01 - January 14, 2020 Budget Committee Agenda Package
Council Budget Committee
Meeting
Elgin County Administration Building
Council Chambers
January 14, 2020
1:00 – 4:00 P.M.
Agenda
st
1Meeting Called to Order
nd
2Approval of the Agenda
rd
3 Confirmation of Minutes(Closed Session)
th
4Disclosure of Pecuniary Interest
th
5 Delegations – none
th
6 Briefingsand Reports
1.Past Efficiencies
2.Homes Funding
3.Current Financial Pressures
4.Asset Management Plan (attached)
5.2020-2029 Capital Budget (attached)
6.Closed and Carry-Forward Capital Projects (attached)
7.Next Steps
th
7Other Business
th
8 Correspondence – none
th
9 Closed Session
Municipal Act Section 239 (2) (b) personal matters about an identifiable individual,
including municipal or local board employees;(d) labour relations or employee
negotiations; (k) a position, plan, procedure, criteria or instruction to be applied to any
negotiations carried on or to be carried on by or on behalf of the municipality or local
board
th
9 Date of Next Meeting
th
10Adjournment
1
4:00 pm
–
2
Budget Committee Meeting # 2
January 14, 2020 1:00
Elgin County
3
Forward Capital Projects
-
2029 Capital Budget
-
Approval of MinutesPast EfficienciesHomes FundingCurrent Financial PressuresAsset Management Plan2020Closed and CarryNext Steps
Agenda
2019
2018
2017
2016
2015
4
Other Departments
2014
Efficiencies Achieved
Homes
2013
$3.3 million achieved in last nine years
2012
2011
-
50,000
450,000 400,000 350,000 300,000 250,000 200,000 150,000 100,000
5
allenges major contributor to funding shortfall.
nding shortfall.
igher than funded.
Nursing department accounts for the majority of the fuImprovements noted from 2017 to 2018.Wages are according to the collective agreement and are hOvertime costs related to recruitment
and retention ch
2018
Capital
Other Accommodation
2017
Nursing
-
Elgin County Homes Funding Shortfall
6,000,000 5,000,000 4,000,000 3,000,000 2,000,000 1,000,000
200
180
160
140
120
100
6
Number of Beds
80
60
40
2017 WOWC Total Funding Shortfall Per Bed Cost
20
0
0
70,00060,00050,00040,00030,00020,00010,000
Funding Shortfall ($)
Debt
Home (97-160)
Average Medium
Capital
Terrace Lodge (100)
Other Accommodation
7
Elgin Manor (96)
Raw Food
Average Small
Home (up to 96)
2017 WOWC Total Funding Shortfall Per Bed Cost
Program & Support
Bobier (57)
Nursing
0
5,000
35,00030,00025,00020,00015,00010,000
Funding Shortfall ($)
1.6%0.4%0.1%0.9%2.0%
5.0%
Tax Increase
interest
Avg Annual
$1.3 million$0.2 million$0.2 million
$ 4.7 million +
increased loan
8
-
)
2029
projects added to support
-
phase Port Burwell Storm Sewer
-
Current Financial Pressures Asset Management Plan identifies needs beyond that previously planned (Bayham’s multiReplacement projectsProvincial funding impacts in Public Health, LongTerm
Care, Social Services and AmbulanceAmbulance Service enhancements neededBenefit costs could potentially rise substantially Future unknown external impacts or service needsBase IncreasePreliminary
Calculation of Total Annual Tax Increase for 2020
9
Review of Asset Management Report
Asset Management Plan
10
2029 Capital Budget
-
2020
Reserve $45.1 mil
Surplus $1.0 mil
11
Progress $7.0 mil
-
date on projects that will remain open
-
In
-
forward into 2020
to
--
Forward Capital
Spend $19.5 milWork
-
forward report on the spending
Included reports are preliminary and subject to minor changes as final invoices are received
Budget $20.5 milBudget $52.1 mil
2019 invoices are still being received through January 15 Closed report on completed projects and the estimated amount of surplus being returnedCarry-and the amount of budget to be carry
Closed and CarryProjects
12
Closed Capital Projects Report
13
Forward Capital Projects Report
-
Carry
14
PowerPoint presentation to Council and Capital Review (Jan 28)Budget Committee Review of Operating Budget and Tax Rates (Jan 28) Council approves budgets and tax rates (Feb 11)
Budget Approval Steps
REPORT TO
FROM:Brian Lima, Director of Engineering Services
Jim Bundschuh, Director of Financial Services
DATE:January 7, 2020
SUBJECT:2019 Corporate Asset Management Plan – Transportation Network
RECOMMENDATION:
That the reporttitled “2019 Corporate Asset Management Plan – Transportation Network”
dated January 7, 2020, be endorsedand that staff be directed to proceed with the
Plan as outlinedin support of budget development.
INTRODUCTION:
Public infrastructure is central toour prosperity and our quality of life. The majority of
public infrastructure in Canada is the responsibility of municipal government. Adequate
municipal infrastructure such as roads, bridges, and underground water and sewage pipes
are essential to economic development, citizen safety, and quality of life. Well maintained
infrastructure is critical in sustaining a municipality as an attractive place to live and do
business.
Asset Management is the process of collecting a variety of data and information regarding
municipality assets and infrastructure, and using all of that data and information to make
the best long-term decisions in regards to building, operating, maintaining, renewing,
replacing, and disposing of those assets.
In December 2017, Ontariobecame the first Canadian province to pass regulation that
requires municipalities to engage in asset management planning. Ontario Regulation
588/17 requires all municipalities prepare Council-endorsed Strategic Asset Management
Policies by July 1, 2019, and implement Asset Management Plans using a phased
approach from 2021–2024. The County is positioned well to comply with this regulation.
The County is now in the midst of a multi-year comprehensive Corporate Asset
Management Plan (CAMP) development approach to improve its asset management
practices and processes. The County’s updated CAMPprepared by staff first focuses on
the County’s transportationnetwork (roads, structures, and traffic), and is presented to
Council for endorsement.Future Plan updates will also incorporate the remaining County
assets (facilities, information technology, etc.).
DISCUSSION:
The Countyis responsible for the provision of a diverse array of transportation network
services whichare dependent infrastructure assets valuedat approximately $831 million.
An integral component of ensuringreliable service is creating an effective approach to
managing existing and futuremunicipal assets. Effective asset management aims to
manage assets in a way thatbalances levels of service, risk, and cost effectiveness
throughout the entire assetlifecycle. Ultimately, adopting effective and comprehensive
15
asset managementstrategies across the organization will support the long-term
sustainability andefficiency while maintaining levels of service.
The Countyproduced its first CAMPin 2014, whichdetailed the County’s key objectives
for asset managementand focused only onits transportation network, and established a
baselinethat the Countyhas built upon in itslatest updated Plan.
In2019 staff collected additional transportation focusedasset information in order to
recommendthe best infrastructure investment decisions to Council. Ontario Regulation
588/17 has prescribed specific informationrequirementsto be included in a municipality’s
asset management plan.
Detailed inventory data, condition ratings and financial investment strategies previously
approved by Council were compiled into thecomprehensive CAMP.The implementation
of acentralized working software database and enterprise geographical information
system (GIS) also forms part of the CAMP’s recommendationand is foundational tothe
success of municipality asset management programs.Using asset location, staff will have
the ability to centralize asset information intoa single authoritative database. Recognizing
that asset location is the common denominator, implementation, administration, and use of
an enterprise geographic information system by the County and its member municipalities
is a natural choiceto optimallyand sustainably deliver on our service objectives through
cost-effective lifecycle management of assets.
2019 Corporate Asset Management Plan Summary
The updatedCAMPsets out how the County’s assets will bemanaged to meet levels of
service consideringa full lifecycle approach, andensuring long-term financial
sustainability. The CAMP representsa jumpforward in the County’s asset management
journey, and will continually be improved and updatedas new data is collected, and as the
field of asset management grows and develops.The CAMPcovers the County’s asset
management program at a high-level, identifyinggaps and opportunities, and it outlines a
work plan for continual improvement asthe program matures.
The purpose of the CAMPis to:
Ensure that the County is well-positioned for current and future grant programs and
regulations, by meeting the requirements of Ontario Regulation 588/17.
Establish a baseline of current asset management practices to inform a work plan
for continually improving asset management.
More accurately quantify the infrastructure deficit and investment gap.
Demonstrate long-term asset care and sustainability.
Support the development of improved practices that clarify and justify funding
requirements.
Provide increased transparency related to the County’s asset management
practices, challenges and opportunities.
16
The CAMPis comprised of the following core sections:
Executive Summary - providing a succinct overview of the plan.
Introduction - describing the importance ofinfrastructure to municipalities, the
relationship of the asset management plan to municipal planning and budget
documents and the purpose of the asset management plan.
State of Assets - summarizing the asset types, financial accounting and
replacement cost valuation, asset age distribution and asset age as a proportion of
expected life, and asset condition.
Desired Levels of Service - defining levels of service through performance
measures, targets and timeframes to achieve targets.
Asset Management Strategy - summarizing planned actions including non-
infrastructure solutions, maintenance activities, renewal/rehabilitation activities,
replacement activities, disposal activities and expansion activities.
