1.3% increase in the cost of basic foods from 2003 to 2004, in Elgin.
Meanwhile, food banks in our area continue to report increased usage. We share
information about the cost of food and food bank usage with many of our partners in
Elgin County, to assist them in planning programs and services and to increase
awareness about local poverty issues.
~ In an effort to reduce the smoking rates in Ontario, the Provincial Government invited
all health units to apply for Smoke-free Ontario Strategy funding. Some of these grant
applications were competitive. We are pleased to report that we received all of the
following funding that we applied for:
. Startup and Policy Promotion and Enforcement: $133,000
. Worksite Intervention: $54,765
. Innovative Smoking Intervention: $69,737
. Youth Action Alliances: $110,000
With this funding, a few of our activities over the next few months include increasing
smoking cessation access through workplaces and community programs, funding high
school-based initiatives and supporting a variety of youth-initiated activities through the
Youth Action Alliance program.
~ Within the past few months, we launched the "Recess Ambassadors for the Playground
(RAP) Program" at several schools in Elgin County. This program encourages
students to be leaders on the playground, by facilitating co-operative games during the
lunch hours. This initiative promotes active living in the school community, reduces
bullying behavior and sedentary boredom and enhances the skills of the older students
and gives them the opportunity to be responsible and facilitate groups. The program is
a half-day session where the students learn leadership skills, conflict resolution, fair
play and co-operative games. The program is scheduled to run each noon hour at the
school.
3
~ In Elgin County we have a CPNP program - Mam & Bebi and a CAPC program Family
Education Support Program Aylmer (FESPA). The Health Unit is very involved in both
projects. Our dietitian works with the women and babies in the Mam & Bebi program,
co-facilitating the group presentations and providing resource information to the peer
support worker. A number of Health Unit staff participate in the FESPA program
through presentations to the women attending. Presentations include dental health,
smoking cessation, and a variety of other health related topics. We are pleased to be a
partner with these community projects and are investigating ways in which to expand
our involvement.
~ As of September 1,2005, the Booster Seat Law was implemented. The law now
requires children under the age of 8 years old or 80 Ibs or 4'9" to use a booster seat.
In order to support the implementation of this law, the Southwest Regional Child
Passenger Safety Network launched a Regional Booster Seat Campaign. We are
increasing public awareness about the need for booster seat use through the media,
our partners and our programs and services.
~ We prepared a healthy weight strategy to guide our health unit initiatives over the next
three years. This is in response to a growing epidemic of overweight problems and
obesity. The 2000/01 Canadian Community Health Survey found that 38% of Elgin-St.
Thomas residents are classified as overweight and 16% as obese, giving a combined
overweight and obese population of 54%. One initiative under this strategy is to host a
forum on November 2nd to increase awareness of this issue and discuss strategies to
address the issue with our local leaders.
~ In order for the health unit to increase vegetable and fruit consumption, improve
environments for people to adopt healthy eating practices, and increase access to
healthy foods, we worked with a number of partners to produce a "Eat Fresh! Buy
Local!" guide. On this first effort, 29 producers have chosen to raise their profile. Since
publication, more Elgin producers have expressed interest in participating. This service
is free to the farmer and the map is free to the public. The following sponsois made this
map possible: Elgin Community Futures Development Corporation, Elgin Federation of
Agriculture, Healthy at Heart, Elgin, and the St. Thomas - Elgin Tourist Association.
HEALTH PROTECTION HIGHLIGHTS
The goal of Health Protection programs is to reduce or eliminate infectious diseases.
Infectious diseases represent constant new challenges to public health's role as new
organisms emerge as causes of disease. Surveillance, case finding, contact tracing,
immunization, infection control and risk assessment are all important components in
controlling infectious diseases.
Specific programs are directed at controlling the potential for infectious disease in food and
water. In addition, programs are directed at specific disease control requirements for
tuberculosis, rabies, vaccine preventable diseases, and sexually transmitted diseases
including AIDS. Infection Control defines requirements for assuring that effective infection
control techniques are in place in institutions, day cares and personal service settings.
4
Sexual health programs are directed at decreasing the rate of teenage pregnancy,
increasing access to contraception for those who have need, and increasing the
awareness and knowledge about personal responsibility and life skills required to deal with
sexual relationships.
~ In the past year, the Health Protection staff has been challenged to provide a number
of program and service activities to address situations that pose a threat to the health
of the people of S1. Thomas and Elgin County. These activities include:
. Providing 7800 doses of influenza vaccine to residents of S1. Thomas and Elgin
County at 17 community based clinics held in the fall of 2004;
. Providing active surveillance for evidence of West Nile virus activity in mosquito
larvae, adult mosquitoes, crows and humans that would potentially trigger a need
for larviciding or adulticiding;
. Responding to the first known human case of West Nile Virus illness in Elgin County
in September 2004;
. Initiating a larviciding program in S1. Thomas and Aylmer in July and August 2005;
. Responding to an increase in adverse water reports as a result of evolving
provincial water regulations affecting private well owners and operators of municipal
and small water systems;
. Preparing for the proposed download of responsibility for inspections of small
drinking water systems where the public can access drinking water from a non-
municipal water system;
. Investigating 21 outbreaks of infectious disease affecting hundreds of staff and
residents of long term care facilities, hospitals and child care settings in 2004, and
24 outbreaks to date in 2005;
. Responding to the impact of an outbreak of rubella infection in Oxford County;
. Implementing the new Integrated Public Health Information System (iPH/S) which is
a provincially based computer system for the reporting and management of
reportable communicable diseases and outbreaks;
. Communicating to health care providers the crucial role they play in the prevention
of infectious diseases;
. Ensuring food premise operators as defined under the Food Premise Regulations
are in compliance with accepted public health practices for food handling;
. Investigating an average of 360 animal bite cases, some being high profile in
regards to public attention, each year and issuing rabies post exposure treatment to
an average of 29 people each year;
. Addressing the recommendations directed towards Boards of Health from three
important commissions: The Campbell and Walker Reports that address issues
related to the SARS crisis in 2003, and the Haines Report which addresses issues
related to food safety in Ontario;
. Providing clinical services for 700 individual attending family planning clinics and
680 individuals attending sexually transmitted diseases clinics;
. Launching three new publicly funded vaccines for children in Ontario: varicella
(chickenpox), meningococcal meningitis, and pneumococcal vaccines;
. Immunizing 4100 children and adolescents ages 12,15-19 years of age at 41
scheduled Meningococcal Meningitis immunization clinics;
5
. Monitoring the threat of Avian Influenza outbreaks in Asia to the people of Canada,
and;
. Reviewing the feasibility of continuing to provide Part 8 services under the Ontario
Building Code and initiating a divestment process.
While it has been a year of challenges and learning, we were grateful for the excellent
working relationship we have with community partners such as the 81. Thomas Elgin
General Hospital, long term care facilities, physician practice settings, emergency service
workers, municipal authorities, educators, and other ministry officials.
6
To: Elgin County Council
Re: St. Thomas Elgin General Hospital 2004 -2005 -Highlights
STEGH celebrated 50 years of caring with staff and volunteers
becoming involved in many activities throughout the year in the form of
theme days, contests and a community open house to mention a few. A
six-month lecture series called "The Practice of Medicine Then and
Now" gave the community an opportunity to attend.
STEGH's web site was launched and patients were able to receive
Email. The internal web site was revamped to allow training resources
for employees.
Two specialized patient care units were officially opened and dedication
of the Stuart and Irene Lunn Palliative Care Unit and the Michael and
Irma Koleada Transitional Care Unit was conducted.
The Step Down Unit on second floor next to Intensive Care completes
the fmal phase of the Patient Focused Care Project. The area consists of
a 12 bed cardiac monitored unit. It provides a higher level of
assessment and nursing care than a medical or surgical unit but less
than CICU.
Incontinent Care for an aging population when properly assessed and
treated can be reduced or eliminated and STEGH is part of a
collaborative to determine best treatment practices for incontinence.
Recruitment is always a priority and staff is busy developing a more
formal affiliation with UWO in keeping with the government initiative
to have more family docs. In the past year, two physicians who trained
as residents at STEGH became members of the active staff. The
number of training opportunities at the hospital is expected to increase.
A 16 slice Cat Scan was installed and caused a great deal of excitement
for staff and volunteers. Fundraising throughout the year by a
dedicated group of volunteers continually exceeds the expectations
.........2
of many as this group receives donations for various projects.
Replacing hospital beds was sited as being very important to nursing
staff and the launch of this project will take off in September with a
display setup in the parking lot allowing the public to view this
initiative. Many of the beds on the 4 and 5th floor are 20 years old and
difficult to operate.
A new in-patient food program, called At Your Request-Room Service
Dining" has begun. An impressive menu and changes to the east
entrance and parking will occur this fall and a new retail food court will
be opening in the Atrium.
Upper tier funding continues to be short of the true cost of running
STEGH and staff have worked endless hours working with the
Ministry, recently submitting the Annual Planning Submission for
2005.
I will be attending a 2-day seminar at The Oakwood Inn, Grand Bend,
on Oct. 5 & 6 and the conference theme is "Leadership in Times of
Change". The program will include a special session on: Delivering
Health Care in Southwestern Ontario. A Dialogue with LHlN and
Hospital CEO's.
September 19, 2005
Press Release
COUNTY OF ELGIN
September 2th, 2005
For Immediate Release
19 Years of Persistence Finallv Pays Off!
Central Elgin, Ontario - Elgin County Council learned today that the Government of
Canada will provide $90,780 for improvements to a deadly CN Railway crossing at
Ferguson Line on County Road #48.
As early as December 1986 the County of Elgin made application for the installation of
automatic protective devices at the site. Despite constant pressure and nearly 20 years
of persistence, the County's pleas for safety improvements went unheeded by the
Government of Canada, until today.
Warden Mcintyre praised past and present Councils for their unwavering determination
in addressing the safety hazard on Ferguson Line, despite years of neglect.
Furthermore, "County staff should be commended for preparing the many letters and
making the numerous telephone calls to keep this item at the forefront of the
government's agenda", the Warden remarked. "We would be remiss if we did not thank
our sitting M.P., Mr. Joe Preston for his influence in this matter - he has been active on
this file since he took office," stated Warden Mcintyre.
-30-
For further information, contact the following:
James Mcintyre
Warden,
(519) 631-1460
Mr. Clayton Watters,
Director of Engineering Services
(519) 631-1460 ext. 117
2006:A LOOK AHEAD
. WHAT'S IN STORE FOR THE COMING
YEAR?
MUNICIP ALITIES AND THE
BIG PICTURE
. ONTARIO VERSUS THE REST OF
CANADA(ROC)
. ONTARIO PROPERTY TAX PER
CAPITA IS $1,033 (2004)
. ROC $784
. ONTARIO SOCIAL SERVICES COST
PER CAPITAL IS $412
. ROC IS $13
THE BIG PICTURE
CONTINUED
. ONTARIO HOUSING COSTS IS $116
. ROC IS $19
. ONTARIO HEALTH COSTS $89
. ROC IS $9
. RESULTS: ONTARIO
MUNICIPALITIES FUND INCOME
REDISTRIBUTION PROGRAMS MORE
THAN ROC
"
'"
~
"
0,
u
'*
~,
:W;
1
THE BIG PICTURE CONT'D
~
. AMO SUGGESTS THAT
MUNICIPALITIES IN ONTARIO ARE
SUBSIDIZING THE PROVINCIAL
GOVERNMENT BY MORE THAN
$3BILLION ANNUALLY FOR INCOME
REDISTRIBUTION PROGRAMS
. IF WE SPENT THE SAME PER CAPITA
AS THE ROC MUNICIPAL SPENDING
WOULD DROP BY $3BILLION
'"
TRENDS
w
. UPPER-TIER LEVIES ARE
INCREASING
. THE AVERAGE LEVY INCREASE IN "
EASTERN ONTARIO OVER THE LAST
FOUR YEARS IS 27.6%
. ELGIN COUNTY LEVY INCREASE *
OVER SAME PERIOD IS 29.4%
TRENDS CONTINUED
"
. WEIGHTED ASSESSMENT GROWTH
ONLY 7.3% OVER SAME TIME
. SOME CHANGES IN RESIDENT ,*
PROFILE AT HOMES
. EXAMPLE: SPOUSAL REUNIFICATION
MEANS LOWER LEVEL OF ACUITY- ~
THIS COULD AFFECT CMI AND
THEREFORE REVENUE
~
2
MORE TRENDS
m
. AMBULANCE COSTS RISING -
PROVINCIAL CONTRIBUTION
DECLINING(LESS THAN 28%) '*
. OMERS CONTRIBUTION RATE
INCREASE IN 2006
. REPRESENTS APPROXIMATELY 'k;
$71,000 INCREASE TO COUNTY
. DEVOLUTION WILL COST $$$-AMO
WANTS THIS QUANITIFIED
TRENDS
M
. OMPF GRANT REDUCTION STILL
UNCERTAIN
. THE INFORMATION SUGGESTS A 'M
$3.7M LOSS
. WILL BE CAPPED AT $lM BY 2008
REPRESENTING A 6% COUNTY LEVY \;
INCREASE
. WHAT HAPPENS IN 2009? WILL WE
LOSE THE REMAINING $2.7M?
