1969 Suburban Road Committee
ST. THOMAS~ ONTARIO
lvfA Y 2nd. 196<) .
THE 8T. THOMAS SUBURBAN ROAD+':'COMMISSION met at the Court House ~
St. Thomas, at 9:30 A.M.
ALL MEMBERS WERE PRESENT"
ALSO PRESENT WERE~ Mr. Frank Clarke~ Senior Municipal Supervisor
Ontario Department of Highways~ Mr. A.l>1. Spriet and Mr. \~m" Kelly~ from A.M. Spriet
&: Associates.
THE MINUTES OF THE MEETING of February 27th) were read and approved.
THE ENGINEER REPORTED that arrangements had been made with,
Graham &: Graham Construction to bore under the Wellington Road to give Drainage
relief to Mr. Wm. Glenn and ai10id replacement of a portion o.f the Blewitt Drain.
THE ENGINEER ALSO REPORTED that the Needs Study Inventory on
Suburban Commission Roa.d was near completion except for Costing..
A.M. SPRIET &: WM. KELLY PRESENTED a FunctionGtl Report on the
Replacement of the Kains Bridge and answered questions.
A FIELD INSPECTION of the Site was held.
AFTER RESUMING THE MEETING:
n MOVED BY: W.E.. ROWE
SECONDED BY: JAS. HINDLEY
THAT WE APPROVE OF SCHEME "An OF THE REPORT ON THE KAINS BRIDGE REPLACEMENT", BY
A.M.. SPRIET &: ASSOCIATES, A~~ SUBJECT TO APPROVAL OF THE C~~1TY OF ELGIN AND THE
CITY OF ST. THOl>~S, INSTRUCT THE CONSULTANT TO PROCEED WITH THE PLANS FOR
REPLACEMENT OF THE KAINS BRIDGE AND NECESSARY CONNECTIONS TO THE EXISTING ROADS.
CARRIED"
MR. SPRIET PRESENTED the Commission with a pl,ieture of the St. Geo~8e
Street Bridge, and was thanked by the Chairman on behalf of' the Commission.
THE MEETING ADJOURNED to the call of the Chstirman.
{(. W' ~Jl.
---...-..h,.
CHAIRMAN
ST. THOMAS ONTARIO
FEBRUARY 27, 1969.
THE ST. THOMAS SUBURBAN ROAD COMMISSION met at the Court House,
St. Thomas, at 4:00 P.M. on February 27, 1969.
ALL MEMBERS WERE PRESENT.
THE MINUTES OF THE ~'1EETING 0 f February 4, 1969 were read and
approved.
THE CHAIRMAN REPORTED that he had met with thE! County Road
Committee who had sugge$ted that a meeting be held with the City of St. Thomas
to request extra funds for the construction 0 f Kains Bridge.
Subsequently a meeting was held with Hayor Fanjoy and 1tJarden Wise..
CORRESPONDENCE AS ATTACHED, to the Mayor from the Engineer was
read.
IT WAS REPORTED that City Council had approved the principle
of an extra grant to the Commission for the bridge.
THE ENGINEER PRESENTED the attached Budget havlng been amended
to take into consideration the construction of the bridge.
"MOVED BY:
SECONDED BY:
W. E.. ROWE
JAS. HINDLEY
THAT THE STATE'HENT OF EXPENDITURES FOR ,THE ST" THOMAS SUBURBAN ROAD COMMISSION
FOR 1968 BE FORWARDED TO THE COUNTY OF ELGIN AND THE CTTYOF ST. THOMAS.
CARRIED"
"MOVED BY:
SECONDED BY:
JAS. HINDLEY
W. E.. RONE
THAT THE ESTIMATES OF THE ST. THOMAS SUBURBAN ROAD COMMISSION FOR 1<)69 AMOUNTING
TO $ 155,500. AS PREPARED BY THE ENGINEER, BE APPROVED AND FORWARDED TO THE
COUNTY OF ELGIN AND THE CITY OF ST. THOMAS FOR APPROVAL.
CARRIED"
"MOVED BY:
SECONDED BY:
W. E. ROWE
JAS. HINDLEY
THAT WE APPOINT THE FIRM OF A. M. SPRIET AND ASSOCIATES TO PROCEED WITH A STUDY
FOR THE REPLACEHENT OF THE KArNS BRIDGE SUBJECT TO THE APPROVAL OF THE COMHISSION'S
BUDGET BY THE CITY OF ST. THOMAS AND THE COUNTY OF ELGIN.