Financing Strategy - showing yearly expenditure forecasts broken down for each of
the planned actions in the strategy, along with actual expenditures from previous
years and yearly revenues.
State of Local Infrastructure
The state of local infrastructure section provides a quantitative assessment of the asset
portfolio in terms of overall replacement value and estimated remaining life. The following
tableprovides an inventory and overview of the replacement value of the County’s
transportation network assets.Overall, as detailed in the CAMP, the County’s
transportation network asset portfolio is currently in good physical condition. Existing
approved budget funding shortfalls in all asset groups will result in a degradation of all
transportationassets over the next decade, and will increase the infrastructure gap to
approximately $47 million,derived mainly by the roads which composes about 89% of the
Infrastructure Gap.
Asset TypeAssetInventoryUnitReplacement Value
Major Arterial31.3km$ 26,300,606.30
Roads
Minor Arterial274.94km$ 271,974,721.19
Collector354.24km$ 321,034,428.00
Local Road15.93km$ 12,188,701.29
Suburban Link12.34km$ 12,206,910.81
Bridges58Ea.$ 122,732,694.00
Structures
Culverts (greater than 3m 84Ea.$ 56,496,425.00
span)
Pedestrian Tunnel2Ea.$ 300,000.00
Retaining Walls4Ea.$ 3,500,000.00
Street Lighting36Ea.$ 140,883.84
Traffic
Traffic Signs~7,725Ea.$ 1,737,112.49
Signals & Beacons33Ea.$ 2,200,000.00
TOTAL$ 830,812,482.92
For a full description of the results of the State of Local Infrastructure analysis, and
procedures, please refer to a copy ofthe2019 Corporate Asset Management Plan
17
attached.
Desired Levels of Service
One of the objectives of asset management planning is to ensure that theperformance
and service provided by the assets meet the needs and expectationsof the community. A
level of service is a criteria set by the organization for thequality and performance of the
services provided. Levels of service typically relateto quality, quantity, reliability,
responsiveness, environmental acceptability andcost. Well-defined levels of service are
used to:
Inform stakeholders ofthe current level of service provided and any proposed
changes to level of service and associated costs;
Measure performance against these defined levels of service;
Identify the costs and benefits of services; and
Enable stakeholders to consider the level of service provided within the context of
affordability.
Lifecycle Management Strategy
Many Countydepartments and community stakeholders are involved in various aspectsof
each asset’s lifecycle. Often those responsible for delivering the service will identify the
need for new assets. An asset will be acquired or constructed. The assetthen is operated
and maintained on an ongoing basis until rehabilitation and/or renewal isrequired. As the
asset nears the end of its life, a plan is established to replace,remove or upgrade the
asset to meet future needs. These activities collectivelyrepresent the asset’s lifecycle. In
asset management, the focus is on using a fulllifecycle approach when planning. An asset
lifecycle management strategy is the setofplanned actions throughout the asset’s
lifecycle that allows the asset to providedesired levels of service in a sustainable way,
while managing risk, at the lowestlifecycle cost. Section 5 of the CAMPhas regard for key
initiatives for each asset system related to the following potential lifecycle activities:
Non-infrastructure solutions: actions or policies that can lower costs or extend asset
life (e.g. better integrated infrastructure planning and land use planning, demand
management, insurance, process optimization, managed failures).
Maintenance activities: including regularly scheduled inspection and maintenance,
or more significant repair and activities associated with unexpected events.
Renewal/rehabilitation activities: significant repairs designed to extend the life of the
asset. For example, cold-in-place asphalt recycling.
Replacement activities: activities that are expected to occur once an asset has
reached the end of its useful life and renewal/rehabilitation is no longer an option.
Disposal activities: the activities associated with disposing of an asset onceit has
reached the end of its useful life, or is otherwise no longer needed bythe
municipality.
Expansion activities: planned activities required to extend services topreviously un-
serviced areas, or to expand services to meet growthdemands.
18
Financing Strategy
Long-term asset investment forecasts provide insight into prospective investment
requirements which may fall outside of the 10-year planning period typically used in
capital budgeting. Significant asset construction during a short time span, as seenin the
1960sand 1970s, will require equally as heavy investment once those assets reach the
end of their service lives. If those investment requirements are not addressed
appropriately, levels of service could potentially decline and operations andmaintenance
costs could increase.
The CAMPutilized a 10-year forecast. In future, the implementation of an asset
management software focused enterprise database toolset utilizing a 100-year forecast
whichcovers the entire lifecycle of the assets, will provide greater certaintyand
identification of suchaforementioned trends.
One of the key opportunities identified during the development of the strategy isthe
requirement for evaluating funding scenarios to address the overall needs. Thisrequired a
review of current infrastructure financing policies, reserve accountanalysis, and revenue
sources to identify the optimal funding scenarios aligned withre-investment requirements.
Updates are to be included in future reporting toCouncil.
Improvement Monitoring and Next Steps
One of the goals of the CAMPwas to re-establish a baseline ofcurrent asset management
practices to inform a work plan for continuousimprovement of the asset management
program. Any assumptions made andopportunities identified have been documented to
serve as the basis for continuousimprovement. The Planpresents a proposed continuous
improvement program interms of two components:
1.Actions related to improving future asset management plans; and
2.Actions to advance the County’s overall asset management capabilities.
Consultation
Consultation and communication are key elements of planned corporate asset
management initiatives. The Asset Management Policy endorsed by Council in 2019
outlines annual reporting toCouncil on the Corporate Asset Management progress.In
addition, an AssetManagement webpage on the County’s website will becreated
providing access to a copy of the AMPandAsset Management Policy,provide an
overview of assetmanagement fundamentals, andaccess to otherrelated documents.
CONCLUSION:
Asset management provides a mechanism for reliable, repeatable and transparent
decision making. However, asset management is more than just a one-off project.To
realize the full benefits of asset management, the principles should be
systematically developed, embedded and integrated across all departments, and be
continuously improved.
Taking a holistic approach to asset management has clear benefits to thecommunity
and the County, including:
19
Helping protect and enhance the quality of life in Elgin County by ensuring the
best possible decisions regarding our assets.
Aligning teams, processes and resources across the County towards common
asset management objectives;
Supporting evidence-based business cases for budgets and long-term financial
forecasts;
Driving longer term thinking and planning; and
Supporting financial sustainability.
Using consistent asset management guidelines and principles withan effort placedon
continuous improvement will lead to an optimized balance between assetperformance
and asset risks that will create real value for Elgin County and itsresidents.
All of which is Respectfully SubmittedApproved for Submission
Brian Lima Julie Gonyou
Director of Engineering Services Chief Administrative Officer
Jim Bundshuh
Director of Financial Services
20
2019
CORPORATE ASSET MANAGEMENT PLAN
TRANSPORTATION NETWORK
ES -i
21
Executive Summary
1.0Introduction
Public infrastructure is central to our prosperity and our quality of life. The majority of public infrastructure
in Canada is the responsibility of municipal government, and most people take for granted the important
role of these assets. Adequate municipal infrastructure such as roads, bridges, and underground water and
sewage pipes are essential to economic development, citizen safety, and quality of life. Well maintained
infrastructure is critical in sustaining a municipality as an attractive place to live and do business.
Asset Management is the process of collecting a variety of data and information regarding municipality
assets and infrastructure, and using all of that data and information to make the best long-termdecisions in
regards to building, operating, maintaining, renewing, replacing, and disposing of those assets.
In December 2017, Ontario became the first Canadian province to pass regulation that requires
municipalities to engage in asset management planning. Ontario Regulation 588/17 requires all
municipalities prepare Council-endorsed Strategic Asset Management Policies by July 1, 2019, and
implement Asset Management Plans using a phased approach from 2021–2024. The County of Elgin
(County) is positioned well to comply with this regulation.
The County is now in the midst ofa multi-step, multi-year approach to improve its asset management
practices and processes. This document is the County’s updated Asset Management Plan (AMP)prepared
by staff which first focused on the County’s road network and structure inventory.
1.1 Purpose ofAssetManagement Plan (AMP)
The AMP plays an important part by communicating to residents and stakeholders the reasons why new
assets, or modifications to existing assets, are required. The AMP also provides further details on why
modifications are required, how the County intends on continuing to deliver the services by relying on safe
and reliable assets, and how the County intends on funding the required investments in a manner so as to
remain financially sustainable.
The County has an array of strategic, long-term planning documents that complement each other and work
together to direct Elgin County’s future. Some examples include the County’s Strategic Plan thatoutlines
Council’s priorities, the Official Plan (OP) which sets the vision for the County’s future growth as detailed
in such documents as the Elgin-St. Thomas Cycling Master Planand the County of Elgin Roads Plan and
Policies.
Historically, these master plans have dealt exclusively with future needs without considering their funding
requirements, nor the rehabilitation needs for existing infrastructure.
The AMP captures information prepared for various uses, by a number of different groups within the
County, and transforms that information into asset-specific measures or actions that the County is actively
taking or pursuing to provide residents, businesses, and visitors the services at levels that correspond to the
fees and taxes they pay.