TRENDS CONTINUED
M
. A $3.7M LOSS EQUATES TO A
COUNTY LEVY INCREASE OF 20.5%
. MINISTER GERRETSON HAS STATED %;
THAT THE PROGRAM MAY BE
"TWEAKED" BUT THERE ARE NO
PLANS TO CHANGE IT k;
3
UNCERTAINTY
m
. THE IMP ACT OF LOCAL HEALTH
INTEGRATION NETWORKS (LHIN'S)
. WSIB AND MODIFIED WORK CLAIMS iO.
CAN VARY FROM YEAR TO YEAR
. CMI IS DETERMINED BY ACUITY OF
RESIDENTS ENTERING HOME '%
. PROVINCIAL GRANT FOR LIBRARIES
MAY CHANGE IN 2006
IMP ACTS
m
. SIGNIFICANT GRANT LOSS
EXPECTED - UNCLEAR WHAT
HAPPENS AFTER 2008 "
. GROWING DISPARITY IN
PROVINCIAL FUNDING
(AMBULANCE) %
MORE IMP ACTS
.m
. TAX BASE IS STRETCHED -
WEIGHTED ASSESSMENT GROWTH
NOT KEEPING PACE WITH COST OF "
SERVICES
. INFRASTRUCTURE DEFICIT
GROWING (ROADS) '%
4
IMP ACTS CONTINUED
'm
. STARTING POINT FOR 2006 BUDGET
CANNOT BE 0%
. ENERGY COSTS GOING UP
. OMERS CONTRIBUTIONS RISING
. NEED TO PLAN NOW FOR LOSS OF
CRF (OMPF)
. PROVINCIAL CONTRIBUTION
DECLINING ON A PERCENTAGE
BASIS
'"
THE GOOD NEWS
w
. WHAT HAS ELGIN COUNTY COUNCIL
DONE TO MITIGATE THE FORECAST?
l!
ACCOMPLISHMENTS
'"
. RESTRUCTURED HOMES WITH
THREE DEDICATED DIRECTORS
. RESULTED IN 2005 EXPENDITURE '"
DECREASE OF $332,000 OVER 2004
. FOCUSED EFFORT ON
DOCUMENTATION AT HOMES LEAD ~
TO HIGHER CMI ($141,000 IN NEW
REVENUE)
'%
'Ii
5
PROGRESS CONTINUED
.%
. MOVING TOWARD 60/40 PREFERRED
ACCOMMODATION MODEL AT
HOMES MEANS IDGHER REVENUE '"
. RECORDED A SURPLUS IN 2004
($600,000) WIDCH WAS USED TO
FUND WSIB AND OTHER %
COMMITMENTS
. RESERVES HAVE BEEN DRAWN
DOWN BY MORE THAN $lM
ACCOMPLISHMENTS
,.
. ONE POA POSITION NOW FUNDED BY
FEDERAL GOVERNMENT
. ACTIVELY PURSUING OUTSTANDING ,.
POA FINES THROUGH CERTIFICATES
OF DEFAULT AND SPECIAL
COLLECTIONS it
. NEGOTIATED $10,000 "ROYALTY"
FROM AIM POWER GENERATION
ACCOMPLISHMENTS
CONTINUED
.%
. ADMINISTRATION BUILDING NEAR
FULL CAPACITY (TENANTS)
. MAXIMIZING GRANTS WHERE
POSSIBLE (PATIENT LIFTS/LATE
CAREER NURSING
INITIA TIVE/DIAGNOSTIC MEDICAL
EQUIPMENT/SCTP FOR
MUSEUMlPROJECT ARCHIVIST/CAP
SITES ETC.
'"
%
6
PROGRESS CONTINUED
m
. RESTRUCTURING OF HUMAN
RESOURCES DEPARTMENT
THROUGH ATTRITION .'0.
. APPROVED "MANAGEMENT"
POSITION AT TERRACE LODGE NOT
F~LED .~
. MOVED BACK TO MUSEUM TO SAVE
ON RENT AND UT~ITIES WH~E
AWAITING SCTP GRANT($400,000)
STILL MORE
.
. CROSS BORDER B~LINGS RESOLVED
WITH MIDDLESEX (NEARLY $300,000
COLLECTED) ~.
Q
THE PLAN
"
. DEPARTMENTS TO COMMENCE
BUDGET DISCUSSIONS IN OCTOBER
. A MEETING WITH MINISTRY OF *
FINANCE BEING ARRANGED BY
WARDEN TO ANSWER OMPF
QUESTIONS ~
. DEPARTMENTS REVIEWING FEE
SCHEDULES, SERVICE LEVELS AND
OPERATIONS
7
THE PLAN CONTINUED
.
. CAO PARTICIPATING ON AMO
COMMITTEE ON OMPF
. DIRECTOR OF FINANCIAL SERVICES )};
DEVELOPING A FINANCIAL PLAN TO
ADDRESSOMPFSHORTFALL
. MANAGEMENT TEAM RESEARCHING %
OTHER OPTIONS TO MITIGATE LOSS
CONCLUSION
"
. THERE IS AN OBVIOUS AND
DISTURBING TREND TO DOWNLOAD
SERVICES, STANDARDS AND
ACCOUNTABILITY TO
MUNICIPALITIES WITHOUT
COMMENSURATE COMPENSATION
. THE MUNICIPAL TAX LEVY WILL
INCREASE BY NECESSITY!
.~
%
8
REPORT TO COUNTY COUNCIL
FROM:
Sonia Beavers, Purchasing Co-Ordinator
DATE:
September 16, 2005
SUBJECT:
Donation Form, Policy and Procedure
INTRODUCTION:
The Corporation of the County of Elgin is a recipient of generous donations from the public. There have
been instances in the past where a donation was made to the Corporation and when the item(s) was no
longer of any use to the Corporation, the donor had requested that the item(s) be returned to the donor for
resale.
DISCUSSION/CONCLUSION:
To eliminate confusion as to who actual owns the donated item(s), a form (see attached) was developed
that all donors will complete prior to the Corporation accepting the gift(s). At the same time the Corporation
needs to ensure that the item(s) being donated is actually owned by the donor and free from any
encumbrances.
When the donor signs the form they are agreeing to release all rights, title and interest to the Corporation
and therefore giving ownership to the Corporation to retain, alter or dispose of the item in any manner as
the Corporation of the County of Elgin, at its sole discretion, may deem to be in the best interest of the
Corporation.
In addition, there needs to be consistency in whether the County gets involved in obtaining quotes for new
equipment that will be donated to the Corporation, i.e. photocopiers, mattresses. If the County is part of the
process in acquiring the quotation for the donated goods or services, the County can ensure that the item
being purchased meets the needs of the organization and that the purchase of the item does not cause
further financial implications to the organization. Furthermore, with the County's buying power, the County
may be able to obtain a lower price for the donor, which may increase the number of items that could be
donated.
To protect the rights of the Corporation, as well as ensuring the item(s) being donated meet the needs of
the organization and to eliminate any confusion as to who is the rightful owner of the donated item(s), the
recommendation would be for Council to consider adopting the attached Donation Form, Policy and
Procedure.
This report and policy has been reviewed and approved by the County Solicitor.
RECOMMENDATION:
THAT, the attached Donation Form, Policy and Procedure be implemented.
Respectfully Submitted
~, " < &.{'1 </(v
. Sonia Beavers
Purchasing Co-Ordinator
Approved for Submission
LfnL~
Director, F:' a ervices
Financial Services - Purchasing
Policy # 2005- 02
Date: June 1, 2005
Policy: Donated Goods and Services
Purpose: The purpose of this policy is:
~ To determine ownership of donated item(s)
~ To confirm in writing that the item(s) being donated to the Corporation
of the County of Elgin is actually owned by the donor and free from any
encumbrances
~ To identify future financial obligations (Le. maintenance contract)
~ To ensure all donated goods are recorded in the inventory records.
Procedure:
Prior to accepting donations, the "Donation Form" is completed. Financial Services will
review suitability of documentation, including verification of fair market value appraisal
reference from a competent and qualified evaluator. These steps should be completed
within 10 working days.
Council approval is required for instances where the gift involves future financial
obligations. Future financial obligations also refer to situations where a condition of the
donation is that the County must purchase related goods or services from the company
making the donation; Le. maintenance contract or a piece of related equipment.
Value of Donated Goods and Services
(a) All donations of goods and services shall be valued at the "fair market value".
(b) "Fair Market Value" means the value assigned in an appraisal conducted by a
competent and qualified evaluator.
Issuance of Tax Receipts for Donated Goods and Services
(a) As a Crown agent, the County may issue a tax receipt as the Crown in right of
Ontario.
(b) The County shall not issue a receipt as the Crown in right of Ontario unless:
i) the donation is completely voluntary and gratuitous and no right, privilege,
material benefit or advantage may accrue to the donor or to the person
designated by him or her; and
ii) the donation is a gift and it's fair market value has been determined by an
independent and qualified appraiser; and/or
iii) requested by the donor.
1
Financial Services - Purchasing
Policy # 2005- 02
Date: June 1, 2005
Policy: Donated Goods and Services
(c) Every tax receipt must comply with all relevant Income Tax Regulations and
Information Bulletins. Revenue Canada is the final arbiter in the allowance of
claims for income tax purposes.
(d) Every official receipt for a donation to the Crown in right of Ontario shall comply
with Section 118 (1) D of the Income Tax Act.
2
Donation Form
DONOR INFORMATION (please print)
Name
.Contact
Address:
Cityrrown:
Province
Postal Code:
Phone No.(
Fax No. (
Tax Receipt Yes
No
Donated in Memory of:
DESCRIPTION OF DONATED ITEM(s)
Indicate below the complete description of the item(s) being donated. If there is not enough space, attach a copy of description
(this should include but not limited to, manufacturer, model numbers, serial numbers, age, manuals, spare parts list, warranties,
list of all approvals(CSA, hydro, etc.) etc.
INFORMATION ON DONATED ITEM(s)
Indicate below the total impact on the County.(if there is not enough space, attach a copy of the information)! this should include
but not limited to, the financial implications such as delivery, maintenance, staffing, servicing, physical space and/or
alterations, consultants, additional equipment required, life expectancy, etc. Descriptive information such as manufacturer,
model numbers, age, manual, spare parts list, warranties, list of all approvals, (CSA, Hydro, etc) etc. Department(s) benefits,
can it be used by multiple departments)]
Related Goods and/or Service that must be purchased from Donor
(describe any of these goods and/or services and the estimated value. (if there is not enough space attach a copy of the
explanation) .
3
REPORT TO COUNTY COUNCIL
FROM:
Linda B. Veger, Director of Financial Services
DATE:
September 14, 2005
SUBJECT:
Budget Comparison - August 31,2005
Introduction:
Attached is the budget comparison to August 31,2005 for the County operating departments.
Discussion:
Warden and Council- positive variance - 31,479 - timing of payrolls. Convention expenditures are
under budget as well as the warden's banquet budget line will not be expended until later in the
year.
Overall the three Homes are in a positive position. Revenues are coming in line with the increases
as reported to Council earlier. With vacation season nearing an end, wage lines are coming closer
to budgeted amounts.
Museum - positive variance 15,914 - wages are over budget by (13,350). A report was presented
and approved by Council that some of the wage line in Archives would be utilized by the Museum.
Overall, this does not affect the bottom line. Archives currently has a positive variance in wages of
$10,163.
Library - positive variance - 44,678 - the total provincial grant for 2005 has been received in July
-116,739.
Ambulance Services - positive variance 115,786 - Elgin County received a grant in the amount of
41,822 to upgrade and enhance medical diagnostic and treatment equipment. This shows in the
budget comparison as a positive variance in the Province of Ontario line and a negative variance in
the operations line.
The WSIB reserve has been reviewed and should have a small positive variance at year end.
All other departments are reasonable.
Recommendation:
THAT the report titled Budget Comparison - August 31, 2005 and dated September 14, 2005 be
received and filed.