CARRIED"
ST. THOMAS, ONTARIO
FEBRUARY 27, 1969
PAGE
2
THE MEETING ADJOUHNED to the call of the Chailrman.
(2_w,~_
C HAl RMAN
. ST. THOMAS, ONTARIO,.-
FEBRUARY, 1969.
TO THE CHAIRMAN AND MEMBERS OF THE
ST. THOMAS SUBURBAN ROAD COMMISSION
ATTACHED TO MY ANNUAL REPORT to the Commission is a Statement
of Expenditures on the Commission Roads in 1968, and Estimates of
Expenditures for 1969.
THE MILEAGE OF ROAD UNDER CONTROL of the Commission has not
varied in several years, being 22 miles of which 1.15 m.iles (Road 30)
is gravel and the remainder paved.
In 1968 Road Maintenance on the Commission Syitem was estimated
at $ 36,500 and $ 36,362.17 actually expended. Construct.ion on Road 16
in Fingal,was estimated at $ 29,000, and $ 31,172.19 ac.tua11y spent.
THE DEFICtT TO THE CITY OF ST. THOMAS was reducE!d from $3,129.
There is still a small amount of concrete work and trinmingwork left.
at the beginning of the year to $ 663. at th~ end of the' year:
Although this is a quite managab1e figure it is hoped to reduce this
deficit to zero at the end of the year.
As in previous years, maintenance of the System will take the
largest share of Commission budget. Winter Control cOlats are expected
to be heavy.
A surface treatment should be applied to Road 2:5 (Wellington Road)
this sununer. If money is available, several miles of Road 16 (Fingal Road),
west of Middlemarch should be treated.
As there is no longer a Winter Works Programme, funds for removal
of dead trees on the System have been shown in the Mai'ntenance Category.
Other Categories will show. normal expenditure.
AS THE ONTARIO DEPARTMENT OF HIGHWAYS has placed a limit as to the
amount of money available for maintenance, some larger items of work
usually ,classified as maintenance will have to be placed into Constt"Uction.
Thus, one half of the estimate for Superintendence and Overhead, has been
charged to COTlstruction. Drainage assessments for ne", drains will also be
charged to Construction.
DRAINS TO BE UNDERTAKEN THIS YEAR by the Townships of Yarmouth and
Southwo1d, include the Thompson and Baker-Penhale on Road 30, and the
Underhi 11 Extension on Road 25.
IT WILL BE NECESSARY to bore under Road 25 (Wellington Road) to
provide an outlet for the William Glenn property as provided for under
TO THE CHAIRMAN AND MEMBERS OF THE
ST. THOMAS SUBURBAN ROAD COMMISSION, continued
PAGE
2
tbe conditions of the Rapelje Drain Report.
Completion of work on Road 16 in Fingal is estin~ted at $3,000.
Approximately $ 12,000 must be provided for Land Purcha!~e for th." Parkins
property on Road 26 S .A. Nominal Land Purchase Funds al~e provided for
other projects the Commission may wish to undertake.
UNCOMMITTED FUNDS are estimated at $ 17,000 (Rolads) or $ 42.500
(Bridges). The Commission should make an early decision as to their
Construction Work so that Surveys and Plans may be obtained as soon as
possible.
ALL OF WHICH IS RESPECTFULLY SUBMITTED:
{2/J 1r;~ -
R. G. MOORE, P. ENG.,
ST. THOMAS SUBURBAN ROAD COMMISSION
ENGINEER.
ST. THOMAS SUBURBAN ROAI> COMM.ISSIO'N
STATEMENT OF 1~68 EXPENDITURES
CONSTRUCTION:
BRIDGES AND CULVERTS
ROADS
Pipe Culvert Construction Road 16, Fingal $ 2,422.14
Grading, Granular Base, Urban Work,
Paving, etc. Road 16, Fingal
Fencing (Road 25)
Surveys & Traffic Counts, etc.
Land Purchas. (Rent from House on
St. George Street)
3,1,172.19
325.19
28.77
Credit 250.00
MAINTENANCE
Bridge & Culvert Maintenance
ROAD MAIl\1TENANCE AND OVERHEAD
Winter Control
Surface Treatment
Repairs to Pavement
Roadside Maintenance
Gravel Resurfacing, Grading, Dust Control
Weed Control
Brushing
Pavement Marking
Signs
Drainage and Drainage Assessments
Railroad Protection
Superintendence, Clerical and Overhead
ITEMS NOT FOR SUBSIDY
Committee Member Fees and Expense.