Demonstrate responsible management of the asset portfolio;
Communicate and justify funding requirements;
ES -ii
22
Demonstrate how Levels of Service (LOS) are being met in an effective and efficient manner;
Demonstrate that due regard is being given to the long-term stewardship and sustainability of the
asset base;
Demonstrate the commitment that assets will be maintained such that the services are following
regulations; and
Comply with Ontario’s Ministry of Infrastructure requirements as detailed in the ‘Guide for
Municipal Asset Management Plans’.
1.2 Core Service Areas
The County of Elginis a complex service delivery organization with responsibility for managing public
assets that support a very large array of different services.
To fulfill its obligations of service delivery to the municipality, the County must ensure that the assets
supporting these services are managed in a way that balances service levels, risk, and affordability. These
assets require significant ongoing investment in operation, maintenance, and renewal activities to ensure
they are kept safe, structurally sound, and fit-for-purpose to support the delivery of services.
For the purpose of asset management, the County has identified 15different services provided to residents,
businesses, and visitors. These services are well aligned to the provincially defined Financial Information
Return (FIR) reporting requirements.The FIR reporting requirements have been established for comparable
financial reporting across the province, whereas the services identified below are grouped to facilitate asset
management from a service to client perspective.
In several cases, the services identified in Table 1 below are further subdivided into more specific services
but generally rely on similar asset types to support the delivery of that service.
The existingCounty infrastructure within the road network includes 59 roads, which are further divided
into a total of 248 unique road classification sections, totaling 689kilometers. The condition of the road
network is important in determining the needs of the overall network. The County maintains a system to
determine the condition of the road sections in their network, by means of a Structural Adequacy Rating
(SAR) attributed to each road section within the network. An updated overall network condition was
determined in the Spring through the consideration of the SAR rating attributed to each section in
combination with the length of that section as a portion of the entire network. The generally good condition
of the majority of the road sections results in an average current condition of the road network of
approximately 14.9 out of 20. Thisvalue indicate that the road network currently provides a fairlevel of
service to the residents.
Bridge and culvert infrastructure in the County considered within the AMP arecomprised of those
structures which arethree meters in size or larger. This included analysis of 58bridge structures, and 84
culvert structures. When a bridge is inspected in detail every 2 years, the trained inspector reviews and rates
each bridge component. These ratings are used to determine the bridge's current value on the Bridge
Condition Index(BCI).The County uses the BCIto plan maintenance and repairs. Approximately 62% of
County’sbridge and culvertstructuresare in good condition. Alternatively,it can also be viewed that
County structures have approximately 33% of their lifespan remaining.
ES -iii
23
Without asset management tools, it is almost impossible to determine the long-termeffect of inadequate
budget allocations. Yet, it is important for a municipality to determine if the current level of funding is
appropriate to continue to provide an adequate level of service to its residents. It is also essential to allocate
adequate funding to ensure sustainability of the assets in the future. For the County, the value of the road
assets was estimated at approximately $831 million.The value of the bridge and culvert assets was
estimated at approximately $122.7 million for bridges, and approximately $56.5 million for culverts,
totaling over $179 million.
Current Needs Summary
The current needs for the County road network are mostly based on the condition of the road, or where it is
deemed practical and cost-effective, in association with needsor additional requirements. It is estimated
that an average annual capital investment of $16,591,976 (including an assumed 2% inflation)will be
required to maintain the transportation network (roads, structure, and traffic) in good condition. This annual
expenditure represents a total investment of approximately $166 million over the next 10 years (2020-
2029).
The current needs for the bridges were determined having taken into consideration the rehabilitation and
needs recommendations identified within a biennial OSIM report for each structure, in addition to the year
of construction or last replacement of each structure and the life expectancy. It is estimated that $24,221,378
is required over the next 10 years to improve the overall County bridge inventory condition. Continuation
of thebiennialOSIM inspection is anticipated toresult in spreading that amount over a number of years
based on actual field inspection.
The County has identified the following bridge projects to be undertaken in 2020.
2020 Bridge Projects
NetworkProjectLocation Expenditure
BridgesB01 –Bothwell Bridge Rehabilitation–Detailed DesignWest Elgin $100,000
(partnership with Middlesex Countyand Chatham-Kent)
BridgesB18 –St. George Street Bridge Rehabilitation Central $310,000
Elgin
(partnership with City of St. Thomas)
BridgesB19 - Port Bruce Bridge ReplacementMalahide$5,150,000
(senior government funding in the amount of $4,166,500 has
been announced).
BridgesB24 –Meeks Bridge Replacement –Municipal Class Southwold$250,000
Environmental Assessment & Detailed Design
BridgesB92 - Kimble Bridge ReplacementSouthwold$480,000
BridgesB99 –King George IV Lift Bridge RehabilitationCentral $6,070,000
Elgin
Asset Management Strategy
Road Network
The road network asset management plan was developed using the information and strategies currently in
place at the County. The plan provides detailed information regarding the projects planned for the upcoming
ten years. The first 5 years of the plan include a breakdown of specific projects attributed to each year.
ES -iv
24
The sixth to tenth years within the plan do not distinguish between individual project years, instead allotting
a lump anticipated expenditure of $86,824,635 for selected projects.The following figure shows the
anticipated expenditure anticipated for road rehabilitation for the 10-yearscenario, including an assumed
even division of the lump expenditure over years 2025-2029, as blue colouredbars.
The red colouredbars are representative of the budgeted expenditures by the County for bridge and culvert
works. The total allocated budget is based on a summation of the two values.
10-Year Annual Estimated Expenditure for
Transportation
Network Rehabilitation
$90,000,000
$80,000,000
$70,000,000
$60,000,000
$50,000,000
$40,000,000
Bridges & Culverts
$30,000,000
Road Network
$20,000,000
YEARLY EXPENDITURE
$10,000,000
$0
202020212022202320242025-2029
YEAR
The budget allocated for bridges and culverts is shown for visualization of the entire budget breakdown.
Further detail regarding the usage of the structures portion of this budget is given in Section 5.2. It is
anticipated that in each of the upcoming ten years of projected infrastructure expenditures that
approximately $11.5millionto $16.9 millionwill need to be spent to address needs on the transportation
network.
Using future asset managementplanning software, itwill bepossible to analyze the infrastructure needs
into the future, and the impact of allocated funding on the overall network condition. In the interim, a
projected capital plan was developed to ascertain a high-levelunderstanding of the anticipated expenditures
and associated overall road network performance. Assumptions were made to simplify the County planning
process to create a reasonable representation.
Bridges and Culverts
The short-term asset management plan developed by County staff for the bridges and culverts was done
having consideredthe remaining life, replacement cost, and recommended rehabilitation actions for each
structure; and developeda schedule and anticipated yearly expenditure for a ten-yeartimeframe.
The figure below shows the capital expenditure anticipated for bridges and culverts based upon the age and
ES -v
25
life and although replacement of these bridges is identified, the plan proposes to continue to rehabilitate as
recommended in the OSIM report to extend their service lives rather than complete replacement at a
significantly higher cost.
10-Year Annual Capital Expenditures for
Bridges and Culverts
$12,000,000
$10,000,000
$8,000,000
$6,000,000
Culverts
Bridges
INVESTMENT
$4,000,000
$2,000,000
$-
202020212022202320242025-2029
YEAR
Financing Strategy
The County has identified revenue sources that will support the Asset Management Plan (AMP) developed
through this report. The funding sources include:
Property Tax
Federal Gas Tax (FGT) and Ontario Community Infrastructure Fund (OCIF) base funding
Grants and other one-time funding sources
New TaxBase
Reserve/Debt Financing
The proposed 2020 ten-year plan is being modified to assume that $1.3 million in OCIF will continue in
perpetuity, thereby increasing funding to the plan by $8 million. A one-time top-up of FGT of $1.6 million
was received in July 2019 and will be applied to fund the infrastructure plan.The County, where applicable,
will also seek Federal and Provincial funding through competitive grant programs, resulting in a potential
funding source.
The draft 2020 ten-year plan will allocate a quarter of the incremental tax revenue received from growth
resulting in new property assessment (growth assumed to average a conservative 1% annually) to fund
infrastructure, providing $1.1 million in funding.
The $46 million increase in investment proposed in Asset Management Plan will only partially be funded
by increases in the ten-year plan to OCIF, FGT and assessment growth net of interest payments, leaving a
shortfall of approximately $40 million. A gradual increase of property tax by an incremental 1.6 % over
ES -vi
26
ten years will provided the necessary funding. Debt will need to increase by an estimated $25 million to
fund the upfront investment until gradual measured increases in property tax provide ongoing stable
funding. These estimates will be refined as part of the development of the 2020 budget expected to be
completed by February.