Respectfully Submitted
Mark . Id
Chief Administrative Officer
~
Linda B. Veger
Director of Financial Services
COUNTY OF ELGIN
Departmental Budget
Comparisons
For The 8 Periods Ending August 31, 2005
Total YTD YTD Variance %OF
Budget Budget Actual () Budget
Warden & Council
Wages 168,274 112,183 98,156 14,027
Benefits 7,573 5,049 4,273 776
Operations 70,175 49,667 32,990 16,677
Total 246,022 166,898 135,419 31,479 55.04%
Administrative Services
Wages 249,750 166,500 163,755 2,745
Benefits 52,448 34,965 35,899 (934)
Operations 14,700 9,800 8,303 1 ,497
Total 316,898 211,265 207,957 3,308 65.62%
Financial Services
Wages 281,000 187,333 185,179 2,154
Benefits 67,440 44,960 45,168 (208)
Operations 17,151 11 ,434 7,851 3,583
Total 365,591 243,727 238,199 5,529 65.15%
Human Resources
Wages 322,279 214,853 202,492 12,361
Benefits 68,000 45,333 46,076 (742)
Operations 19,550 13,033 5,293 7,740
Total 409,829 273,219 253,861 19,358 61.94%
Administration Building
Wages 116,600 77,733 76,438 1,295
Benefits 30,300 20,200 18,890 1,310
Operations 74,300 49,534 27,636 21,897
Total 221,200 147,467 122,965 24,502 55.59%
Corporate Expenditures
Insurance 206,500 202,838 196,502 6,336
Telephone 33,000 22,000 14,526 7,474
Legal & Professional 87,000 58,000 62,722 (4,722)
Retiree Benefits 41,000 27,333 26,179 1,154
Other Expenditures 76,515 51,010 30,497 20,513
Total 444,015 361,181 330,426 30,756 74.42%
Engineering
Wages 245,000 163,333 161,434 1,899
Benefits 53,000 35,333 37,047 (1,713)
Operations 82,000 54,667 50,084 4,583
Maintenance 2,276,259 1,155,630 1,150,380 5,250
Total 2,656,259 1 ,408,964 1,398,945 10,018 52.67%
Agriculture
Operations 31 ,876 21,251 16,408 4,843
Total 31,876 21,251 16,408 4,843 51.47%
Elgin Manor
Revenues (4, 169,961) (2,779,974) (2,824,644 ) 44,670
Wages 3,823,594 2,549,063 2,466,760 82,302
Benefits 1,005,216 670,144 669,137 1,007
Operations 911,144 607,430 450,985 156,444
Total 1,569,993 1,046,662 762,239 284,424 48.55%
Terrace Lodge
Revenues (4,627,251) (3,084,834) (3,117,745) 32,911
Wages 3,928,883 2,619,255 2,613,669 5,587
Benefits 993,613 662,409 699,527 (37,118)
Operations 917,741 611,828 508,861 102,967
Total 1,212,986 808,658 704,311 104,347 58.06%
Bobier Villa
Revenues (2,650,555) (1,767,037) (1,796,428) 29,391
Wages 2,611,848 1,741,232 1,787,890 (46,658)
Benefits 608,993 405,995 422,836 (16,841 )
Operations 653,058 435,372 342,107 93,265
Total 1,223,344 815,563 756,405 59,157 61.83%
Pioneer Museum
Wages 56,553 37,702 51,052 (13,350)
Benefits 11,672 7,781 10,476 (2,694 )
Operations 57,249 38,166 6,208 31,958
Total 125,474 83,649 67,736 15,914 53.98%
Library
Wages 1,028,272 685,515 676,173 9,342
Benefits 227,986 151,991 162,374 (10,383)
Collections 227,500 151,667 163,112 (11,445)
Operations 106,856 71,237 14,073 57,165
Total 1,590,614 1,060,409 1,015,731 44,678 63.86%
Archives
Wages 135,568 90,379 80,216 10,163
Benefits 27,606 18,404 16,625 1,779
Operations 45,900 30,600 33,933 (3,333J
Total 209,074 139,383 130,775 8,60 62.55%
Land Division
Wages 54,345 36,230 34,605 1,625
Benefits 10,925 7,283 6,400 883
Operations (65,270J (43,513J ~67,636~ 24,123
Total 26,631 26,631 0.00%
Emergency Measures
Wages 5,000 3,333 3,333 0
Benefits 1,300 867 867 0
Operations 11,800 7,867 3,029 4,838
Total 18,100 12,067 7,229 4,838 39.94%
Information Technologies
Wages 184,622 123,081 120,710 2,372
Benefits 48,002 32,001 27,535 4,467
Operations 318,862 212,575 180,806 31,769
Total 551,486 367,657 329,050 38,607 59.67%
Provincial Offences
Grant (75,900) (50,600) (41,303) (9,297)
Fines Revenues (650,000) (433,333) (450,925) 17,591
Shared Revenues - Municipal 323,355 161,677 127,093 34,584
Wages 159,000 106,000 99,277 6,723
Benefits 33,500 22,333 23,648 (1,315)
Operations 180,350 120,233 76,590 43,643
Total (29,695) (73,690) (165,618) 91,928 557.73%
Ambulance Services
Province of Ontario (1,658,846) (1,105,897) (1,153,427) 47,530
City of S1. Thomas (1,752,254) (1,168,169) (1,102,654) (65,515)
Contractor Payments 5,828,740 3,885,827 3,716,082 169,745
Wages 63,650 42,433 42,346 88
Benefits 16,549 11,033 9,916 1,117
Operations 32,500 21,667 58,844 (37,178J
Total 2,530,339 1,686,893 1,571,107 115,78 62.09%
Collections
Revenue (380,000) (253,333) (250,991 ) (2,342)
Shared Revenues - Municipal 214,069 142,713 126,844 15,869
Wages 42,259 28,173 27,579 593
Benefits 10,565 7,043 7,313 (270)
Operations 7,600 5,067 26,065 (20,998)
Total (105,507) (70,338) (63,190) (7,148) 59.89%
REPORT TO MANAGEMENT
FROM:
Linda B. Veger, Director of Financial Services
DATE:
September 13, 2005
SUBJECT: Ambulance Bases Update - August 29, 2005
INTRODUCTION:
The Shaw Valley ambulance sub-station is nearing completion. Attached to this report is a
spreadsheet that outlines the expenditures to date and approved change orders for both
stations.
DISCUSSION/CONCLUSION:
The Edward Street base approved and completed change orders totalled $75,053.47
bringing the total cost of that station to $973,842.47. This amount has been paid in full to
Aveiro Constructors Limited.
The Shaw Valley sub-station approved change orders total $28,892.45 to date bringing the
total of that project to $424,892.45. Barring any unforeseen difficulty, the combined project
should be finalized with a positive variance of approximately $225,000 to $250,000.
Expenditures to dated are listed on page 3 for your information.
RECOMMENDATION:
THAT the report titled Ambulance Bases Update - August 29, 2005 and dated September
13, 2005 be received and filed.
Respectfully Submitted
Approved for
~~
Director of Financial Services
MarK. aid
Chief Administrative Officer
Page 1
COUNTY OF ELGIN
Ambulance Base Approved Budget
As at Aug 29/05
Variance to
Original Budget Expenses to Date Approved Budget
Land Purchases Edward Street 105,000.00 109,846.20 (4,846.20)
Shaw Valley Site 185,000.00 167,459.95 17,540.05
GeoTechnical Engineers Atkinson, Davis 4,960.00 4,961.51 (1.51 )
Engineering Work SPH Engineers 19,200.00 20,674.13 (1,474.13)
Advertising 989.00 856.06 132.94
Thames Admin Fee 1.5% of Total Maximum 25,000.00 25,000.00
Severance Fee City of St. Thomas 600.00 600.00
Approved Design Construction Aveiro Constructors Ltd 1,294,789.00 1,218,346.81 76,442.19
Contingency 364,462.00 44,948.30 319,513.70
$ 2,000,000.00 $ 1,567,692.96 $ 432,307.04
Aveiro Constructors Limited - Change orders
From Current
Item Change Order # Dollar Value Landscape Allowance
Base Contract - Edward EMS 898,789.00
Additional Floor Area 1 33,490.00
Additional Lockers 2 2,050.00
Provide Canopy 3 6,150.00
Provide Electrical 4RevComp 7,771.50
Disconnect Generator 5 5,421.90
Sanitary Site Service 6Comp 14,850.00
Cr for Development fees 7Comp (9,558.40)
Additional Plumbing 8Comp 5,625.77
Additional Plumbing 9 1,507.00
Additional Electrical 10 5,753.00
Slab for Garage Enclosure 11 RevComp 2,869.35
Additional Curbs 12Comp 4,386.25
Water for Fire Prevention 13Comp 3,520.00
Cr for Unican Push Button 14Comp (4,200.00)
Add interior Window 15 1,210.00
Add Lockers Rm 101 16 1,212.20
Concrete Slab 19 1,772.49
Place Washed Gabion Stone 20 2,167.00
Move Lockers 30 N/C
Additional Equipment for Winter 31 872.83
Labour - Masonry painting 32 220.00
Privacy Fence 33 490.60
Garbage Bin Enclosure 34 914.38
Transformer & electrical 37 1,557.60
Credit unused portion of landscape (9,655.53) 9,655.53
$ 75,053.47 $ 75,053.47 $ 15,000.00
Total Construction Costs - Ed St $ 973,842.47 $ 15,000.00
Aveiro Constructors Limited - Change orders
Base Contract - Shawside
Workstation #2 changes
Clean Room Cabinetry & Receptacl
Patio & Privacy Fence
Curbs/Sidewalk on Right of Way
Delete Allowance for Development
200 amp service to PropertyLine
Install Roll over Curb
FOB card lock Entry units
Install 200 amp Combo Gen Panel
Total Construction Costs - Shawside
Total Base Contracts + Change Orders:
1
2
3
6
06R1
7
9
10
294.80
1,474.00
1,093.40
5,060.00
(4,685.00)
14,668.02
5,461.50
4,278.12
1,247.60
28,892.45
$
396,000.00
28,892.45
424,892.45
1,398,734.92
Page 2
Atkinson, Davies Inc.
Aveiro Construction
Hennessey Bowsher
SPH Engineering Inc.
The London Free Press
Royal Lepage Triland Realty
City of St. Thomas
Ontario Water Products
Milcreek Plumbing
Nicholson Service Station
Ken Jones Signs
Littlewood Landscaping
Union Gas - Edward St
St Thomas Energy
RMB Communications
Streib Trucking
St. Thomas Times-Journal
Edward Street
Hennessey Bowsher
Shawside Developments
Elgin St. Thomas EMS
Gencare
BP Fire Equipment
RA Barnes Electrical
Yarmouth Crane
COUNTY OF ELGIN
Ambulance Base Development
As at Aug 29/05
Geotechnical Engineers
Legal fees for Edward St Purchase
Design Engineers
Tender Advertisement
Retainer
Permits
Fire Hydrant
Edward Street Sign
Utility Costs
Hydro Costs
Tender Advertisement
Purchased via Hennessey Bowsher
In Trust for Land Purchase
Shawside Land Purchased
Rezoning Permit
Generator Servicing
Fire Extinquishers
Electrical Adjustments
Page 3
Costs per Vendor
4,961.51
1,218,346.81
925.20
20,674.13
701.56
1,000.00
4,100.00
1,470.75
2,065.00
2,516.10
4,590.90
4,866.25
3,562.59
1,119.60
10,283.17
8,502.00
154.50
97,921.00
10,000.00
167,459.95
600.00
875.50
477.74
65.50
453.20
$ 1,567,692.96
REPORT TO COUNTY COUNCIL
FROM:
Jennifer Ford, Financial Analyst
Linda Veger, Director of Financial Services
Clayton Watters, Director of Engineering Services
DATE:
20 September 2005
SUBJECT:
Capital Projects Budget as at August 31,2005
INTRODUCTION:
The County of Elgin maintains a capital budget each year which consists of projects that
are ongoing from year to year, projects that have been carried forward from prior years
and projects from the current year. Presently, this capital budget stands at $14,369,579
worth of projects that have been approved by Council. The remaining projected budget
on these projects currently stands at $5,577,922. The purpose of this report is to update
Council on the status of the capital projects budget at August 31, 2005.
Schedule A includes a summary of the Projects as they appeared on August 31,2005.
Schedule B is an outline as to the status of the projects as at August 31, 2005.
DISCUSSION:
The projects are broken down into three categories and are classified by their
anticipated completion dates.
The first category includes projects and improvements that historically require annual
funding in the capital budget. These projects remain in the capital budget each year and
funding is utilized as necessary for repairs and maintenance to these items. The
remaining budget for these projects is $1,171,800.
Projects scheduled for completion in 2005 is the second category. These items are
either currently completed with a remaining budget or are anticipated to be completed by
late 2005. The remaining budget for these projects is $3,014,149 of the outstanding
uncompleted projects. More than half of this number is a result of three main projects
which the County is now in the process of completing. These three projects are Road 7
reconstruction, Plank Road reconstruction and Avon Road reconstruction.
Two projects were not anticipated in the 2005 capital budget and have outstanding
balances that are to be found through efficiencies. These two projects are Belmont
Road Stabilization with an anticipated cost of $300,000. and Bobier Villa Drainage which
is complete at a final cost of $15,750.
Capital Projects Budget as at August 31,2005 continued
The final category includes projects that are not expected to be finished in this fi scal year
however it can be noted that preliminary work has begun on some of these projects.
The remaining budget for these items is $1,391,973.