Ontario Good Roads Association Membership
Suburban Road Commission ASlociation
Membership
Weed Spray and Road Liability Insurance
Annual Meeting of Suburban Road Commission
Association
WINTERWORKS PROGRAMME
Br11shing
TOTAL EXPENDITURE FOR 1968 ON ST. THOMAS
SUBURBAN. ROADS
300.06
8,472.16
1l0,628;25
2,812.82
1 , 816. 22
868.98
1,012.61
946.17
1,050.98
172.85
363.59
513.67
7.703.&7_
610.00
20.00
10.00
31.79
208.65
$ 2,422.14
31,276.15
300.06
36,362.17
880.44
425.65 425.65
$ 71.666.61
AMOUNT PAYABLE BY THE CITY OF ST. THOMAS
CONSTRUCTION
BRIDGES & CULVERTS 10 % of $ 2,422.14 $ 242.21
ROAD CONSTRUCTION 25 010 0 f 31,276.15 7,819.04
BRIDGE & CULVERT
MAINTENANCE 10'0 0 f 300.06 30.01
ROAD MAINTENANCE
& OVERHEAD 25 '0 0 f 36,362.17 9,090.54
ITEMS NOT SUBSIDIZED 50 '0 0 f 880.44 440.22
WINTE RWORKS 12 \10 0 f 425.65 53.21 $ 17.675.23
PAID BY THE CITY OF ST. THOMAS
1/2 Mill Provided
20,140.45
~ Deficit for 1967
3.129.13
17,011.32 17,011.32
Less Amount Payable by the City
of St. Thomas
17,675.23 17.675.23
DEFICIT TO 1969
$ 663.91
ST. THOMAS SUBURBAN ROAD COMMISSION
1969
ESTIMATES
Dra ft i, 2
Y e b ru a ry .2 7 ~,J.?^~2
CONSTRUCTION - BRIDGE & CULVERTS
ROADS
Kain's Bridge- Engineering and
start of Construction
Completion of Work on Road 16
in Finga1
Drainage Assessments ( Const. )
Drainage, Road 25
Land Purchase
Superintendence & Overhead
Total of Construction
ROADS MAINTENANCE
TOT ALS
--
Winter Control
Surface Treatment
Repair to Pavements
Weeds and Brushing
Grading, Roadside Maintenance
Dust Control
Pavement Marking, Signs, Railroad
Protection, Guide Rail
Drainage
Superintendence, Overhead
Bridge & Culvert Maintenance
Total Maintenance
Items Not For Subsidy
Construction
Maintenance
Items For Subsidy
SHARE OF THE CITY OF ST. THOMAS
1/2 Mill from The City of St. Thomas
will provide (City Assessment
$41,433,270)
Extra Grant from City of St. Thomas
Re - Kains Bridge
Less De ficit from 1968
Less Estimated Cost of Work to City
SURPLUS TO 1970
CITY SHARE
$
$
92, :500
9,250
3,000
2,500
1.000
13,500
4,000
$ 24,000
6,000
$ 116,:500.
$ 15,250.
$ '. 9,000
'10,000
3,500
3,000
2,500
3,000
1,500
4,000
$ 36,500 $ 9,125.
---1..s 500 150.
$ 38,000. $ .,.1.t 2 7 5 .
---
-hOOD. 500.
-- --
$ 116,500 $ 15,250.
38,000 9,275
_-1..t.OOO 500.
$ _155.~ $ 25t025~
....._'....."'_._~-
S 20,716.00
2..,.000.00
$ 25,716.00
663.91
$ 25,052.09
1.2., 02 5 ~qQ
$ 27.09
NlOItMAN J. CHAPI.OW
~~'STAN"TO . 'HEINGINO.
4'NI>> coNS'rR&(tTION SAFm
INSPECTOR
. "."'.""ON8 $31.5880
COU....MOU.lllt.
.........~...~.. P.ENG.
.... ...... .............,.
aT.THOMASfONT.
JIa.rCl" ......~ ...O.ttaajoy.
Q1ty' ..1113...1,
, St. .Tb.C)JDa..In't.:r:i..'~ '
.";i,~. .'fl.tQ~$ . ~~1?~\lIll~..Q'~ .CQ~l~~$;P~
.I\lclge~~ .1969
J'eb.21, .1969
~'lett.rt8**~ten to confll'1f10~Conv..rsa,t'ion ot.Ji'ebruary
19,betwe.nYa~,aJ.>"lse, 1. Auck1~D.d,Chairman Oil the St. Thomas
SUbur'bfl1'1hQ.C;...~,.l.., yourself anfilllyself', and a meeting ot
February 27 'I)etw...> L. ..House, City Engineer, and my'selt.