ES -vii
27
TABLE OF CONTENTS
Executive Summary
1.Introduction....................................................................................................................................... 4
1.1.Significance of Municipal Infrastructure .................................................................................... 4
1.2.Ontario Regulation 588/17 (O. Reg 588/17) .............................................................................. 5
1.3.County of Elgin.......................................................................................................................... 5
1.4.Development and Continuous Improvement of the AMP .......................................................... 6
1.5.Corporate AMP Scope................................................................................................................ 6
1.6.AMPLimitations........................................................................................................................ 7
2.Project Methodology ......................................................................................................................... 7
2.1.InfrastructureData Inventory ..................................................................................................... 9
2.1.1.Linear Infrastructure Inventory –RoadNetwork........................................................... 9
2.1.2.Point Asset Inventory – Bridge and Culvert Assets....................................................... 9
2.1.3.Traffic Asset Inventory .................................................................................................. 9
2.2.Replacement Costs................................................................................................................... 10
2.3.Condition Assessment.............................................................................................................. 10
2.3.1.Road Network Condition Assessment Process............................................................ 11
2.3.2.Bridge and Culvert Condition Assessment Process..................................................... 11
3.Desired LevelsofService................................................................................................................. 12
3.1.Municipality Objectives........................................................................................................... 12
3.2.O.Reg 588/17 Requirements .................................................................................................... 12
3.3.Determining Appropriate Levels of Service forElgin County ................................................. 24
4.State of LocalInfrastructure.......................................................................................................... 26
4.1RoadNetwork.......................................................................................................................... 26
4.1.1Asset Inventory ............................................................................................................ 26
4.1.2InfrastructureCondition ............................................................................................... 28
4.1.3EstimatedAssetValue................................................................................................. 29
4.1.4Current Needs Summary.............................................................................................. 29
4.2Bridges and Culverts................................................................................................................30
4.2.1Asset Inventory ............................................................................................................ 30
4.2.2Infrastructure Condition ............................................................................................... 31
4.2.3Estimated Asset Value ................................................................................................. 32
4.2.4Current Needs Summary .............................................................................................. 32
Page 1
28
5.AssetLifecycle Management Strategy ........................................................................................... 34
5.1.RoadNetwork.......................................................................................................................... 34
5.1.1.ConditionAssessment .................................................................................................. 34
5.1.2.Network Condition Lifecycle....................................................................................... 35
5.1.3.Lifecycle Management Approach ................................................................................ 35
5.1.4.Current Budget Condition Profile ................................................................................ 35
5.1.5.Optimum Budget Condition Profile ............................................................................. 36
5.2.Bridges and Culverts................................................................................................................ 37
5.3.AssetManagement Policies......................................................................................................38
5.3.1.Roads ........................................................................................................................... 38
5.3.2.Structures ..................................................................................................................... 38
5.4.AssetManagement Policies ...................................................................................................... 41
5.4.1.Approach to Data Assembly ........................................................................................ 41
5.4.2.Condition Assessment Strategy ................................................................................... 42
5.4.3.Maintenance Activities ................................................................................................ 42
5.5.AMP Update and Evaluation .................................................................................................... 42
6.FinancingStrategy........................................................................................................................... 43
6.1.County of Elgin Financing Strategy......................................................................................... 44
7.Conclusion ........................................................................................................................................ 46
References.................................................................................................................................................. 47
Page 2
29
LISTOF FIGURES
Figure 1: County of Elgin – Location Map................................................................................................... 6
Figure 2: Deterioration Model and Threshold ofAcceptability.................................................................... 11
Figure 3.1: Images of Pavement Quality Index Inspections Compared to Asset Management Condition Rating
.................................................................................................................................................................... 16
Figure 3.2: Map of County Road Network SAR Condition Rating and Level of Connectivity ................ 17
Figure 3.3: Images of Bridge Condition Inspections ................................................................................. 18
Figure 3.4: Images of Culvert Condition Inspections ................................................................................ 19
Figure 4.1: Age Distribution of Road Sections .......................................................................................... 25
Figure 4.2: Distribution of Road Surface Types ........................................................................................ 25
Figure 4.3: Road Network Condition ......................................................................................................... 26
Figure 4.4: 2020 Planned Road Network Rehabilitation ........................................................................... 27
Figure4.5: Average Age of Bridges and Culverts ..................................................................................... 28
Figure 4.6: Percentage of Anticipated 10-Year Expenditures for Bridges and Culverts ........................... 30
Figure 5.1: Graphical Representation of Lifecycle of an Asset ................................................................. 33
Figure 5.4: Annual Budgeted Expenditures for Road Network ................................................................. 34
Figure 5.5: Annual Bridge and Culvert Capital Expenditures ................................................................... 35
Figure 5.6: Ad Hoc Environment ............................................................................................................... 39
Figure 5.7: Recommended “Enterprise” Environment .............................................................................. 39
Figure 7.1: Cumulative 10 Year Infrastructure Gap Visual (Transportation Services) ............................. 44
LIST OF TABLES
Table 2.1: Inventory and Valuation ........................................................................................................... 9
Table 3.1: O.Reg 588/17 Levels of Service Metrics and Structures Assets .............................................. 13
Table 3.2: O. Reg 588/17 Required Levels of Service Metrics (Transportation Services) ........................ 14
Table 3.2 (Continued) O. Reg 588/17 Required Levels of Service Metrics (Engineering Services) Performance
Measure: Technical Focused ....................................................................................................................... 15
Table 3.3: Levels of Service Metrics – Foundational and Advanced (Transportation) ............................. 20
Table 3.3 (Continued) Levels of Service Metrics – Foundational and Advanced (Engineering Services) Performance
Measure: Technical Focused ....................................................................................................................... 21
Table 3.3 (Continued) Levels of Service Metrics – Foundational and Advanced (Engineering Services) Performance
Measure: Technical Focused ....................................................................................................................... 22
Table 3.3 (Continued) Levels of Service Metrics – Foundational and Advanced (Engineering Services) Performance
Measure: Technical Focused ....................................................................................................................... 23
Table 4.1: 2020 Bridge Projects ................................................................................................................. 31
Table 5.1: Structural Adequacy Rating ...................................................................................................... 32
Table 5.4: County Structure Age Pro
Page 3
30
LIST OF APPENDICES
Appendix A – Elgin County Road Network Documents
Page 4
31
1.0INTRODUCTION
1.2.Significance of MunicipalInfrastructure
The Corporation of the County of Elgin (“County of Elgin” or “County”) infrastructure systems are the
backbone of our communities. They support a range of municipal services that enable the quality of life
experienced by residents, businesses, and other stakeholders.
The County’s Asset Management Program is designed to enable management of infrastructure assets in a
way that connects strategic Council and municipalityobjectives to day-to-day infrastructure investment
decisions.
The County’s Asset Management Plan (AMP) is a tactical outcome of the Program, setting out the current
plan for the County to manage its $831 millionworth of coretransportationinfrastructure. This is
accomplished by:
Aligning with the Provincial regulatory landscape, meeting the requirements of O.Reg 588/17, and
positioning the County for grant funding applications.
Understanding the current state of the infrastructure systems.
Measuring and monitoring Level of Service (LOS) metrics to quantify how well an infrastructure
system is meeting expectations.
Establishing asset lifecycle management activities (i.e. how infrastructure is operated, maintained,
rehabilitated and replaced).
Determining the optimal costs of the asset lifecycle activities required to ensure the infrastructure
systems provide service levels that meet municipality expectations.
Establishing a financial strategy to fund the expenditures that are required to complete the optimal
lifecycle activities for Council’s approval.
Prepare conclusions and provide recommendations resulting from the data analysis performed.
Based on the existing County budget, the infrastructure gap based on existing asset condition of the road
network, bridges, and culverts is expected to grow to $47 million within the Plan’s 10-yearperiod of
analysis.
The County’s proposed strategy is to mitigate the annual growth of the infrastructure gap. The strategy is
to balance the affordability of municipal taxes with the needs of the County.
Failing to address growing infrastructure needs will result in increased risk of infrastructurefailures that
will negatively affect the quality of life through more frequent impacts likeroad closures, structure failures,
etc. Failure to take care of a minor repair in the shortterm can lead to more costly solutions in the future.
The County’s projected life cycle investmentplans currently do not meet the needs of our infrastructure. If
nothing is done to address theprojected shortfall, the infrastructure gap will continue to grow, resulting in
an untenable situation.The most efficient way to manage our assets is through well planned investments;
making theright investment at the right time for the right amount.
Page 5
32
The Program areas and services that are included in the scope of the 2019 AMP first focuses on the County
Road Network and Structures. A future update to the AMP is required to incorporate the following
additional County areas and services:
Stormwater
Corporate Facilities
Long Term Care
Cultural Facilities
Information Technology
Fleet
1.3.Ontario Regulation 588/17 (O. Reg 588/17)
PRECURSOR
In 2012, the Province of Ontario published ‘Building Together: Guide for Municipal Asset Management
Plans’ (AMP) to encourage and support municipalities in Ontario to develop AMP(s) in a consistent
manner.
In 2015, Ontario passed the Infrastructure for Jobs and Prosperity Act which affirmed the role that municipal
infrastructure systems play in supporting the vitality of local economies. After a year-long industry review
process, the Province created Ontario Regulation 588/17 –Asset Management Planning for Municipal
Infrastructure under the Infrastructure for Jobs andProsperity Act. O.Reg. 588/17 further expands on the
Building Together guide, mandating specific requirements for municipal Asset Management Policies and
Asset Management Plans, phased in over a five-year period.