CONCLUSION:
In 2005, Council approved the capital projects budget to proceed with a projected
working shortfall of $601 ,658. In July 2005, it was recommended and approved by
Council that $189,339 from the 2004 operating surplus be allocated to help fund this
difference. Therefore, there is $412,319 left of the original shortfall to find through
efficiencies. Project 9000-01 "Carryover from closed Projects" encompasses the
carryforward surplus from the 2004 capital budget year. It is suggested by staff that this
$303,464 be applied towards the working shortfall of $412,319 thus leaving a balance of
$108,855 left to find through efficiencies on this original shortfall.
It is anticipated that the projects that are completed as well as projects expected to be
completed will contain enough surplus at year end to fund the remaining working
shortfall as well as the two unanticipated projects that were added this fiscal year.
Another report will be brought forth to Council in early November to keep Council
updated as to the progress of the current projects and budget.
RECOMMENDATION:
THAT the project known as 9000-01 "Carryover from Closed Projects" $303,464 be
closed and used to fund the 2005 capital budget working shortfall; and,
THAT the report titled "Capital Projects Budget as at August 31,2005" and dated
September 20,2005 be received and filed.
)
Jenn' er Ford
Financial Analyst
Mark .
Chief Administrative Officer
~
Lin~
DireC(jJ~ Services
Clayton Watters
Director of Engineering Services
Schedule A
Contract
Ongoing Projects and Improvements
2660-01-18 Tennant Improvements
2660-05-05 Office Improvements - Admin
2660-05-01 Garage
2660-05-03 Heat Pump Replacements - Admin
2660-05-04 Misc Professional Services - Admin
2800-01 Ambulance Replacement
2800-04-02 Ambulance Equipment
2840-01 Vehicle Replacement
5800-03-02 Library Accessibility
6000-01 Bridge Replacement
6090-03-03 Misc Capital Projects
6210-01 Land Purchase
6300-01 Municipal Drains
9000-01 Carryover from Closed Projects
Subtotal:
Projects Scheduled for Completion in 2005
2660-03-01 Building Assessment Study Mech/Elec/Arc~
2660-03-03 Carpeting 2nd Floor
2660-03-05 Install New Cooling System for IT Room
2660-03-06 Paint Exterior of Building/Railings/LampostE
2660-03-09 Engineering - Generator Project
2660-04-02 Carpeting 3rd Floor - Admin
2660-05-07 Telelphone System - Admin
2660-05-08 Accessibility Upgrades - Admin
2830-04-01 Emergency Response Vehicle
5700-04 IT - Special Projects
5780-05 IT - Hardware
5800-02-03 Port Stanley Library - Storage, Paint, Carpe
5800-04-01 Belmont Library Renovations
5910-05-01 Door and Wall Protection - EM
5910-05-02 Interior Painting Doors & Halls - EM
5910-05-03 Nurse Call Upgrade - EM
5910-05-04 Resident Security Improvements - EM
5920-02-04 Lounge Furniture Replacement - TL
5920-03-09 Terrace Lodge Renovations
5920-04-01 Door and Wall Protection - TL
5920-04-04 Move and Add Electrical Outlets - TL
5920-05-08 Misc Professional Fees - TL
5920-05-09 Paint Interior of Building - TL
5930-03-01 DoorlWall Protection - BV
5930-03-04 Landscaping - BV
5930-03-05 Paint Interior of Building - Rooms BV
5930-04-01 Cover over outside stairs and Patio - BV
5930-04-03 Replacement Flooring Front Area - BV
5930-05-01 Blinds in Resident Rooms - BV
County of Elgin
Capital Projects
as at August 31/05
Current Projects Actual Costs Remaining
Estimate to Date Projected Budget
400,000
25,000
20,000
25,000
15,000
362,077
44,070
42,600
100,000
353,504
150,000
380,000
733,000
303,465
2,953,716
-349,428
o
-11,430
-14,904
-4,025
-187,485
-18,433
-22,267
-42,153
-109,445
-138,884
-281,135
-602,326
o
-1,781,915
50,572
25,000
8,570
10,096
10,975
174,592
25,637
20,333
57,847
244,059
11,116
98,865
130,674
303,465
1,171,801
20,000
12,000
58,000
20,000
15,000
10,000
16,000
50,000
55,000
210,000
57,348
39,450
22,000
10,000
20,000
60,000
15,000
21,600
615,254
23,100
18,000
15,000
20,000
30,000
.10,000
30,000
40,000
40,000
20,000
-19,490
-8,316
-57,591
o
-12,267
o
o
o
-35,217
-144,297
-13,684
-34,483
-22,240
o
o
o
o
-11,675
-553,471
-7,164
-19,680
-13,500
o
-14,606
-8,454
-10,793
-12,899
-40,953
-11,441
510
3,684
409
20,000
2,733
10,000
16,000
50,000
19,784
65,703
43,664
4,967
-240
10,000
20,000
60,000
15,000
9,925
61,783
15,936
-1,680
1,500
20,000
15,394
1,546
19,207
27,101
-953
8,559
Schedule A Continued
Current Projects Actual Costs Remaining
Contract Estimate to Date Projected Budget
5930-05-02 Commercial Washer and Dryer - BV 45,000 -426 44,574
5930-05-03 Bobier Villa Drainage 0 -15,750 -15,750
5930-05-04 Misc Professional Fees - BV 15,000 0 15,000
5930-05-06 Rehabilitate Laundry Room - BV 30,000 -8,073 21,927
6090-04-02 Rail Road Crossing Improvements (PSTR - 35,000 -13,133 21,867
6090-04-03 Miscellaneous Engineering Sel;Vices (Rd 14 80,000 -30,698 49,302
6090-05-01 Road Crack Sealing and Asphalt Patching 250,000 -212,173 37,827
6090-05-02 Road 4 Survey and Design 20,000 -15,403 4,597
6200-03-01 Road 7 Construction 1,600,000 -644,533 955,467
6200-04-02 Plank Road Slope Stablization (South of GIt 650,000 -138,402 511,598
6200-04-04 Traffic Signals - Wellington Road at Ron Me 110,000 -106,799 3,201
6290-04-02 Vienna North Bridge Deck Replacement 1,200,000 -1,120,766 79,234
6010-02 Town of Aylmer 170,142 -158,520 11,622
6200-03-02 Road 74 Rehab (Belmont) 825,000 -709,062 115,938
6200-05-01 Avon Road Reconstruction 580,000 -252,042 327,958
6200-06-01 Belmont Road Slope Stabilization 0 -27,751 -27,751
6220-05-01 Road 52 Resurfacing 430,000 -345,594 84,406
6220-05-02 Road 40 Resurfacing 360,000 -229,347 130,653
6220-05-03 Putnam Road Hot Mix Ashpalt 425,000 -340,727 84,273
6250-05-01 Road 45 Thin Cold Mix (73 to 40) 70,000 -66,858 3,142
6250-05-02 Road 48 Thin Cold Mix (Townline to 25) 50,000 -50,927 -927
6250-05-03 Road 48 Thin Cold Mix (25 to 74) 170,000 -170,855 -855
6250-05-04 Road 20 Thin Cold Mix (Smith to Fingal) 100,000 -83,994 16,006
6250-05-05 Road 22 Thin Cold Mix (24 to 27) 55,000 -41,006 13,994
6250-05-06 Road 36 Thin Cold Mix (24 to Sparta) 50,000 -37,944 12,056
6250-05-07 Road 14 Thin Cold Mix (13 to Thames Rive 100,000 -75,663 24,337
6250-05-08 Road 5 Thin Cold Mix (2 to 401) 17,000 -13,578 3,422
6250-05-09 Road 20 Thin Cold Mix (401 NPL to 18) 8,000 -9,140 -1,140
6260-05-01 Road Sign Replacements 40,000 -13,341 26,659
6290-04-05 King George Lift Bridge - Electrical Compon 490,000 -547,305 -57,305
6290-05-01 New Sarum Bridge 25,000 -26,715 -1,715
Subtotal: 9,572,894 -6,558,745 3,014,149
Projects Scheduled for completion in 2006 or later
2790-01 Museum Improvements - Superbuild 288,500 -73,472 215,028
2790-02-01 Misc Emergency Repairs - Museum 4,000 -1 ,739 2,261
2790-02-02 Renovations to Agrucultural Bldg 30,000 -4,109 25,891
2790-03-01 Museum Exterior Painting 2,000 0 2,000
5920-04-06 Magnetic Locks - TL 15,000 0 15,000
5920-05-01 Air Handling Units - TL 200,000 0 200,000
5920-05-02 Dining Lounge for Secured Residents - TL 230,000 -25,087 204,913
5920-05-05 Garbage Compactor - TL 30,000 0 30,000
5920-05-06 Lighting in Visitor Parking - TL 40,000 0 40,000
5920-05-10 Replace Flat Roof at Wings - TL 40,000 0 40,000
5920-05-13 Resident Security Improvements - TL 40,000 0 40,000
5920-05-14 Ventilation in Tub Rooms - TL 15,000 0 15,000
6020-02 Waterlines 358,470 -236,312 122,158
6200-03-03 Road 42 Relocation 550,000 -110,278 439,722
Subtotal: 1,842,970 -450,997 1,391,973
Total Projects: 14,369,580 -8,791,658 5,577,922
Schedule B
August 31, 2005
Qngoing Projects and Improvements
Project Name
Project Number
Project Estimate
Remaining Project Cost
Office Improvements
2660-01-18
2660-05-05
$425,000
$75,572
At the time of budget deliberations staff is not aware of new tenants that may require
renovations. One new office space, 600 square feet, is presently being renovated for a
new tenant. For your information renovations usually cost $40 per square foot.
County Garage Facility
2660-05-01
$20,000
$8,570
Repairs as per agreement with Central Elgin.
Heat Pump Replacements Admin
2660-05-03
$25,000
$10,096
Replace units as required.
Miscellaneous Professional Services Admin 2660-05-04
$15,000
$10,975
Project will be initiated in fall.
Ambulance Replacements
2800-01
$362,077
$174,592
The schedule for vehicle replacement is every 54 months or 4.5 years. No vehicles were
replaced in 2004 therefore 2 will be replaced in 2005. Since the vehicles are replaced on
a rotation of 54 months it is logical to allocate funds annually to fund these
replacements.
Ambulance Equipment
2800-04-02
$44/070
$25/637
The repair and maintenance of stretchers/ defibrillators and other major ambulance
equipment.
Vehicle Replacement
2840-01
$42/600
$20/333
Engineering and Library Services each have a vehicle for their use. Engineering and
Library Services replace a vehicle every 3 years. Monies are allocated yearly to this
account so that the purchase price can be spread out for a number of years.
Library Accessibility
5800-03-02
$100/000
$57/847
Projects will be completed when renovating libraries.
Bridge Replacement
6000-01
$353/504
$244/059
Council has endorsed allocating $200/000 per year for bridge replacements. Bridge
replacements are now costing the County an average of $1/000/000 per structure for
engineering and construction. This fund stabilizes the capital budget for bridge
replacements.
Miscellaneous Capital Budget
6090-03-03
$150/000
$11/116
These are projects that staff is not aware of during budget deliberations. Council has
established this fund as part of the Capital Projects Communications Protocol. Its
purpose is to address ongoing maintenance issues by completing minor capital
improvements upon requests of the municipality and approval by County staff. In these
types of projects the costs are shared between the County and municipality. Costs for
these projects are less than $10/000 each.
Land Purchase
6210-01
$380,000
$98,865
Land is often purchased through the severance application process and construction
projects. At budget deliberations staff are not aware of the number of purchases
throughout the year.
Municipal Drains
6300-01
$733,000
$130,674
These are projects that staff is not aware of during budget deliberations. The drains are
initiated by the landowners and are completed by the local drainage superintendents.
County annually spends $130,000.
frQ,jects schedule for completion in 2005
Building Assessment Study - Admin
2660-03-01
$20,000
$510
Project is complete.
Carpeting Second Floor - Admin
2660-03-03
$12,000
$3,684
Project is complete.
Install new cooling system - Admin IT Room 2660-03-05
$58,000
$409
Project is complete.
Paint Exterior of Building - Admin
2660-03-06
$20,000
$20,000
Contractor will complete the project in fall of 2005.
Engineering Generator - Admin
2660-03-09
$15,000
$2,733
Engineering is 75% complete but further analysis is required for alternatives.
Carpeting third floor - Admin
2660-04-02
$10,000
$10,000
Project is complete, payment was used through account 2660-03-03.
Telephone System - Admin
2660-05-07
$16,000
$16,000
IT and Purchasing Co-Ordinater is reviewing options for new system. Project will be
completed in fall of 2005.
Accessibility Upgrades
2660-05-08
$50,000
$50,000
Upgrading signage in Administration Building in fall of 2005.
Emergency Response Vehicle
2830-04-01
$55,000
$19,784
ERV purchased in 2004, therefore the project is complete.
IT special Projects
5700-04
$210,000
$65,703
Project is 90% complete.
IT - Hardware
5780-05
$57,348
$43,664
Replace hardware when required. Projects will be completed by December 31, 2005.
Port Stanley Library
5800-02-03
$39,450
$4,967
Project is complete.
Belmont Library Renovations
5800-04-01
$22,000
$(240)
Project is complete.