Th..St. "..~....8uburb8n RoadComm1s~1c)11,,1sd.s1rous of replac-
ins ';11e ..liinsBriq.e1n 1969 and 1970.Ulltortun,te:ly,runds
I.vailab1eto",t1e.ColIJQsstonfromthe Cltyl!2:Mlll (estimated at
~20, 716tnl?~')to_.'i.rwith a similars"Wllt~Qm the County and
Department >of'Highw.Y8subsidydo not pr'evide.su.f'.ficient funds
tor the replacemeR'tol..this bridge in 196~and 19701.
TheC.u18.:i.oll,be,sides its usual maintenanee,is committed
to cQltpl.t~onot several small items of worle totalling approximat~
elYIJO,500.. Inadditlon,property was. pur-chased late last year
onS'..G.orC8. Str..tto provide fora further underpass under the
'ealladla~Jati()llallalllf.:Y. This item has to be included in the
eo_~,.lon Bud.get fer 1909.
%1;-:1.8 . e.tillat$dt_at approximately $40,000 would be available
'thi.~earto cOmJIe:nceconstruetionontheBridge, and that $80,000
wOu.J.d.;-'t)& ..IlTailable in 1?10.,As ..it would appear that the Cost of
aei>laic,..entotICa1ns Br118e m1ghtbe in the order ot$22;,OOO, it
wC)\1l.d.a,pearthatapproxiMtely$lOO,000 wolild be needed. On the
baal.ot an.8~J).I.O.8ubsid.y,theextracost to the County and City
woula~,.approx:l._telY'lO,OO()each. We would suggest that this be
d.ivide. over a two yearper:l.od(1969 and 1970)"
If. the bu11d.1ngotthe Br1dgemet the approval of all concerned
EnI1ne,r1nl St.dies would proceed immediately, with the intention
ot ca.l1i81 'rend.ers in late summer. City C<'ttncil would be kept
informea <:I.t all deveJ.,opments and their expr.ess approval requested
before the cl\111ng ot T81lders.
IE .further 1n.format1on 18 required, we would ble pleased to
. attempt to provide it.
Yours very truly,
RGM/fm
C.C. : J. Wise
A. Auckland
L. House
.. ~..G~~e:1Z~.tng.J
Engin-eer and Road l:3uperintendent
ST. THOMAS ONTARIO
FEBRUARY 4, 1969
THE ST.. THOMAS SUBURBAN ROAD COMJv1ISSION met at the Court
House, St. Thomas, at 10:00 A.M. on February 4, 1969.
"MOVED BY: J. HINDLEY
SECONDED BY: W. E. ROWE
THAT A. AUCKLAND BE CHAIRMAN OF THE ST. THOHAS SUBURBAN ROAD COMMISSION
FOR 1969.
CARRIED"
THE MINUTES OF THE MEETING of July 10, 1968 were read and
approved.
THE ENGINEER REVIEWED the maintenance position of the
Commission to date.
The latest location for the St. Thomas By-pass was discussed.
"MOVED BY: W.. E.. ROWE
SECONDED BY: J. HINDLEY
THAT THE HONORARIUM FOR COMMISSION MEMBERS BE $150.00 AS LAST YEAR.
CARRIED"
"MOVED BY: .J. HINDLEY
SECONDED BY: W. E. ROWE
THAT THE MEMBERSHIP FEE OF $ 20.00 FOR THE ONTARI.O GOOD ROADS ASSOCIATION
BE PAID.
CARRIED"
"MOVED BY: W. E. ROWE
SECONDED BY: J. HINDLEY
THAT THE MEMBERSHIP FEE OF $10.00 OF THE SUBURBAN ROAD COMMISSION ASSOCIATION
BE PAIDE.
CARRIED"
PROVIS ION IN THE 1969 BUDGET for purchase 0 f the Parkins'
House on St. George Street was discussed.
ST. THOMAS ONTARIO
PAGE
2
FEBRUARY 4, 1969
"MOVED BY: VI.. E. ROWE
SECONDED BY: J. HINDLEY
THAT THE PURCHASE OF PARKINS' HOUSE ( 117 ST. GEORGE STREET) BE INCLUDED IN
THE 1969 BUDGET.