O. Reg 588/17 has a phased approach with three deadlines of July 1, 2021, July 1, 2023, and July 1, 2024.
The July 1, 2021 and July 1, 2023 deadline arewhere ‘Core’ assets (road, bridges, etc.) and all County
infrastructure assets, respectively will have an asset management plan documenting current levels of
service. The final deadline (July 1, 2024) is to document proposed levels of service and financial strategies
to fund these expenditures.
REQUIREMENTS ACHIEVED FOR THE 2019 AMP
For directly-owned County infrastructure assets, this AMP is compliant with the July 1, 2021 and July 1,
2023 Regulation requirements. Furthermore, it also includes some componentsof the July 1, 2024
requirements.
1.4.County of Elgin
The County is located in the Province of Ontario. It is an upper-tier municipality, subdivided into seven
lower-tier municipalities. The County is located in Southwestern Ontario, south of the City of London, and
borders Lake Erie on the south. The County is approximately 1,820 square kilometers in size, and has a
population of nearly 50,000. Figure 1 illustrates the location of the County.
Page 6
33
Figure 1: County of Elgin – Location Map
1.5.Development and Continuous Improvement of the AMP
This AMP is the culmination of efforts from staff across our organization who areinvolved with managing
infrastructure assets, including finance staff involved with funding capitalprojects and operating programs,
technical staff involved with planning and executing theconstruction of infrastructure assets, and on-the-
ground staff who operate and maintain infrastructure assets.
Moving forward, their involvement will continue to ensure that future editions of the plan remain relevant
and useful in properly managing the County’s infrastructure assets.
1.6.Corporate AMPScope
This Corporate AMP first focuses on the County’s road network and structure infrastructure assets that
provide services to our communities. The County’s approach is to take a service-focused perspective to the
Corporate Asset Management Program, and therefore the transportation infrastructure systems are
described as follows in terms of services & service areas rather than asset category:
Roads & Structures - Roadways include those classified as major arterial, minor arterial, collector,
local, or suburban links as defined in the County of Elgin Roads Plan and Policies (February 2009)
with the inclusion of road base, asphalt, curb and gutter, storm sewers,and traffic islands. Road
structures include bridges, major/minor culverts, pedestrian tunnels, and major retaining walls.
The County is an upper tier municipality, subdivided into seven lower-tier municipalities. Responsibility
for maintenance of infrastructure is divided between the upper- and lower-tier municipalities.The
subdivided municipalities are responsible for the majority of the infrastructure within the County. It is the
responsibility of the County to maintain major arterial and collector road network and structure
Page 7
34
infrastructure belonging to the County. Roadand structure (bridges and culverts)infrastructure within the
County includes:
689kilometers of pavedroads (601 asphalt + 88 surface treated);
58 bridge structures;
84culvert structures;
2 pedestrian tunnels;
4 retaining walls;
36 standalone street lights
~7,725 traffic signs; and,
33 traffic control signals and beacons.
1.7.AMPLimitations
The AMP is a tool which is meant to be used to inform decision making. Other political, social, and
environmental considerations should also be consideredin planning capital investments. However, the
AMP should provide a foundation on which those decisions are made.
In addition, the usefulness of the AMP is directly related to the quality of data used in its analysis. County
Staff involved in this AMPwere committed to data accuracy, yet some assumptions had to be made in
extenuating circumstances. Yet as a whole, the AMP provides an accurate approximation of the County’s
current and future infrastructure needs.
The following points summarize the assumptions and limitations of this AMP:
The scope of this Plan covers the assets directly owned by the County.
This AMP is compliant with the 2021 and 2023 requirement of O. Reg. 588/17 for directly owned
County assets. Additional effort will be required by the County to establish the proposed Level of
Services (and associated costs impacts) to meet the 2024 requirements.
The County has not implemented an asset risk management strategy although one has been drafted
and is planned for full implementation over the next few years.
The County addresses condition information in three ways:
i.Condition may be technically assessed and reported on in a quantifiable technique. This
method is the most accurate and most expensive (e.g. Structural Adequacy Rating).
ii.Condition may be assumed based on age and estimated useful life.
iii.Finally, condition may be based on the expert opinion of staff using the asset.
Unexpected events (e.g. climate change, weather patterns) will not disrupt infrastructure
replacement and renewal projects over the period of analysis.
Inorder to meet the investment requirements identified in this Asset Management Plan, a
significant incremental increase in taxes will be required. The double-digitincrease, if
implemented all within one year would place an undue burden on rate payers. To avoid this, an
incremental 1.6% increase in each of the next 10 years is proposed. In the interim, while the gradual
escalation of taxes occur, incremental debt will be required to provide the needed cashflow to fund
the increased investment in our infrastructure.
Page 8
35
2.PROJECTMETHODOLOGY
The general methodology we have adopted has been to follow the best practices from the National Guide
to Sustainable Municipal Infrastructure (2002), also known as the InfraGuide. The approach is described
in five steps and was designed to help asset managers assess the level of service currently provided by their
tangible assets. It allows asset managers to make fact-supported infrastructure investments decisions, while
maximizing the effectiveness of available funds. Indeveloping an AMP for the County, each of the five
steps, and their key elements, as presented below, were addressed. Each step is described in detail in the
sections below.
1.Infrastructure Data Inventory - What infrastructure do youown?
Analysis of existing data and optimization of data sources;
Transfer of physical characteristic information into databases; and
Document inventory of all assets.
2.Replacement Costs - What is it worth?
Define bench-marking unit prices for replacement;
Calculate replacementcosts of all assets; and
Input information in analytical tools.
3.Condition Assessment - What is its condition and remaining service life?
Review of condition assessmentdata;
Transfer of condition data to analytical tools;
Computing condition assessment indices where appropriate;
Statistical analysis of defects to assess lifeexpectancy;
Determination of service life of all infrastructure assets; and
Comparison with industry standards and definition of acceptable level of service.
4.State of Local Infrastructure Analysis- What needs to be done to rehabilitate, replace, operate
and maintain theseassets?
Upload condition data in asset management tools and process information;
Review the effect of different repair alternatives;
Consideration of lifecycle costs and extension of service life; and
Determine financial requirements to address needsidentified.
5.Asset Management Strategy - What should be done first and how much will it cost?
“what if”expenditure scenarios; and
Consideration of selected
Production of a prioritized short and long-termAMP.
The final part of this report which could be incorporated as an additional question to the list above isHow will you
finance your plan? To answer that question,we have reviewed a variety of financing strategies which could be
implemented to address the needs of all assets while maintaining an acceptable level of service to the residents.
Page 9
36
2.1.Infrastructure DataInventory
The County already possesses a large amount of inventory and condition assessment data in a variety of
formats.Table 2.1below summarizes the asset inventory and valuation for the roads, structures, and traffic
assets.
Asset TypeAssetInventoryUnitReplacement Value
Major Arterial31.3km$ 26,300,606.30
Roads
Minor Arterial274.94km$ 271,974,721.19
Collector354.24km$ 321,034,428.00
Local Road15.93km$ 12,188,701.29
Suburban Link12.34km$ 12,206,910.81
Bridges58Ea.$ 122,732,694.00
Structures
Culverts (greater than 3m 84Ea.$ 56,496,425.00
span)
Pedestrian Tunnel2Ea.$ 300,000.00
Retaining Walls4Ea.$ 3,500,000.00
Street Lighting36Ea.$ 140,883.84
Traffic
Traffic Signs~7,725Ea.$ 1,737,112.49
Signals & Beacons33Ea.$ 2,200,000.00
TOTAL$ 830,812,482.92
Table 2.1:Inventory and Valuation
2.1.1.Road Network Inventory
Prior to preparation of the AMP, County staff had created a digitized road network database. Information
such as year of construction, surface type, and pavement widths were some of the attribute information that
was required in the development of the AMP.
2.1.2.Structures Inventory
The point assets considered within this AMP include bridge and culvert structures three meters or larger in
span. The main source of information for these point assets were reports created to respond to Ontario
Structure Inspection Manual (OSIM) requirements. To meet the requirements set out in OSIM, all structures
on Ontario highways must be inspected at systemic intervals, based on defined technical and material
standards. Full reports were developed for the structures within the County, providing detail on condition,
physical attributes and recommendations for future needs andrehabilitation.
County staff, reviewed all OSIM and PSAB data and made appropriate adjustments to parameters such as
service lives and replacement cost of an asset. The goal was to cater the existing information on current
infrastructure conditions to the AMP development process.
2.1.3.Traffic Asset Inventory
To meet transportation needs, the County owns and operates an extensive inventory of static, electrical and
electronic Traffic infrastructure valued at over $4million. Assets range from street lighting units, to
regulatory and informative signage, and road line markings. Table 2.1above summarizes the asset inventory
and valuation for the Traffic assets.
Page 10
37
Traffic infrastructure is broken down into three categories: Street Lighting, Signals& Beacons, and Traffic
Signage. Maintenance and upkeep of Lighting and Signals assets are contracted out to a third party.