Door Wall Protection - EM
5910-05-01
$10,000
$10,000
Project will be initiated in fall.
Interior Painting - EM
5910-05-02
$20,000
$20,000
Project is 25% complete.
Nurse Call Upgrades - EM
5910-05-03
$60,000
$60,000
IT is reviewing project for fall completion
Residents Security Improvements - EM
5910-05-04
$15,000
$15,000
Staff are reviewing options for project completion if fall.
Lounge furniture replacement - TL
5920-02-04
$21,600
$9,925
Project will be completed in fall.
Terrace Lodge Renovations
5920-03-09
$615,254
$61,783
Project is 95% complete
Door and wall protection - TL
5920-04-01
$23,100
$15,936
Project will be completed in fall.
Move and Add electrical Outlets - TL
5920-04-04
$18,000
$(1,680)
Project is complete.
Miscellaneous Professional Fees - TL
5920-05-08
$15,000
$1,500
Project is 85% complete.
Painting Interior of Building - TL
5920-05-09
$20,000
$20,000
Project will be initiated in fall.
Door I Wall protection - BV
5930-03-01
$30,000
$15,394
Project is 50% complete.
Landscaping at - BV
5930-03-04
$10,000
$1,546
Project is completed.
Paint Interior of Building - BV
5930-03-05
$30,000
$19,207
Project is 25% complete.
Cover over outside stairs - BV
5930-04-01
$40,000
$27,101
Engineering is 95% complete. Project will tendered in fall of 2005.
Replacement front flooring - BV
5930-04-03
$40,000
$(953)
Project is complete.
Blinds in Residents Rooms - BV
5930-05-01
$20,000
$8,859
Project is complete.
Commercial Washer and Dryers - BV
5930-05-02
$45,000
$44,574
Machines have been installed.
Drainage around - BV
5930-05-03
$0
$(15,750)
Project is complete.
Miscellaneous Professional Fees - BV
5930-05-04
$15,000
$15,000
Project will be initiated this fall.
Rehabilitate Laundry Room - BV
5930-05-06
$30,000
$21,927
Project is 80% complete.
Rail Road Crossing Improvements
6090-04-02
$35,000
$21,867
Require approval from Transport Canada for crossing on Ferguson Line before
completing, therefore this account may remain open for some time;
Miscellaneous Engineering Services
6090-04-03
$80,000
$49,302
Dexter Line slope stability engineering is still remaining to be completed.
Road Crack Sealing and Asphalt Patching
6090-05-01
$250,000
$37,827
Crack sealing is complete but asphalt patches are remaining to be completed.
Road 4 Survey and Design
6090-05-02
$20,000
$4,597
Engineering is 25% complete.
Road 7 reconstruction
6200-03-01
$1,600,000
$955,467
Project will be completed in fall.
Plank Road Slope Stabilization
6200-04-02
$650,000
$511,598
Project is 25% complete. Project will be completed this fall.
Traffic Signals Wellington Road I Ron McNeil Line
6200-04-04
$110,000
$3,201
Project is complete.
Vienna North Bridge Deck Replacement
6290-04-02
$1,200,000
$79,234
Bridge is complete, detour will be resurfaced this fall.
Town of Aylmer
6010-02
$170,142
$11,622
John Street Bridge earth wall repair will be completed in fall.
Road 74 (Belmont) Rehabilitation
6200-03-02
$825,000
$115,938
Project is complete.
Avon Road reconstruction
6200-05-01
$580,000
$327,958
Project is 50% complete.
Belmont Road Slope Stabilization
6200-06-01
$0
$27,751
Engineering is 95% complete. Slope became unstable after budget approval. Council has
approved project to be funded by efficiencies in capital budget Project is estimated at
$300,000.
Road 52 Resurfacing
6220-05-01
$430,000
$84,406
Project is complete. Holdback payment is remaining.
Road 40 Resurfacing
6220-05-02
$360,000 .
$130,653
Project is complete. Holdback payment is remaining.
Road 47 Resurfacing
6220-05-03
$425,000
$84,273
Project is complete. Holdback payment is remaining.
Road 45 Thin Cold Mix Overlay (TCMO)
Project is complete.
Road 48 TCMO (TL to Road 25)
Project is complete.
Road 48 TCMO (Road 25 to Road 74)
Project is complete.
Road 20 TCMO (Smith Road to Fingal)
Project is complete.
Road 22 TCMO
Project is complete.
Road 36 TCMO
Project is complete.
Road 14 TCMO
Project is 95% complete.
Road 5 TCMO
Project is complete.
6250-05-01
$70,000
$3,142
6250-05-02
$50,000
($927)
6250-05-03
$170,000
($855)
6250-05-04
$100,000
$16,006
6250-05-05
$55,000
$13,994
6250-05-06
$50,000
$12,056
6250-05-07
$100,000
$24,377
6250-05-08
$17,000
$3,422
Road 20 TCMO (Highway #401 to Road 18) 6250-05-09
$8,000
$(1,140)
Project is complete.
Road Sign Replacements
6260-05-01
$40,000
$26,659
Project is 80% complete.
King George Lift Bridge
6290-04-05
$490,000
$(57,305)
Project is 95 % complete. Several additional items will be completed this fall.
New Sarum Bridge
6290-05-01
$25,000
$(1,715)
Project was tendered in spring and cancelled sue to costs 60% over estimate. This
project has been approved for our COMRIF 2 application.
frQiects.scheduled for completion in 2006 or later
Museum Improvements
Miscellaneous Emergency Repairs
Renovations to Agricultural Building
Museum exterior Painting
2790-01
2790-02-01
2790-02-02
2790-03-01
$324,500
$245,180
The County of Elgin is in the process of relocating the museum to the fourth floor of the
Administration Building. The project will be completed the spring of 2006.
Magnetic Locks - TL
5920-04-06
$15,000
$15,000
Project will be completed with the renovation contract 5920-05-02.
Air Handling Units - TL
5920-05-01
$200,000
$200,000
Project will be completed with the renovation contract 5920-05-02.
Dining Lounge for Secured Residents - TL
5920-05-02
$230,000
204,913
Project will be completed with the renovation contract 5920-05-02.
. Garbage Compactor - TL
5920-05-05
$30,000
$30,000
Project will be completed with the renovation contract 5920-05-02.
Lighting in Visitor Parking Lot - TL
5920-05-06
$40,000
$40,000
Project will be completed with the renovation contract 5920-05-02.
Replace Flat Roofs at Wings - TL
5920-05-10
$40,000
$40,000
Project will be completed with the renovation contract 5920-05-02.
Resident Security Improvements - TL
5920-05-13
$40,000
$40,000
Project will be completed with the renovation contract 5920-05-02.
Ventilation in Tub Rooms - TL
5920-05-14
$15,000
$15,000
Project will be completed with the renovation contract 5920-05-02.
Waterline I Sewage line for Administration Building
6020-02
$358,470
$122,158
Waterline connection completed in fall of 2002. Environmental Assessment for sewage
connection will be completed in 2005 and the actual line connection will be completed in
2006.
Road 42 Relocation
6200-03-03
$550,000
$439,722
This project has two parts: transfer of Lakeshore Line and Glen Erie Line between the
municipality and county, which is completed this fall. The second part is providing
adequate safety features to the Little Otter Creek Bridge and improving the Glen Erie
Line road in 2006. Engineering is 10% complete.
REPORT TO COUNTY COUNCIL
FROM: Brian Masschaele, Manager of Archives
Cathy Bishop, Director of Library Services
DATE: 14 September 2005
SUBJECT: Museum Facility Design and Draft By-law
INTRODUCTION
Spriet Associates have completed a preliminary design for the renovation of the fourth floor of the
Elgin County Administration Building as the future home of the Elgin County Pioneer Museum.
Staff have also completed a draft by-law to govern the Museum's future operations. This report
presents both of these documents for the information of County Council and recommends that staff
convene an information session for the County's museum partners.
DISCUSSION:
Facility Design
Spriet Associates have completed a preliminary design to renovate the fourth floor of the Elgin
County Administration Building as the future home of the Elgin County Pioneer Museum according
to the terms of the agreement with the Federal and Provincial governments under the Sports,
Culture and Tourism Partnerships Initiative. The approved budget for this project is $400,000,
inclusive of all fees. The design concept is attached as Appendix A. This design is based upon
space allocations and facility standards developed by staff and the Province's Museum Advisor, as
well as feedback received from County museums on services to be provided. The following are
some of the features of the design:
.:. Incorporation of features from 32 Talbot Street;
.:. Environmental and security controls for preserving the museum's collections;
.:. A large exhibit area with room for both permanent, rotating and travelling displays;
.:. A roof hatch for receiving large artifacts;
.:. Sufficient curatorial space for staff and volunteers;
.:. 3,300 square feet of artifact and archival storage space;
.:. An educational/meeting area.
Staff are confident that this design will enable the Museum to preserve, exhibit and promote its
current collections while at the same time providing those services requested by County museums
as outlined in the report to County Council presented on March 22nd, 2005 entitled "Museum
Proposal". Initially, these services include:
.:. Development of a comprehensive database to document artifacts throughout the County for
use by all museums and the public;
.:. Cutting edge technical & marketing co-ordination;
.:. Flexible curatorial assistance;
.:. Transportation co-ordination.
Spriet Associates will be developing architectural drawings based on the attached design,
incorporating any comments received from members of Council. They will also be issuing a tender
for general construction in October 2005 for County Council's approval. It is hoped construction
will proceed by November for completion by March 31st, 2005.
Draft By-Law
After extensive consultation with County museums and community groups, such as Women's
Institutes, staff have completed a draft by-law to govern the Museum's operations from its new
location on the fourth floor. The by-law is attached as "Appendix B". The following are major
features of the by-law:
.:. Changing the name from Elgin County Pioneer Museum to Elgin County Museum;
.:. Adopting a new mission statement and statement of purpose to reflect the Museum's dual
mandate of providing existing programming and outreach services to County museums;
.:. Establishing a new model of governance which vests in County Council all executive authority
in order to bring administration of the museum in line with other County departments;
.:. Creating the Elgin County Museum Advisory Committee, comprised of seven members, which
will replace the former Elgin County Pioneer Museum Executive Committee and which will
provide important, advisory support to the Museum.
Issues of governance, and in particular the composition of the Advisory Committee, generated the
most feedback from other County museums and community organizations. Staff have responded
to this feedback and are now proposing a modified composition to the committee than originally
presented in the "Museum Proposal" report. The following are highlights of changes made to the
composition of the Advisory Committee:
.:. County Council has the authority to appoint an individual who is representative of, or employed
by, another museum located within the County of Elgin and who will act as a liaison with
County museums. It became clear during the consultation meeting held with County museums
on April 13th, 2005 that it was going to be difficult to find a suitable geographic representation
based on an east/central/west distribution of representatives. Concerns were also raised
about the nomination process given that County museums do not have a formal association
with voting procedures. This modified approach eliminates these issues by giving Council the
authority to appoint an individual who can best represent the interests of the museum
community regardless of their location.
.:. Women's Institutes and the International Order of the Daughters of the Empire raised concerns
about their lack of representation given their founding role in the Museum and their on-going
volunteer support. Staff have responded to this feedback by recommending that their
representation be maintained at previous levels. This will hopefully encourage these groups to
remain active in the Museum's affairs as they are a vital source of support.
.:. The St. Thomas-Elgin Tourist Association has confirmed that it wishes to be represented on
the committee.
Staff are confident that this draft by-law provides the governing framework for a new, dynamic
institution out of which further policies and procedures can be developed. Staff have received the
approval of the Province's Museum Advisor on this draft by-law.
Museum Planning - Next Steps
Staff recommend that an information session be convened for the benefit of interested County
museums during which the attached facility design and draft by-law can be presented. Should
Council approve, staff anticipate that this session will take place in early November. After this
session is completed, staff will be bringing the by-law back to County Council for final approval.
CONCLUSION:
Spriet Associates have completed a preliminary design for renovation of the fourth floor of the Elgin
County Administration Building as the future home of the Elgin County Pioneer Museum. Staff
have also completed a draft by-law to govern the Museum's future operation. Both of these
documents are presented for Council's information.
RECOMMENDATION:
That "Appendix A - Elgin County Museum Preliminary Design" and "Appendix B - Draft By-Law for
the Operation of the Elgin County Museum" be received as information;
AND THAT staff convene an information session with County museums as soon as possible to
apprise them of these documents.
Respectfully Submitted --
cat~~~
~~res
Brian asschaele ----'
Manager of Archives
McDonald
Chief Adminis rative Officer
U)~
W(1)
<~
-01
Oc
0(1)
U),
~Ja
o
I-!
w-
_,c
ct2
0.0
~
IIV XIaN:3:ddVu -
..
...
MO
~..
~
.~ .
~
~
~
p
~
dl W' ~~
~>
\ \ CI.l~
P~
!J t! ~~
~ ~~: ~
.. ..