CARRIED"
THE ENGINEER REPORTED that it would be nE!CeSsary to bore
under Wellington Road to provide a drain outlet for the 1amd of Wm. Glenn
as provided for under the Drainage Report on the Rapelje Branch of the Glenn
Drain.
"MOVED BY: J. HINDLEY
SECONDED BY: W. E. ROWE
THAT WE PROVIDE A DRAIN OUTLET UNDER THE ROAD FROM BRANCH 3 OF RAPELJE
BRANCHES OF THE GLENN DRAIN, TO THE WEST SIDE OF WELLINGTON ROAD.
CARRIED"
THE ENGINEER PRESENTED the attached Repol~t detailing
expenditures for 1968, and a proposed Budget for 1969. Di.scttssion followed
with regards to the Commission Construction Programme for 1969, and it
was decided that Albert Auckland should meet wi,th the County Road Committee
on February 12th. to discuss the Commissions' work.
MEETING ADJOURNED to the call of the Chairman.
(lw: ~La~
/) ;{I
t~,u~O I'~ S:"'f+
ST,. THOMA" ,/.- /"U/
FE ", ONTARIO ~/~ .,..
,BRUARY. 1969... '. --
TO THE CHAIRMAN AND. MEMBERS OF THE
8T. THO~1AS SUBUR.BAN ROAD COMMISSION
ATTACHED TO MY ANNUAL REPORT to the C01.'nl'nission is ~:l Statement
. of Expenditures on the Commission Roads in 1968, and Estimates of
Expenditures for 1969.
THE MILEAGE OF ROAD UNDER CONTROL of the Commission has not
varied in several years, being 22 miles of which 1.15 miles (Road 30)
ts gravel and the remainder paved.
In 1968 Road Maintenance on the CommisaionSystem was esti,mated
at $ 36,500 and $ 36,362.17 actually expended. constructicm on Road 16
in Fingal,was estimated at $ 29,000, and $ 31,172.19 actually spent.
There is still a small amount of concrete work and trimmlng work left..
THE DEFICIT TO THE CITY OF ST. THOMAS was reduced from $3,129.
at .the beginning of the year to $ 663. at the end of the year.
Although this is ill quite managable figure it is hoped to reduce this
deficit to zero at the end of the year.
As in previous years, maintenance of the System \tlrill take the
largest share of Commission budget. Winter Control cost.s are expected
to be heavy.
A surface treatment should be app1iedto Road 25 (Wellington Road)
this summer. 1 f money is available, several miles of R()ad if) (Fingal Road),
west of Middlemarch should be trea~ed.
As there is no longer a Winter Works Programme, funds for removal
of dead trees on the System have been shown in the Maintenance Category.
Other Categories will show a normal expenditure.
AS THE ONTARIO DEPARTMENT OF HlGHWAYS has placed a Itmit as to the
amount of rnoneyavailable for maintenance,' some larger items of work
usually class! fiedas maintenance will have to be place~d into Construction..
Thus, one half of the estimate for Superintendence and Overhead, has been
chargedtQConstruction. Drain.age aSsessments for new drains will also be
charged t.o Construction.
DRAINS TO BE UNDERTAKEN THIS YEAR by the Townsh'ips 0 f Yarmouth and
Southwold, include the Thompson and Baker-Penhale on Road 30, and the
Underhill Extension on Road 25.
IT WILL BE NECESSARY tcbore under Road 25 (Wellington Road) t.O
provide an outlet for the William Glenn property as provided for under
TO THE CHAIRMAN AND MEMBERS OF THE
ST. THOMAS SUBURBAN ROAD COMMISSION, continued
PAGE
2
. the conditions of the Rapelje Drain Report.
, Completion of work on Road 16 in Fingal is esti.mated at $3,000.
I
Approximately $ 12,000 must be provided for Land Purch~lse for the Parkins
property on Road 26 S.A. Nominal Land Purchase Funds SLre provided for
other projects the Commission may wish to undertake.
UNCOMMITTED FUNDS are estimated at $ 17,000 (Rc)ads) or $ 42,500
(Bridges). The Commission should make an early decisic)n as to their
Construction Work so that Surveys and Plans may be obtdlined as soon as
possible.
ALL OF WHICH IS RESPECTFULLY SUBMITTED:
{?.d 1n~
R. G. MOORE, P. ENG.,
8T. THOMAS SUBURBAN ROAD COMMISSION
ENGINEER.