However, operating activities are undertaken by County staff. The contracts and Provincial standards
govern asset performance and the timing of work. The County also maintains road signage and line
markings. Major and minor regulatory signage is governed by the Highway Traffic Act, and local bylaws,
respectively. Guidance or Information signs are posted as defined in the Ontario Traffic Manual.
2.2.ReplacementCosts
Calculating the replacement costs of infrastructure assets provides insight on the existing financial
investments on municipal infrastructure networks. To calculate overall replacement costs, County staff
utilized unit construction costs based on recent construction activities completed in the area. Calculation of
replacement costs for point assets involved assigning an average unit cost per square meter of deck area to
each bridge, and per meter of length for culverts. The replacement costs were dependent on the construction
type and overall size of each structure. The replacement costs calculated by County staff were developed
from previous project experience.
2.3.Condition Assessment
The generation of condition indices, using consistent and repeatable techniques, is essential in comparing
assets and identifying needs in all types of infrastructure. These indices are used to track improvements to
the level of service in the condition of the asset network in the form of financial investment. The County
already has performance data on their road network which was summarized using an index called Structural
Adequacy Rating (SAR). That index was correlated to a Performance Index (PI) the roadnetwork ranging
from 0 to 1, with 1 representing an asset in perfect condition. This conversion was required for processing
of the data in the asset management tool. Once all assets were assigned a condition rating, knowledge of
assets and technical expertise were used to determine rating level which represented the minimal level of
service that can be provided to the residents. Any components of infrastructure rated below the minimal
rating are considered in needs of repair to improve the level of service. The minimum rating, or level of
service, is called the Threshold ofAcceptability of an asset.
The following Figure 2 illustrates graphically an example of performance thresholds and deterioration
model used for road networks.
Page 11
38
Figure 2: Deterioration Model and Threshold of Acceptability
2.3.1.Road Network Condition AssessmentProcess
The County has a highly developed Structural Adequacy Rating system which is used to summarize the
results of condition assessment surveys carried out on all the roadway sections in the network on a regular
basis. This survey provides a more accurate indication of the condition of the road surfaces, and better
prediction of roadway deterioration. This information was used to analyze the road network over time.
2.3.2.Bridge and Culvert Condition AssessmentProcess
Condition assessment surveys havebeen carried out on the bridge and culvert point assets earlier this year
through the OSIM report program. The detailed condition assessment evaluated the condition of the
elements of eachstructure, and identified elements requiring repair, however did not attribute condition
indices to the structures. Therefore, it was decided to take an approach based on year of construction and
remaining service life in determining condition indices. The OSIM and PSAB databases contained
information on year of construction, service lives and replacement costs, which were used to approximate
timing for rehabilitation and replacement of those assets. The approximations were reviewed and adjusted
in some cases to better reflect actual condition of some assets.
Page 12
39
3.DESIRED LEVELS OFSERVICE
3.1.MunicipalityObjectives
Every municipalitymustdevelop objectives on the expected quality of life desired in their municipalityand
a vision for the future. These are established either through a structured process (such as a comprehensive
municipalityplan) or by other means. The objectives and vision usually include elements of health and
safety, social wellbeing, economic and cultural development, and other factors. Municipalityobjectives rely
heavily on the ability of the existing infrastructure to support such plans. In many instances, the objectives
call for new infrastructure that the municipality will have to operate and maintain for generations.
Levels of service have to be aligned to the strategic direction of the municipality. Appropriate levels of
service must consider the municipality’s ability and willingness to tolerate risk. The costs associated with
the levels of service need to be established and evaluated in view of the capacity of the municipalityto
support them.
Ideally, each municipalityshould use this process to define their acceptable level of service. Once
determined, all assets would need to be reviewed and compared to the municipality’s expectations. Action
plans on remedial measures would have to be developed to close the gap between expectations and reality,
if physically and financially possible.
3.2.O.Reg 588/17 Requirements
O. Reg. 588/17 requires legislated municipalitylevels of service for core assets. Municipalitylevels of
service use qualitative descriptions to describe the scope or quality of service delivered by an asset category.
Examples of legislated municipalitylevels of service include a map showing the different levels of road
class pavement conditions or images that illustrate the different condition of bridges and how this would
affect use of the bridges.
O. Reg. 588/17 also requires legislated technical levels of service for core assets. Technical levels of service
use metrics to measure the scope or quality of service being delivered by an asset category. Examples of
technical levels of service include average surface condition for paved roads based on the Structural
Adequacy Rating Value or the average bridges conditions based on Bridge Condition Index value.
The following Table 3.1below lists the performance measures that are included in the O.Reg 588/17
requirements for Roads and Structures assets. References are provided to show where O. Reg 588/17
requirements have been attained:
Page 13
40
Table 3.1O.Reg 588/17 Levels of Service Metrics for Roads and Structures Assets
Customer Level of ServiceTechnical Level of Service
Description or images that illustrate the Average surface condition (e.g. excellent, good,
different levels of road class pavement fair or poor) for unpaved roads.(Table 3.2)
condition.
Description or images of the condition of For bridges in the County, average bridge
bridges and how this would affect use of condition index value.(Table 3.2)
the bridges.(Figure 3.3)
Description or images of the condition of For structural culverts in the County, average
culverts and how this would affect use of bridge condition index value.(Table 3.2)
the culverts.(Figure 3.4)
Description, which may include maps, of Average surface condition (e.g. excellent, good,
the road network in the County and its fair or poor) for paved roads.(Table 3.2)
level of connectivity.(Figure 3.1 and 3.2)
# of lane-kilometresof major arterial roads as a
proportion of square kilometres of land area of
the County. (Table 3.2)
# of lane-kilometres of minor arterial roads as a
proportion of square kilometres of land area of
Description of the traffic that is supported
the County. (Table 3.2)
by County bridges (e.g., heavy transport
# of lane-kilometres of collector roads as a
vehicles, motor vehicles, emergency
proportion of square kilometres of land area of
vehicles, pedestrians, cyclists).(Table 3.2)
the County. (Table 3.2)
# of lane-kilometres of local roads as a proportion
of square kilometres of land area of the County.
(Table 3.2)
# of lane-kilometres of suburban link roads as a
proportion of square kilometres of land area of
the County. (Table 3.2)
% of bridges and culverts in the County with
loading or dimensional restrictions. (Table 3.2)
Other level of service performance measures arerelated to Corporate Values of Cost Efficiency, Scope,
Operational, Accessibility, and Environmental Stewardship. The metrics that go beyond the foundational
or regulation required metrics are considered advanced. They indicate service areas have documented
planned approaches for operation and maintenance of infrastructure, and have considered trending
indicators if the result is planned to be decreased, increased, or to be approximately equal in future years.
Foundational and advanced metrics are listed inTable 3.3.
Page 14
41
CUSTOMER
LOS TARGET
Not ApplicableNot ApplicableNot ApplicableNot Applicable
Not Applicable
4
2
in Figure
ians, and
and 3.
3
1
3.1
3.
cyclists.
PERFORMANCE
CUSTOMER LOS
Figures 3.
County of Elgin bridges
vehicles, emergency
Maps are included in
accordance with the
Images included in 3.
The bridges have been
have been designed in
designed to carry heavy
transport vehicles, motor
Images included Images included in Figure
vehicles, pedestr
of the Bridge Design Code
The at the time of construction.
standard and requirements
42
county and its level connectivity.
would affect the use of the culverts.
CUSTOMER LOS MEASURE
levels of road class pavement condition.
emergency vehicles, pedestrians, cyclists).
and how this would affect use of the bridges.
and how this
Description of the traffic that is supported by county
Include description, which may include maps, of the
road network in the
bridges (e.g., heavy transport vehicles, motor vehicles,
Include description or images that illustrate the different
Include description or images of the condition of bridges
Include description or images of the condition of culverts
Positive Downward
Table 3.2 O. Reg 588/17 Required Levels of Service Metrics (Transportation Services)
level of connectivity.
pedestrians and cyclists.
Providing a transportation
8/17 Required Levels of Service metrics (Engineering Services)
network with a reasonable Positive Upward
8
network that is safe for drivers,
Providing an operational road
CORPORATE LOS OBJECTIVE
Scope
Operational
No Change
CUSTOMER VALUE
Table 3.2 O. Reg 5Performance Measure: Customer / Council Focused
LOS
TARGET
TECHNICAL
0.330.25
3.5 %
0.34 km0.03 km
0.39 km
SAR 14.9 (Good)
PERFORMANCE
TECHNICAL LOS
roads as a
roads as a value.
lifecycle
lifecycle
(Engineering Services)
roads as a proportion of
value.
43
county.
restrictions
Collector
Major and Minor Arterial
Suburban Link and Local
poor) for paved roads.
of square kilometres of land area of the
CUSTOMER LOS MEASURE
kilometers of
kilometers of
-
kilometers of
-
-
square kilometres of land area of the county.
ercentage
For bridges in the county average
p
For structural culverts in the county, average
% of bridges in the county with loading or dimensional
Average surface condition (e.g. excellent, good, fair, or
# of lane
# of lane
# of lane
proportion of square kilometres of land area of the county.