~ a~~ ~ ~~ ~~
8'" 0
1;; !;:
l !j t! l Poo
~~~
O~
II Uz
~ 0 Z~
6~
z
<l: ~~
J
0..
[
0 ~
0 CI.l~
J ~~
IL
~ ~~.
J
0
IL 0
U
Z
S
~
~
III
Q
Q
Ii
N
III
fiI
::~
~fiI
;~
~~
iliROdaN M~-Ag ili~a aNV N~IS:3:a XiliI~IJVd wn:3:snw
"Museum Facility Design and Draft By-Law Report - "Appendix B"
COUNTY OF ELGIN
By-Law No. XX-XX
"BEING A BY-LAW TO PROVIDE FOR THE OPERATION OF
THE ELGIN COUNTY MUSEUM"
WHEREAS by section XXXX of The Municipal Act xxxx and Regulation 877, Ontario
Heritage Act (R.R.O. 1990); and,
WHEREAS it is both desirable and timely to reconstitute the mandate, governance,
policies and procedures for the Elgin County Pioneer Museum given its re-Iocation to
the fourth floor of the Elgin County Administration Building; and;
WHEREAS it is also necessary to address matters pertaining to property and assets
of the Museum.
NOW THEREFORE the Municipal Council of the Corporation of the County of Elgin
hereby enacts as follows:
1. NAME - The name of the Museum shall be changed from "The Elgin County Pioneer
Museum" to the "Elgin County Museum".
2. ASSETS - The lands, buildings, furniture, equipment, goods, chattels, artifacts and
objects of any nature whatsoever whether acquired by or donated to the former Elgin
County Pioneer Museum and/or the Elgin County Museum, including objects and
artifacts held in trust by the Museum prior to the enacting of this by-law, shall be the
property of the Corporation of the County of Elgin. Ownership of the artifacts is
assigned unto the Corporation of the County of Elgin, its successors, administrators
and assigns absolutely.
3. a) STATEMENT OF PURPOSE - The principal objectives of the Museum are two-
fold:
L) to acquire, document, preserve, display and interpret for the benefit of the
public those artifacts donated to, or maintained by, the Museum which relate
to the history and development of the geographic County of Elgin in order to
encourage public interest in the history of the County;
iL) to provide leadership and professional support to museums located within
the County of Elgin in the promotion of a heritage network within the County,
including documentation of resources, coordination of exhibits, marketing,
training and advisory services.
MISSION STATEMENT
The Elgin County Museum exists to promote Elgin County's rich historical and
agricultural heritage to all Canadians by acquiring, documenting, preserving,
exhibiting and interpreting artifacts pertaining to the history of the County of Elgin;
and to provide leadership and support to County museums in the promotion of a
heritage partnership.
b) The Museum shall carry out its statement of purpose and mission through the
following activities:
ACQUISITION - The Museum is committed to acquiring artifacts pertaining directly
to the history of the County of Elgin or its citizens. All acquisitions must meet the
terms of clearly defined acquisition policy approved by Elgin County Council.
Sufficient space and resources will be devoted to managing all acquisitions in
accordance with museum standards and professional practice.
DOCUMENTATION - The Museum is committed to properly documenting all
artifacts in its collection in order to record provenance, transfer of ownership and
context of use. Such documentation will include use of instruments such as
temporary receipts, deeds of gift and accession registers.
PRESERVATION - The Museum is committed to ensuring the long-term
preservation of artifacts under its care. Every effort will be made to store artifacts
in a suitable repository wherein temperature, relative humidity, lighting and air
quality are all controlled according to museum standards as defined by the
Canadian Conservation Institute. Adequate security systems will be in place. Staff
will furthermore promote the responsible care, handling, conservation and/or
reproduction of all artifacts in accordance with preservation policies and procedures.
EXHIBITION - The Museum is committed to providing ample space for thematic,
permanent and travelling exhibits which will be made accessible to the general
public in a secure environment and within suitable hours. Ample resources will be
devoted to producing and providing public access to such exhibits, both on-site and
through use of available technology.
INTERPRETATION - The Museum is committed to interpretation and educational
programs to encourage wide-spread interest in the history of the County of Elgin.
Programs, displays, activities and events will be developed to appeal to groups
such as elementary and secondary school students, senior citizens and the public
at large.
OUTREACH - The Museum is committed to engaging the general public and the
museum community in its operations. Outreach activities include advertising,
soliciting volunteers, forming partnerships with other County museums, participating
in educational opportunities and facilitating professional development. Suitable
resources will exist for promoting the Museum and its activities within the
community.
4. GOVERNANCE AND STAFFING
(a) The Museum and its staff shall be governed by Elgin County Council through the
Director of Library Services (or designate as established by Council) in accordance
with the County's policies and procedures. This includes: authority for recruiting,
supervising and evaluating museum staff; establishing the budget and financial
administration; facility maintenance; hours of operation; and final approval of all
written policy governing operations and defining programs.
(b) The Museum shall have professional staff with responsibility for the acquisition,
documentation, care and custody of all artifacts, outreach services, displays,
management of volunteers and publicity pertaining to the Museum's operations.
(c) The County shall have an advisory committee, to be called the Elqin County Museum
Advisory Committee, which shall be constituted to act in an advisory capacity to
County Council and staff on an as needed basis on matters including (but not limited
to):
I. Admission and membership fees;
II. Ideas and research on exhibitions;
III. Feedback on potential acquisitions;
IV. Fundraising activities, publicity and special events;
V. Review of draft policies and procedures;
VI. Liaison with County museums;
VII. Liaison with allied organizations such as Women's Institutes, International
Order of The Daughters of The Empire and the St. Thomas-Elgin Tourist
Association;
VIII. Establishment and organization of related advocacy groups and friends
organizations.
Representation
The Advisory Committee shall be comprised of seven members appointed annually
by the Council of the County of Elgin at its December session and to be appointed in
the following manner:
One member of Elgin County Council;
Two appointees from Elgin County Women's Institutes; one from East Elgin and one
from West Elgin;
One appointee on behalf of Elgin-St. Thomas branches of the International Order of
The Daughters of the Empire;
One appointee on behalf of the St. Thomas-Elgin Tourist Association;
One appointee, to be named by Elgin County Council, who is representative of, or
employed by, another museum located within the County of Elgin and who will act as
a liaison with County museums;
One appointee, to be named by Elgin County Council, as an "at large" member who
shall be a person interested and knowledgeable about the affairs of the Museum.
The Director of Library Services (or designate) and Museum staff shall also attend
meetings as non-voting members.
Officers
The Advisory Committee shall appoint a Chairperson, Vice-Chairperson and
Secretary from its members at its first meeting in each year;
The Chairperson shall be the presiding officer of the committee. He of she shall
arrange for meetings, establish the agenda and preside at all meetings;
The Vice-Chairperson shall assume the duties of the Chairperson in his or her
absence and shall have when acting so all the authority and responsibility of the
Chairperson;
The Secretary shall maintain a record of proceedings of the committee, provide notice
of meetings, report attendance, disseminate minutes and be generally responsible for
the correspondence of the committee.
Term of Office
The members of the Advisory Committee shall continue in office until their successors
are appointed. With the exception of the representative on Elgin County Council, who
shall be appointed on an annual basis, members shall be appointed for a term of
three years and provisions shall be made in the initial appointments for members to
serve for terms of one, two and three years so that the expiration of members' terms
is on a "staggered" basis, with succeeding terms to be for a period of three years.
In the event that a member is absent from three successive meetings of the Advisory
Committee without being excused by resolution of the committee, such member shall
be deemed to have resigned from the position and the committee shall forthwith notify
such members by certified service mail and proceed to request the appointing body to
fill the vacant position on the committee.
Rules of Procedure
1. Members shall be recognized by the Chair before speaking;
2. No member shall speak a second time on the same topic until others have had an
opportunity to speak to the item;
3. The Chair of the committee shall be encouraged to speak last, following the
members of the committee;
4. The Chair reserves the right to limit debate after having provided members with
sufficient opportunity to speak.
Meetinqs Per Annum
The Advisory Committee shall meet no less than two times per calendar year, with an
appropriate meeting schedule to be determined by the Chair in consultation with the
committee at the beginning of each calendar year.
5. Statement of Ethical Behaviour and Pecuniary Interest - Staff, members of the
Advisory Committee and volunteers are obligated to conduct their affairs in
accordance with the Employee Code of Ethics as established by Elgin County
Council and professional codes of ethics for museum practice. All individuals
associated with the Museum shall avoid conflicts of interest, pecuniary or
otherwise. If a conflict is declared, individuals shall absent themselves from all
discussions on the particular matter.
6. That By-Law No. 02-25 is hereby repealed.
READ a first and second time this th day of xxxx 2005.
READ a third time and finally passed this th day of xxxx 2005.
Mark G. McDonald,
Chief Administrative Officer.
James Mcintyre,
Warden.
REPORT TO COUNTY COUNCIL
FROM:
Pat Vandevenne
Director of Senior Services/Manager of Resident Care
DATE:
September 19,2005
SUBJECT:
Ontario Nursing Strategy
INTRODUCTION:
The Nursing Secretariat has announced a new Ontario Nursing Strategy Initiative for
2005/2006 year.
DISCUSSION:
This comprehensive strategy was created through consultations with nursing leaders
and front line nursing staff to address the core reasons for instability in the nursing
workforce. It is part of a broader Health Human Resource Strategy that will improve
access to care, reduce wait times and improve patient outcomes by increasing
recruitment and retention of health care professionals.
The overall goals of the strategy are to:
· Increase the number of full-time positions for nurses;
· Improve recruitment and retention of nurses; and
· Improve nursing workplace
Hospitals, Long Term Care Homes, Public Health and Home Health were encouraged to
apply from August 15th, to September 16th 2005 in their respective areas. In the Long
Term Care Sector, we had the opportunity to apply in 4 categories. These include New
Graduate, Late Career, Patient Lifts and Mentoring Preceptorship.
CONCLUSION:
Submissions to the Nursing Secretariat did occur for Terrace Lodge, Elgin Manor and
Bobier Villa, in appropriate areas, on or before September 16, 2005. Results of
submissions will be received by late October. If approved there in no cost to the County
of Elgin.
RECOMMENDATION:
That Council receive and file.
Respectfully Submitted
eJQ~1~-
Pat Vandevenne
Director of Senior Services/
Manager of Resident Care
Mar
Chief Administrative Officer
REPORT TO COUNTY COUNCIL
FROM: Clayton Watters, Director, Engineering Services
Sonia Beavers, Purchasing Co-Ordinator
DATE: September 22, 2005
SUBJECT: Tender Award - County Road 74 Slope Rehabilitation
Introduction:
As part of the approved 2005 Capital Budget, tenders were advertised as per the
County's Purchasing Policy and were received until Thursday, September 22, 2005 for
County Road 74, Belmont Road, Slope Rehabilitation.
Discussion I Conclusion:
Seven contractors submitted bids for the County Road 74 Slope Rehabilitation. The
results of the bids are as follows:
COMPANY
A-Xcavatin Limited
Aar-Con Excavatin
L -82 Construction Limited
Birnam Excavatin Limited
EI in Construction
Bre-Ex Limited
Tri-Con Excavatin
TENDER BID inclusive of taxes
$ 214451.69
$ 214594.55
$ 219967.71
$ 246497.74
$ 247,986.16
$ 257,697.15
$ 291,638.13
A-Xcavating Limited submitted the lowest bid for the County Road No. 74 Slope
Rehabilitation at a total price of $ 214,451.69 (including taxes). The bid includes all
labour, equipment and materials required to complete the project all in accordance with
the Form of Tender.
The capital budget allocation for this project is $300,000.00 and therefore the total
overall cost including Engineering Services is within the capital budget allocation.
I
Recommendation:
THAT, A-Xcavating be selected for the County Road 74 Slope Rehabilitation Project at
their submitted price of $ 214/451.69 inclusive of all taxes; and
THAT, the Warden and Chief Administrative Officer be authorized to enter into an
agreement for the County Road No. 74 Slope Rehabilitation Con . 205087.
Respectful~r ,S~bmitted
()fW6jrJ;U
Clayton Watters
Director, Engineering Services
~C~~~~
Sonia Beavers
Purchasing Co-Ordinator
~
CORRESPONDENCE - SEPTEMBER 27.2005
Items for Consideration
1) City of Hamilton, endorsing the Ontario Mayors for the Future of Agriculture
recommendation to the Province of Ontario to develop funding mechanisms to
support rural and agricultural development issues. (ATTACHED)
CITY OF HAMILTON
71 Main Street West
Hamilton, Ontario L8P 4Y5
MOTION
Council Date: July 13, 2005
MOVED BY COUNCillOR
PEARSON............................................... .
SECONDED BY COUNCillOR.. ...... .MERUllA................... ....................
Funding Mechanisms to Support Rural and Agricultural Development
Issues
Whereas the level of investment to support rural and agricultural communities
and to support the development of a more competitive rural economy cannot be
reasonably sustained by the current property tax yield.