ST. THOMAS SUBURBAN ROAD-COMMISSION
STATEMENT. OF 1968 EXPENDITURES
CONSTRUCTION:
BRIDGES AND CULVERTS
Pipe Culvert Construction Road 16, Fing~l $ 21,422.14
ROADS
Grading, Granular Base,UrbanWork,
Paving, etc. Road 16, Fingal
Fencing (Road 25)
Surveys & Traffic Counts, etc.
Land Purchase (Rent from House on
St. George Street)
3L.172.19
325.19
28.77
Credit 250.00
MAINTENANCE
Bridge & Culvert Maintenance
ROAD MAINTENANCE AND OVERHEAD
Winter Control
Surface Treatment
Repairs to Pavement
Roadside Maintenance
Gravel Resurfacing, Grading, Dust Control
\rleed Cont ro 1
Brushi ng
Pavement Marking
Signs
Drainage and Drainage Assessments
Railroad Pro~ection
Superintendence, Clerical and Overhead
ITEMS filar FOR SUBS IDY
Committee Member 'Fees and Expenses
Ontario Good Roads Association Membership
Suburban Road Commission As.ociation
Membership
Weed Spray and Road Liability Insurance
Annual Meeting of Suburban Road Commission
ASlociation
WINTERWORKS PROGRAMME
Brushing
TOTAL EXPENDITURE FOR 1968 ON ST. THOMAS
SUBURBAN ROADS
"
300.06
a~, 472. 16
1C~, 628. 25
2,812.82
1,816.22
868.98
1,012.61
946.17
t,050.98
172.85
363.59
513. 67
?703.81-
610.00
20.00
10.00
31.79
208.65
$ 2,422.14
31,276.15
300.06
36,362.17
880.44
425.65 415.65
$ ll1666.g
ST. THOMAS SUBURBAN ROAD COMMlSS I ON
1969 ESTIMATES
CONSTRUCTION
Completion of Work on Road 16
in Fingal
$
3,000
Drainage Assessments (Const.)
2,500
Drainage, Road 25
1,000
La.nd Purchase
13,500
Superintendence & Overhead
4,000
Uncommitted Funds
if Bridges (S 42,500)
~-17 ,000
"'.-"-
$ 41,000
Total of Bridges ( 66,500)
ROADS MAINTENANCE
..-.,~-----_..
Winter Control $
Surface Treatment
Repair to Pavements
Weeds and Brushing
Grading, Roadside Maintenance
Dust Control
Pavement Marking, Signs, Railroad
Protection, Guide Rail
Drainage
Superintendence, Overhead
9,000
10,000
3,500
3,000
2,500
$
3,000
1,500
4,000
36,500
____J.l 500
~o_q
Bridge & C\llvert l-faintenance
Total Maintenance $
Items Not For Subsidy
_1,000
TOTALS
Construction
$ 41,000 $
38,000
1,000
Maintenance
I terns For Subsidy
$ 80,000
( 108,500 )
SHARE OF THE CITY OF ST. THOMAS
1/2 Mill from The r.i.ty of St. Thomas
will provide (City Assessment $ 4\,433,270)
20,716.00
Less Deficit from 1968 6~1,.!.9l
20,052.09
Less Estimated Cost of Work to City 2011025.0~
SURPLUS TO 1970
27.. 09
CITY SHARE
~
-1.g..!. 2 ~.9..!...
S
$
9,125.
___1.5 O.
~~~
500.
10,250.
9,275.
500.
$
_. 20, O~_~.=.
AMOUNT PAYABl,E BY THE CITY OF ST. THOMAS
CONSTRUCTION
BRID..9ES. &. CULVERTS 10 % of $ 2,422.14
$
242.21
!tOAD CONSTRUCTION 25 ,,, of
31,276.15
7,819.04
BRIDGE & CULVERT
MAINTENANCE 10 % of
300.06
30.01
ROAD MAINTENANCE
& OVERHEAD 25 ok of
36,362.17
9,090.54
ITEMS NOT SUBSIDIZED 50 % of
880.44
440.22
WINTERWORKS
12 \'0 0 f
425.65
_53.1L $ J.7.675.~.~
"" PAID BY THE CITY OF ST. THOMAS
1/2 Mill Provided
20,140.45
~.129.1.~
11,011.32 17,011.32
Less Deficit for 1967
Less Amount Payable by the City
of St.Thomas
17,675.23 17!675.2~
DEFICIT TO 1969
$ 663.91