Positive Downward
8/17 Required Levels of Service metrics
8
of connectivity.
pedestrians and cyclists.
Providing a transportation
network that is safe for drivers,
Providing an operational road
CORPORATE LOS OBJECTIVE
network with a reasonable level
Positive Upward
Scope
Operational
No Change
CUSTOMER VALUE
Table 3.2 (Continued) O. Reg 5Performance Measure: Technical Focused
4
11
SAR =
SAR =
Quality Index
Images that illustrate the different Pavement
ConditionVery Poor
Value 0-7)
Condition (SAR
44
Poor Condition 4
(SAR Value 7-11)
201714
=
SAR = SAR SAR =
Quality Index
Images that illustrate the different Pavement
Figure 3.1 Images of Pavement Quality Index Inspections Compared to Asset Management Condition Rating
19) 14)
Condition
Very Good 1
(SAR Value 20) (SAR Value 12-
Fair Condition 3
Good Condition
2 (SAR Value 15-
and Level of Connectivity
45
SAR Condition
Figure 3.2 Map of County Road Network
Sparta Line (CR27)
–
None
(BCI 42)
B24 Meeks Bridge
-29)
(BCI 1
(BCI 30-65)
Poor Condition
Condition Inspections
Very Poor Condition
46
Images of Bridge
3
Dunborough Road
Willsie Bourne (CR34)
–
–
Glen Colin Line (CR40)
–
Images of the condition of bridges and how this would affect use of the bridges
(CR5)
Figure 3.
B43 Glen Colin (BCI 97)
B03 Walkers Bridge (BCI 91)
B32 Belmont West (BCI 66)
Condition
Very Good (BCI 80-99) (BCI 66-79)
Fair Condition
Good Condition
Condition (BCI 100)
Putnam Road
–
None
(CR47)
C61 Clapton Farrow (BCI 61)
-29)
(BCI 1
(BCI 30-65)
Condition Inspections
Poor Condition
47
Very Poor Condition
Culvert
Duff Line
–
Ron McNeil
Images of
–
4
Talbot Line (CR3)
–
(BCI 91)
Images of the condition of culverts and how this would affect use of the culverts
(CR9)
Figure 3.
Line (CR52)
C08A Campbell West (BCI 100)
C59 Pettman Moore
C54 Baird Drain (BCI 73)
Condition
Very Good (BCI 80-99) (BCI 66-79)
Fair Condition
Good Condition
Condition (BCI 100)
N/A
100%
100%100%100%
TARGET
as practicable
signage as soon
CUSTOMER LOS
Clear obstructed
41%98%
75%
LOS
34 %
100%100%
167.50
10.75
9.97%
$
CUSTOMER
PERFORMANCE
in
condition
good
) ($/household)
48
to adequate
Signals
Foundational and Advanced (Transportation)
fair
total in cycling master plan
CUSTOMER LOS MEASURE
–
road maintenance timeline standardsroad maintenance timeline standards
% of streetlights that are energy efficient
% of signage with visibility that meets (check)
of paved lane km where the condition is rated
(Roadway, Structure, Street Lighting and Traffic
Operating cost to provide transportation services
Volume of salt tonnes applied to road per lane km
%
% of street light repairs that meet or exceed county
% of paved lane km where the condition is rated as
% of linear bike facility (i.e. bike lanes) completed vs
% of traffic signal repairs that meet or exceed county
provide
Foundational and Advanced (Engineering Services)
cyclists.
all modes
–
To
Provide an
Levels of Service Metrics
Positive Downward
OBJECTIVE
effective manner
-
network that is
3
network that is safe for
pedestrian access
CORPORATE LOS
control, appropriate
lighting, signage and
Providing an efficient
cost
network and adequate
drivers, pedestrians and needs of the public in a
Providing an operational
transportation network for
Providing a transportation
environmentally conscious
safe and effective mobility
pavement markings for the
pedestrian/vehicular traffic adequate/accessible road
road
Table 3.
Positive Upward
Levels of Service Metrics
Operational
Accessibility
Cost Efficient
3
CUSTOMER VALUE
Environmental Stewardship
No Change
Table 3.Performance Measure: Customer / Council Focused
0
TBD
100%100%
TARGET
TECHNICAL LOS
to
%
4
90%
LOS
1.6
3,350,000
quantify
future
Awaiting
$
unredacted
TECHNICAL CMMS to be
established in
ARIS approval
PERFORMANCE
)
site inspections
oks
W
years
Standards
Lighting and Traffic Signals
Approved
49
TECHNICAL LOS MEASURE
ermitted
Roadway and Structure Reinvestment Rate
Structure, Street
% of compliance with Minimum Maintenance
% of P
# of bridges and culverts with reduced load limits
% of reduction in injury and fatality collisions over 5
Operating cost for transportation services (Roadway,
Foundational and Advanced (Engineering Services)
–
cyclists.
all modes
Positive Downward
OBJECTIVE
CORPORATE LOS
Providing an efficient
drivers, pedestrians and
Providing an operational
transportation network for
road network that is safe for
Positive Upward
(Continued) Levels of Service Metrics
Operational
Cost Efficient
3
CUSTOMER VALUE
No Change
Table 3.Performance Measure: Technical Focused
100%
100%100%
TARGET
TECHNICAL LOS
2%
25%
LOS
8.4%
100%
100%100%
TECHNICAL
PERFORMANCE
50
maintenance standards.
% of roads in poor condition
TECHNICAL LOS MEASURE
% of structures in poor condition
patrol and maintenance standards.
and plowing) with policies, road patrol and
% compliance of spring/summer maintenance
% compliance with Bridge Inspection Standard
% compliance of winter maintenance (sand, salt
% of signage assets in poor and critical conditions
(sweeping and debris removal) with policies, road
Foundational and Advanced (Engineering Services)
–
Downward
cyclists.
Positive
OBJECTIVE
CORPORATE LOS
drivers, pedestrians and
Providing an operational
road network that is safe for
Positive Upward
(Continued) Levels of Service Metrics
Operational
CUSTOMER VALUE
No Change
Table 3.2Performance Measure: Technical Focused
LOS
0%0%
99%N/A
100%
100%
TARGET
TECHNICAL
%
lectivity Test,
130
75%
9.97
practicable
Pass Ref
PERFORMANCE
TECHNICAL LOS future to quantifyfuture to quantify
ones that don’t are
replaced as soon as
98%
CMMS to be established in CMMS to be established in
plan
% Pass
-
fixtures
county)
51
standards
TECHNICAL LOS MEASURE
Sign Reflectivity Testing
county road maintenance timeline
% of linear bike facility (i.e. bike lanes)
road maintenance timeline standards
% of streetlights with LED or low energy
Volume of salt applied to road/lane km
(just km that are salted, not all km in the
% of street light repairs that do not meet
completed vs total in cycling master
% of traffic signal repairs that do not meet
Foundational and Advanced (Engineering Services)
–
effective manner
-
Positive Downward
conscious
pedestrian access
markings for the safe and
Providing a transportation
traffic control, appropriate
road network and adequate
effective mobility needs of the
CORPORATE LOS OBJECTIVE network that is environmentally
To provide pedestrian/vehicular
lighting, signage and pavement
Provide an adequate/accessible
public in a cost
Levels of Service Metrics
Positive Upward
(Continued)
Operational
Accessibility
CUSTOMER VALUE
No Change
Environmental Stewardship
Table 3.2 Performance Measure: Technical Focused
3.3.Determining Appropriate Levels of Service for Elgin County
For this project, a full municipalityconsultation process for establishing levels of service has not yet been
conducted. The process followed was mostly based on the Asset Understanding, which considered the
physical and functional characteristics of an asset to define a measurable index that can be monitored over
time.
Condition indices were determined as described in Section 2.3: Condition Assessment. By combining this
information with staff knowledge, it was possible to determineif the current levels of service provided to
the residents were appropriate. Once acceptable levels of service were established, the information was
used to identify current and future infrastructure investment requirements.
Page 25
52
4.STATE OF LOCALINFRASTRUCTURE
Transportation infrastructure is such a crucial part of daily life that it is often taken for granted. When
somebody leaves their home, they use a transportation service. Good roads andstructures promote business,
create employment, provide social opportunities, create markets,and save lives. When transportation
infrastructure is deficient, congestion escalates, thefrequency of accidents increases, wear and tear on
vehicles worsens, emergency responsedeteriorates, the environment is negatively impacted, business
suffers and opportunities are lost.
The importance of efficient transportation is essential to building a strong economy andimproving the
quality of life for our citizens. The County contributes to the local economy and qualityof life by supporting
the safe and efficient movement of people and goods using transportationinfrastructure, while managing
the growing cost of transportation.
Traffic assets are used to support reliable, efficient, and safe transportation throughpedestrian/vehicular
traffic control, appropriate lighting, signage, and pavement markings.
Each of the County of Elgin’s member municipalities operates and maintains County roadways, bridges
and traffic infrastructurewithin their respective jurisdiction, thusenabling safe and effective travel. The
County’s Engineering Services Department is responsible forplanning and operational management of this
critical infrastructure. In addition, the County owns and maintainsdifferent types of cycling facilities
whether they are shared, designated orseparated facilities.