Therefore be it resolved:
(a) That the Council of the City of Hamilton endorses the resolution of the
Ontario Mayors for the Future of Agriculture recommending that the
Province of Ontario immediately develop effective funding mechanisms
specifically to support rural and agricultural development issues.
(b) And further, that all Ontario Municipal communities endorse this
recommendation through their respective Councils and respond back to
the Ontario Mayors for the Future of Agriculture, c/o Mayor Rita Kalmbach,
Norfolk County.
(Note: Correspondence can be forwarded to Mayor R. Kalmbach at 50
Colborne Street, P. O. Box 545, Simcoe, Ontario N3Y 4N5 or by e-
mail at rita.kalmbach@norfolkcountv.on.ca.)
..5
Ontario Mayor's for the Future of Agriculture
Wednesday, June 1, 2005
Junior Farmers' Building, Norfolk County Fairgrounds, Simcoe, Ontario
Motion
Whereas the level of investment to support rural and agricultural communities and
to support the development of a more competitive rural economy cannot be
reasonably sustained by the current property tax yield.
Therefore be it resolved that the Ontario Mayors for the Future of Agriculture
recommend that the Province of Ontario immediately develop effective funding
mechanisms specifically to support rural and agricultural development issues.
And further that all Ontario Municipal communities endorse this recommendation
through their respective Councils and respond back to the Ontario Mayors for the
Future of Agriculture at Norfolk County attention Mayor Rita Kalmbach.
Moved by Mayor Bill Hodgson of Lincoln
Seconded by Warden Douglas Struthers of Leeds and Grenville
Passed with majority
if
CORRESPONDENCE - SEPTEMBER 27.2005
Items for Information (Consent AQenda)
1) Dr. Sheela V. Basrur, Chief Medical Officer of Health and Assistant Deputy Minister,
Ministry of Health and Long-Term Care, announcing the creation of the Ministry of
Health Promotion and the naming of the Hon. Jim Watson as the Minister of Health
Promotion. (ATTACHED)
2) AMO Member Communication ALERT, "Hearings on Bill 123 - An Act to Require that
Meetings of Provincial and Municipal Boards, Commissions and Other Public Bodies
be Open to the Public. (ATTACHED)
3) Southwest Municipal Services Office of the Ministry of Municipal Affairs and Housing
and the Association of Municipalities of Ontario with Conference information,
registration forms and accommodation information regarding the 2005 Ontario
Southwest Municipal Conference to be held at the Best Western Lamplighter Inn,
London, Ont. on November 18,2005. (ATTACHED)
4) Tim Lanthier, Water Conservation Supervisor, Kettle Creek Conservation Fund,
thanking the County for the use of space at the Administration Building to host the
recent Source Water Protection Meeting.
5) St. Thomas-Elgin General Hospital, Media Release, "STEGH Foundation Launches
New Campaign". (ATTACHED)
6) Hon. George Smitherman, Ministry of Health and Long-Term Care, advising of the
County's share of the new Land Ambulance Services Grant, salaries and wages
incremental increase for 2005/06. (ATTACHED)
7) Sid Ryan, President, CUPE Ontario and Shellie Bird, President, OCBCC, with a
resolution designating October 26, 2005 as the 5th Annual "Child Care Worker &
Early Childhood Educator Appreciation Day" and asking for Council's
endorsement. (ATTACHED)
8) Debbie Zimmerman, Chair, Board of Directors, Municipal Property Assessment
Corporation (MPAC), inviting members of Council to attend MPAC's 2005 Annual
Meeting to be held on October 19th from 8:00 a.m. - 9:00 a.m. at the Sheraton
Fallsview Hotel and Conference Centre, Niagara Falls, during the Counties,
Regions and Single Tier Municipalities and District Social Services
Administration Boards Conference. (ATTACHED)
Ministry of Health
and Long-Term Care
Ministere de la Sante
et des Soins de longue duree
Medecin hygieniste en chef et
Sous-mlnistre adjoint
@ Ontario
Chief Medical Officer of Health and
Assistant Deputy Minister
Public Health Division
11th Floor, Hepburn Block
Queen's Park
Toronto ON M7A 1R3
Division de la sante publique
Edifice Hepburn, 11 etage
Queen's Park
Toronto (ON) M7A 1R3
Telephone: (416) 212-3831
Telecopieur. (416) 325-8412
Telephone: (416) 212-3831
Facsimile: (416) 325-8412
September 7, 2005
To:
Medical Officers of Health
From:
Dr. Sheela Basrur, Chief Medical Officer of Health and Assistant Deputy Minister
New Ministry of Health Promotion
Re:
Premier McGuinty announced the creation of the Ministry of Health Promotion on June 29, 2005. This is the
first time Ontario has a dedicated portfolio for the promotion of healthy living and illness prevention. The
Honourable Jim Watson was named the Minister of Health Promotion and Peter Fonseca has been appointed
Parliamentary Assistant to Minister Watson.
This announcement demonstrates the government's renewed focus on health promotion. I am actively involved
in the planning and implementation of the new Ministry and can assure you that Minister Watson will give the
portfolio the recognition and profile it deserves. I am inspired by his personal and professional passion for
making a positive difference in the health of Ontarians.
The details of the new Ministry are still being developed. The Cabinet Secretary recently announced the
appointment of Marg Rappolt as Deputy Minister of the Ministry of Health Promotion effective Monday August
29,2005. Since joining the Ministry of Health and Long-Term Care in February 2003, Marg has made many
significant contributions, including acting as Deputy Minister and has indepth knowledge of the health care
system and of government processes. I am committed to working with our newly appointed Deputy Minister to
ensure that the new ministry has a strong and supportive link to the Ministry of Health and Long-Term Care.
Within the Ministry of Health and Long-Term Care, a transition team has been charged with the responsibility
of working through the changes that this announcement brings to the programs and services that we currently
deliver to ensure a seamless transition.
I welcome the new Ministry of Health Promotion and the potential it signals for innovation and creativity in
health promotion initiatives and programming. I am certain that you have many questions about the Ministry
and its relationship to public health units across the province. I will keep you informed as new information
becomes available.
Yours truly,
~
Dr. Sheela V. Basrur
Chief Medical Officer of Health and
Assistant Deputy Minister
c.c. Marg Rappolt, Deputy Minister, Ministry of Health Promotion
Ron Sapsford, Deputy Minister, Ministry of Health and Long-Term Care
4225-64 (04103)
Member Communication
/
r.. '.."'./.......... r'.......................... Association of
. '".''' \ Municipalities
H :ttl . . of Ontario
rt
393 University Avenue, Suite 1701
Toronto, ON M5G 1 E6
Tel: (416) 971-9856' fax: (416) 971-6191
email: amo@amo.on.ca
To the immediate attention of the Clerk and Council
September 9, 2005 - Alert 051068
Hearings on Bill 123 - An Act to Require that Meetings of Provincial
and Municipal Boards, Commissions and Other Public Bodies be Open
to the Public
Issue: Bill 123 - a Private Member's Bill that would require meetings of municipal bodies / boards /
commissions to be open to the public is currently being considered by the Standing Committee on
Regulations and Private Bills. Hearings will be held on September 29th and requests to appear must be
made by 5:00 p.m., Monday September 12,2005.
Impact on Municipalities:
The proposed legislation would require a wide range of public bodies to ensure their meetings are open to
the public and that minutes are made available, including:
. Municipal councils & council committees . Local services boards
. Boards of health . Police services boards
. Municipal commissions . Library boards
Some exceptions would be made if matters discussed focused on financial or personal matters or labour
relations. The legislation states that if a body chose to "close" a meeting, a motion to close the meeting
must be held in public outlining the reasons why. A designated public body is also proposed that would
make rules outlining how public notice shall be given and how minutes are to be made available.
AMO Position:
AMO supports the principles of open, transparent and accountable municipal governments, but does not
support this Bill. The content of this legislation counters AMO's work under the Municipal Act review and
its work to establish a mature provincial/municipal relationship. AMO believes that these important matters
should be discussed in the context of the current Municipal Act review and considered by the Legislature
when it debates a new Municipal Act. To consider these matters outside of this process is counter
productive and cannot be supported. AMO will seek to have municipal organizations exempted from this
legislation if it proceeds.
How You Can Be Involved:
It is important for the municipal sector to be heard on this issue. If you wish to make a formal presentation
to the Standing Committee you must submit a request - by phone, fax or email - by end of day Monday,
September 12, 2005. Otherwise written submissions can be received until end of day September 29,
2005. Here is the contact information:
Standing Committee on Regulations & Private Bills
C/O Tonia Grannum, Committee Clerk
Room 1405, Whitney Block
Queen's Park
Toronto, ON M7A 1A2
Tel: 416-325-3519
Fax: 416-325-3505
Email: tonia qrannumca>.ontla.ola.orq
This information is available in the Policy Issues section ofthe AMO website at www.amo.on.ca
For more information, contact 416-971-9856: Sherri Hanley, Senior Policy Advisor, extension 315
@ Ontario
GLOBAL ISSUES: LOCAL IMPACTS
Friday, November 18, 2005 . Best Western Lamplighter Inn . London, ON
The Southwest Municipal Services Office of the Ministry of Municipal Affairs and Housing along with the
Association of Municipalities of Ontario (AMO) are pleased to invite you to attend the 2005 Ontario Southwest
Municipal Conference Global Issues - Local Impacts on Friday, November 18, 2005 at the Best Western
Lamplighter Inn and Conference Centre in London.
There will be a number of concurrent sessions on timely topics of interest to municipalities in our region
including: The Kyoto Protocol, Border Crossings, Water and Wastewater Issues, Rubella in Oxford County,
the Places to Grow Act 2005, Affordable Housing, Innovative Tourism, amongst others.
Further complementing this year's theme of Global Issues - Local Impacts, best-selling author and leading
futurist Richard Worzel, will deliver the opening address. Mr. Worzel equips organizations with the ability to
understand the changes to be faced in the years ahead and the tools needed to change and adapt. His
presentation will deal with how to prepare intelligently for our uncertain future.
The Hon. John Gerretsen, the Minister of Municipal Affairs and Housing, will address the conference delegates
and present long-standing service awards to recognize municipally elected officials with at least 25 years of
service.
Registration forms are available on the AMO web site at www.amo.on.ca under the link: "AMO Conferences."
Please send completed Registration forms (attached) with payment by cheque payable to AMO to:
Association of Municipalities of Ontario
Attention: Brenda Harvey
393 University Ave., Suite 1701
Toronto, Ontario M5G 1 E6
Completed forms with payment by credit card can also be faxed to AMO at (416) 971-9372.
If you require hotel accommodations, a block of rooms at a special rate starting from $99.00 per night have
been set aside until October 18th, 2005 at:
The Best Western Lamplighter Inn
591 Wellington Road South
London, Ontario N6C 4R3
Phone: (519)-681-7151 or 1-888-232-6747
If you have any questions, please contact conference organizers Dan Hammond at (519) 873-4030, or
toll free at 1-800-265-4736.
Ontario Southwest Municipal Conference
Ministry of Municipal Affairs and Housing
Association of Municipalities of Ontario
@ Ontario
GLOBAL ISSUES: LOCAL IMPACTS
Friday, November 18, 2005 · Best Western Lamplighter Inn · London, ON
Morning Sessions
Description
Affordable Housing This session brings you the latest word on the new Federal -
Provincial Affordable Housing program, including an update on
affordable housing projects currently under development, and
success stories in Southwestern Ontario.
Implementation of the Kyoto Learn how global climate change impacts local government, and
Protocol about the municipal role in meeting the targets set out in the Kyoto
Protocol.
Tourism: Innovative Experiences Hear how Bruce County has responded to international affairs and
from the Bruce emerging industry trends by using innovative ways to attract
tourists and local residents to its diverse destinations.
Rubella in Oxford County: The Representatives of Norwich Township and Oxford County will join
Experience and Lessons Learned us to discuss their experiences in managing the Rubella outbreak.
Border Crossings Learn how border communities address the challenges of
increasing traffic levels and responding to demand on municipal
infrastructure, along with their response to the economic impacts of
delayed crossings and detours from such events as accidents, train
derailments and chemical spills.
Afternoon Sessions
Description
Places to Grow: A Perspective The Ministry of Public Infrastructure renewal will present
from Southwestern Ontario information on future activities under the new Places to Grow Act
2005, and the Office of the Provincial Facilitator.
The Legislative Agenda: What's Provincial staff will review and provide status updates of current
New, and Local Impacts and emerging provincial policy initiatives regarding legislative
changes including the Municipal Act, 2001 review; the proposed
Development Charges Act Review and others.
Water, Water, Everywhere... Join us for a discussion about the recommendations brought
forward by the Water Strategy Expert Panel appointed by the
Ontario Government to study the province's water and wastewater
sector. This session will address the topics of sustainability, full
cost pricing for water services as well as the need for investment in
aging water and wastewater systems.
Sustaining Municipal This session will provide municipalities with strategies and practical
Infrastructure ideas for implementing long-term sustainable infrastructure
management strategies and action plans.
Ontario Southwest Municipal Conference
Ministry of Municipal Affairs and Housing
Association of Municipalities of Ontario
~ Ontario
GLOBAL ISSUES: LOCAL IMPACTS
Friday, November 18, 2005 · Best Western Lamplighter Inn · London, ON
Please type or print clearly. Use one form per registrant. Payment MUST accompany registration.
First name Last name
Title Municipalitv/Orqanization
Address
City Provo Postal Code
Phone Fax Email
REGISTRATION FEE -INCLUDES LUNCH - $150.00 ($140.19 + $9.81 GST)
GST Registration # R106732944
Please check off your morning and afternoon session preferences - see attached for details.
Mornina Session - Choose One
Afternoon Session - Choose One
o Affordable Housing
o Implementation of the Kyoto Protocol
o Places to Grow: A Perspective from
Southwestern Ontario
o Tourism: Innovative Experiences from the Bruce
o The Legislative Agenda: What's New, and Local
Impacts
o Rubella in Oxford County: The Experience and
Lessons Learned
o Water, Water, Everywhere...
o Border Crossings
o Sustaining Municipal Infrastructure
PAYMENT
Registration forms CANNOT be processed unless accompanied by proper payment.
ONLY PAYMENT BY CREDIT CARD MAYBE FAXED TO 416-971-9372
o Cheque Payable to: o VISA o MasterCard o American Express
Card #
Association of Municipalities of Ontario Name on Card
393 University Ave., Suite 1701, Toronto,
ON M5G 1E6 Expiry Date
Signature
REFUND POLICY
Cancellations must be requested in writing and received by AMO on or before November 4, 2005
An administration fee of $26.75 ($25 +GST) will apply.
REGISTRATION INQUIRIES-Brenda Harvey:416-971-9856 or 1-877-426-6527 Ext. 330
Email bharvey@amo.on.ca
Ontario Southwest Municipal Conference
Ministry of Municipal Affairs and Housing
Association of Municipalities of Ontario
,y (
" .;:../"'"\
C- 0 'J
~ \J)
.; ~ .(,
~ VI.
y, .~
.J .) rY -=t='
---<:
!.t '-r~_
-; -- 6
~-f) <'
'+ () .c:\./
....c.: ':
-f-
o .(l ~
-I- ~ C~
~' c..
~ N( 6:J \/)
.......+- <: I) c.
(: ~ .-;.:, -~
~ .. iV ;~ _
.J .-{ ~
. Iv,--+ (.'0
.~ . {) l..-
( <..-h .;\)
,,-!/) \, -r
( <V C
. --t:' i
q)0~ n
./] D. V 1'\
. i~ ~ u
~
n
-.
.~)
.J "
l~
(y
'1i
V
'1/
~)
(
\S
"
:i'"
~
-+-
">
v
'L (' '0
vr; .~~
- -1; ~
" S "-T
..... t "
~ .J
'> ';:
~ "
)> (.)
(
0, _..u
t..J C}i
~
~U
"'"t 1)
130.
.....Ju
'a~
I:~
:I~
....g
Vl
~c'~
III 0,..,
W ._ :P
CII"~
..!!~
u .... \l)
..
CIIC11
-..
"c
"0
CIIU
<t
~ St. Thomas-Elgin
~ :,:~:~:lfo~OU~:,~i~~
Media Release
September 16, 2005
STEGH Foundation Launches New Campaign
St. Thomas, ON - Nurses at STEGH are worth a million - and that is exactly what the St, Thomas
Elgin General Hospital (STEGH) Foundation is asking for. On September 22,2005 the STEGH
Foundation will launch their new fundraising campaign aimed at raising $1 Million to buy new beds
for the two-north, fourth, and fifth floor patient rooms.
Many of the beds at STEGH are over 20 years old and are often broken. Nursing staff risk injury
when they must manually adjust the bed or shift the patient. Replacing beds was noted as a top
priority when nursing staff were recently surveyed. New beds, over bed tables, bedside cabinets
and comfortable sitting chairs are all part of the improvement initiative. Replacing outdated and
worn-out furniture in patient rooms will also create a comfortable healing environment, one in which
the nurses can truly provide the best possible care.
The community is invited to drop by between 10:00am and 7:30pm on the 22nd to catch a
sneak preview of the new beds and patient room furnishings. A newly refurbished "patient
room" will be on display in a tent at the East Entrance, and refreshments will be served throughout
the day.
Some of the new beds will have special mattresses for patients with complex health problems that
put them at risk of skin breakdown. Other beds feature alarms that alert the nurse if the patient is
getting out of bed.
"Purchasing new beds and patient room furnishings will greatly enhance the quality of our patients'
stay and improve the working conditions for STEGH Nurses," says Ron Elliott, STEGH Foundation
President. ''The rooms desperately need updating and we need the community's support to make
this happen."
While previous fundraising campaigns have been aimed at supporting new equipment purchases
for technological advances, this campaign hits at the heart of patient care. Pat Sullivan, RN has
been a nurse at STEGH for 22 years. She looks forward to the arrival of new beds. ''This is going
to be great," Sullivan says. "It will help us a lot."
The Foundation has already received a generous 'lead' donation of $250,000 from the Estate of
Stuart Parsons for this Campaign. Elliott noted "We are grateful for the community support we
received in the past and look forward to ongoing support with our goal to raise $1 million by March
2007."
To make a donation, or for more information about this Campaign please contact the STEGH
Foundation office at 631-2030 Ext 2246 or visit the hospital web site at www.steqh.on.ca.
-30-
Photo Opportunity
Unveiling The New Acute Care Bed To Launch The $1 Million Fundraising Campaign
Date: September 22,2005
Time: 10:00 a.m.
10th Floor, Hepburn Block
80 Grosvenor Street
Toronto ON M7A 2C4
Tel 416-327-4300
Fax 416-326-1571
www.health.gov.on.ca
10. etage, edifice Hepburn
80, rue Grosvenor
Toronto ON M7A 2C4
Tel 416-327-4300
Telec 416-326-1571
www.health.gov.on.ca
~
"'1IIIIlIlII"
i 'it~OntariO
~.::'3~
Ministry of Health
and Long-Term Care
Ministere de la Sante
et des Soins de longue duree
Office of the Minister
Bureau du ministre
f1
2 0 2005
SEr 1 L 2005
Mr. Mark MacDonald
Chief Administrative Officer
County of Elgin
450 Sunset Drive
St. Thomas ON N5R 5Vl
Dear Mr. MacDonald:
Last year, the McGuinty government unveiled an ambitious health reform plan.
I would like to thank you for your continuing effort and co-operation in working
with my Ministry to improve Ontario's health care system.
The success of our reform plan is dependent on our enhancement of resources to
strengthen care in the community to relieve pressure on hospitals and improve
health outcomes. To this end, the government is pleased to advise you that it will
continue to meet its commitment to share in the approved costs of salaries and
wages for land ambulance operations, delivering the best kind of care to
Ontarians where they need it most.
Total funding for Emergency Health Services is approximately $491.9M for
2005/06.
Your organization's share of this new 2005/06 funding is as follows:
~ Land Ambulance Services Grant, salaries and wages incremental increase:
$28,362.
Your increased funding will be initiated shortly.
Page 1
I would like to take this opportunity to again convey my sincere appreciation for
the considerable contributions all members of your organization make in the
provision of health services in your communities.
Yours truly,
h~ fs'~
George Smitherman
Minister
c: Mary Kardos Burton, ADM, Acute Services Division
Malcolm Bates, Director, Emergency Health Services Branch
Honourable Steve Peters, MPP Elgin-Middlesex-London
Page 2
09/21/2005 15:44
4155385737
OCBCC
PAGE 02
I
305 Milner Ave, Suite 80~
Scarborough, ON M1 B 3 4
Phone: 416-299-9739. ax: 416-299-3480
Web: cupe.on.ca E-mail: bupeont@web.net
July 20, 2005
To Mayors and Cou lis, I
We are writing to as that you and your Council endorse a day of reCOgniti~n for the
many people who w rk providing care to children in your community. Last ear there
were over one hundr d municipalities that proclaimed this special day.
I
The Ontario Coalitio for Better Child Care (OCBCC), The Canadian uniot of Public
Employees (CUPE) nd our other labour partners representing Child Care workers
across Ontario are a king that this year Wednesday Ogober 26th 2009 be proclaimed
as Child Care WOIl r & Early Childhood Educator Appreciation Day if accordance
with the attached re lution.
Many groups are re nized by way of Municipal Resolution. Such a d8Y{"0WS the
community to recog ize the work of various groups and to acknowledge t e
contributions they m ke in the lives of community members.
Many children, famili s and communities benefit from the work of Child C re workers.
Child Care also cont ibutes to the economic life of communities. Researc shows the
many economic ben fits accrued from affordable, accessible, high quality Child Care.
This benefit comes f om the number of people employed in the Child Car Industry and
because the availab ity of Child Care allows parents to work and to contri ute to the
economic life of soci ty.
To help us to promo e this day we would also like to ask your Council to ~OVide
financial support for ublic announcements, for example; .advertising the ay on the side
of city buses or othe means your Council uses to reach out to the public nd we .are
happy to provide a ork to facilitate this process. We hope that with you active
support, your procls ation of this day of recognition will encourage and s~pport a day
of community recog ition for Child Care workers. !
i
Please advise us of our participation in this day of recognition so that wel can
acknowledge your c mmunity's role in celebrating Child Care workers acrPss Ontario
on October 26111, 20 5. i
Thank you for your
Yours sincerely,
~~~
President, CUPE 0 tano
,
~,.~;....
. .' .
.' "
" :.'. . .
.. .
. . ~, .' . . I
. . , . . ~
. ,
. .
Shellie Bird. i
President, OCBcci
I
COI'U01;Mp
Patrick (Sid) Ryan
President
ONE STRONG VOICE
.5
I Brian O'Keefe
~ec~tary- Treasurer
I
i
09/21/2005 15:44
4155385737
OCBCC
PAGE 03
I
i
I
I
I
i
i '
5TH ANNUAL CHILD CAREi
WORK.R " EARLY CHILDHOOD
EDUCAtOR APPRECIATION DAY
I
I
!
OCTOBER 16, 1005
I
I
I
!
i
I
!
i
I
j
I
I
I
Where.. thirty fiv~ years of research confirms the benefits of high qljJality child
care for young chi~ren's intellectual, emotional, social and physical development
and later life outcomes; and
I
I
Where.. child ~re promotes the well-being of children and respomds to the
needs of parents, ichild care wor1(ers and the broader community by supporting
quality of life so I that citizens can fully participate in and contribliJte to the
economic and soctal1ife of their community; and
i
Whereas recent i studies clearly show trained and knowledge~ble Early
Childhood EducatPrs and child care workers are the most important ~tement in
quality child care~ and further that good wages and working concjtitions are
associated with h~gher job satisfaction and morale, lower staff turnbver all of
which predict hightr quality care
Therefore Be It ~..oIYed that October 26, 2005 be designated the 5th annual
"Child Care WOrkttf & Early Childhood Educator Appreciation Day" in recognition
of the influence, ~edication and commitment of child care workers tp children,
their families and ;uality of life of the community. '
RESOLUTION
t
~paC'
MUNICIPAL PROPERTY ASSESSMENT CORPORATION
September 19, 2005
To:
Heads of Council
2 2 20G5
OF
" "W'<'1!'~l\"IU~
"A"i:\\:'i~ i f'e~ i !WE;;
From:
Debbie Zimmerman
Chair, MP AC Board of Directors
Subject:
MP AC's 2005 Annual Meeting
The Municipal Property Assessment Corporation (MP AC) will be holding its 2005 Annual
Meeting this fall at the Counties, Regions and Single Tier Municipalities, and District Social
Services Administration Boards Conference in Niagara Falls.
On behalf of the MP AC Board of Directors, I would like to invite you to attend our Annual
Meeting. During the meeting, we will provide you with an update on our key initiatives,
including the 2005 assessment update. Our Board of Directors and senior staffwill also be on
hand to speak to delegates.
The meeting will take place on Wednesday, October 19, from 8 a.m. to 9 a.m. at the Sheraton
Fallsview Hotel and Conference Centre in Niagara Falls. For more information on registering
for the conference, please contact the Association of Municipalities of Ontario directly. As
members of this corporation I encourage you to attend this meeting to meet the Directors of the
Board, and staff.
If your schedule does not permit you to attend the Annual Meeting, I would ask you to contact
MP AC staff for a copy of the materials presented. Please contact Arthur Anderson, Director,
Municipal Relations at 905 837-6993 or bye-mail atandersar@mpac.ca.
Regards,
Debbie Zimmerman
Copy MPAC Board of Directors
Carl Isenburg, President and Chief Administrative Officer
Executive Management Group
Office of the Chair c/o Municipal Property Assessment Corporation
1305 Pickering Parkway, Pickering, Ontario L 1 V 3P2
T: 905.685,3101 F: 905,831.0040
www.mpac.ca
1
Form No L5050M