The County has a detailed infrastructure database, which was used to provide detail for the state of the local
infrastructure.
4.1Road Network
4.1.1Asset Inventory
The County road network includes 59roads, which are further divided into a total of 248unique road
classificationsections, totaling 689kilometers.
The characteristics of road sections within the network vary, including variations in the age of surface and
surface type of each. The age of the surface for each section was determined using the date of last
rehabilitation or resurfacing. The following Figure 4.1illustrates the distribution of the age of surfaces of
the road sections within the network.
Page 26
53
Figure 4.1: Age Distribution of Road Sections
160.00
20.8%
140.00
16.8%
120.00
100.00
12.5%
12.1%
11.8%
80.00
10.2%
10%
60.00
KILOMETERS
5.7%
40.00
20.00
0.00
(0 - 5)(6 - 10)(11 - 15)(16 - 20)(21 - 25)(26 - 30)(31 - 35)(36 - 55)
AGE
The road sections which make up the road network are varied in surface type. Some roads remain in their
original constructed state, while others have been resurfaced, or entirely reconstructed. Based on the level
of distress of the road surface, the County employs one of multiple available methods to rehabilitate the
road segment, resulting in a network consisting of various surface types. Figure 4.2shows the distribution
of road surface type of the County road network.
Figure 4.2: Distribution of Road Surface Types
88km
601km
Hot Mix RoadsSurface Treated Roads
Page 27
54
4.1.2Infrastructure Condition
The condition of the County’s road network is important in determining the needs of the overallnetwork
and is evaluated based on condition on an annual basis utilizing a system to determine the condition of the
road sections in their network, by means of a Structural Adequacy Rating (SAR) attributed to each road
section within the network. The SAR is determined using a combination of visual rating with surface
distress and longitudinal profile (wheel path roughness) data collection for each road section, and is defined
on a scale from 1 to 20, with1 representing the highest level of distress, and 20 the lowest. The SAR is
indicative of the necessity for rehabilitation of the road section and the anticipated remaining lifespan.
Results are analyzed and used to establish the pavement quality for each road segment in the County. The
overall network condition was determined through the consideration of the SAR rating attributed to each
section in combination with the length of that section as a portion of the entire network. Figure 4.3 below
illustrates the percentage of theroad network at each SAR, based on the combined section lengths for each
rating.
Figure 4.3: Road Network Condition
25.0%
19.2%
20.0%
14.7%
13.9%
15.0%
13.0%
11.2%
10.3%
10.0%
8.2%
5.4%
5.0%
Road Network Length Percetnage
2.1%
1.3%
0.6%
0.1%
0.0%
1234567891011121314151617181920
Structural Adquancy Rating
The road network overall is relatively in fair condition, resulting in an average current condition of the road
network of approximately 14.9out of 20.These values indicate that the road network currently provides an
adequate level of service to theresidents.
Page 28
55
Fair
GoodPoor
VeryVery
GoodPoor
Roadways Overall Condtion
4.1.3Estimated Asset Value
Without asset management tools, it is almost impossible to determine the long-termeffect of inadequate
budget allocations. Yet, it is important for a municipality to determine if the current level of funding is
appropriate to continue to provide an adequate level of service to its residents. It is also essential to allocate
adequate funding to ensure sustainability of the assets in the future. For the County, the replacement value
of the road assets was estimated at over $643million.
4.1.4Current NeedsSummary
The current needs for the County road network are mostly based on the condition of the road. In addition,
there may be instances where a road section is considered for rehabilitation prior to incurring a needs-based
requirement, where it is deemed practical and cost-effective, or additional requirements. In 2020, it is
expected that $11,900,000 will be required for 14 road rehabilitationand reconstructionprojects. This road
network improvement total is further organized into six categories of needs,including microsurfacing,
single lift resurfacing (Asphalt R1), recycling then resurfacing (Recycling + R1), full reconstruction
(Construction), and others. The distribution of needs for each of these categories is shown in Figure 4.4.
Figure 4.4: 2020 Planned Road Network
Rehabilitation
12.53km
$1,950,000
Resurfacing
3.70km
Surface Rehabilitation
$5,045,000
Surface Treatment/ Microsurfacing
Urban Reconstruction
Double Microsurfacing
11.86km
$2,840,000
Rural Reconstruction
5.89km
3.32km
18.42km
$330,000
$350,000
$555,000
Page 29
56
The majority of the needs currently incurred by the road network can be remedied through resurfacing. The
majority work required for 2020consists primarily of recycling then resurfacing the existing pavement
surface.
4.2Bridges andCulverts
Assets falling under the Structures category are classified based on purpose. Bridges and Culverts are
vehicle crossing structures; Pedestrian Tunnels are underground structures that supportpedestrian
movement under roadways; and Retaining Wallsare engineered structures used tostabilize large
embankments. Bridges, Culverts and Pedestrian Tunnels areinspected in accordance with Provincial
Legislation (Reg. 104/97 Public Transportation andHighway Improvement Act) and are maintained as
needs dictate within budget allowances.
In fulfilling this regulated requirement, the County retained the inspection services of Spriet Associates to
prepare the most recent Bridge and Culvert 2019 Inspection and Assessment Report which contains the
individual bridge and culvert inspection reports having following the Ontario Structure Inspection Manual
(OSIM) format. Bridge and culvert inspections were completed fromMarch to August 2019 and were
generally limited to ground level visual reviews, and do not include subsurface geotechnical investigations
or any materials analysis of bridge components.
4.2.1Asset Inventory
Bridge and culvert infrastructure in the County areconsidered within theAMP as being structuresthree
meters in size or larger. This included analysis of 58 bridge structures, and 84 culvert structures.
The County’s bridge infrastructure varies in construction type, but includes mostly concrete and steel I-
beam structures. The average life expectancy for a concrete bridge structure is 75 years, and 50 years for
steel.The following Figure 4.5illustrates the distribution of the age of bridge and culvert structures within
the network.
Figure 4.5: Average Age of Bridges & Culverts
18
16
14
12
10
8
6
4
Amount of Structures
2
0
Age
BridgesCulverts
Page 30
57
4.2.2 Infrastructure Condition
By law, the County conducts detailed inspections of all of their bridge and culvert structure every two years.
Bridge inspectors are trained engineers and technicians with several years of bridge-related experience, and
must also follow the guidelines in Ontario's Structure Inspection Manual (OSIM). This manual provides
inspectors with specific inspection procedures that must be followed during all structure inspections. When
a structure is inspected in detail every 2 years, the trained inspector reviews and rates each structure
component. These ratings are used to determine the structure's current value using the Ministry of
Transportation’s Bridge Condition Index (BCI) weighted average simplified method. Such method for
bridges only considers the deck, beams, barrier, and sub-structure elements, while for culverts simply
considers barrel and the inlet/outlet treatment elements.
The County uses the BCIto plan maintenance and repairs. The index does not indicate the safety of a
structure.The average BCIrating of all County bridges is 86, thus meaning the bridge structure inventory
is in good condition. Conversely, the County’s bridge inventory average age was determined onlyto have
33% of itslifespan remaining.
Fair
GoodPoor
VeryVery
GoodPoor
Bridge Structures Overall Condtion
The County’s culvert infrastructure includes structures typically constructed of steel and/or concrete. The
network includes primarily precast box culverts and corrugated plate steel culverts. The average life
expectancy for concrete culverts is 75 years, and 50 years for steel. The County uses the same BCI
evaluation system to plan maintenance and repairsfor culverts. Through such process it was determined
that the average BCI rating of all County culvertsis 92, thus meaning the bridge structure inventory is also
in good condition. Here again conversely based on the County’s culvert inventory average age, it was
determined that only 25% of its lifespan remains.
Fair
Fair
GoodPoor
GoodPoor
VeryVery
GoodPoor
VeryVery
GoodPoor
Culvert Structures Overall Condtion
Culvert Structures Overall Condtion
Page 31
58
4.2.3 Estimated Asset Value
Without the appropriate asset management toolsimplemented, it is almost impossible to determine the long-
termeffect of inadequate budget allocations. Yet, it is important for a municipality to determine if the
current level of funding is appropriate to continue to provide an adequate level of service to its residents. It
is also essential to allocate adequate funding to ensure sustainability of the assets in the future. For the
County, the value of the bridge and culvert assets was estimated at approximately $122.7 million for
bridges, and approximately $56.5 million for culverts, totaling over $179 million.
4.2.4 Current NeedsSummary
The current needs for County bridges was determined based on the rehabilitation and needs
recommendations identified by Spriet Associates and detailed within the OSIM report for each structure, in
addition to the year of construction or last replacement of each structure and the life expectancy. A full
replacement of the structure is typically recommended at the end of a structures anticipated service life.
Additional costs to be incurred prior to full replacement are rehabilitation items identified within the OSIM
reports, each of which has a timeline for completion and associated costs.
Based on the results of the current needs analysis, it’s estimated that bridge and culvert needs over the next
10 years (2020-2029) will total $25,017,284, broken down in Figure 4.6.
Figure 4.6: Percentage of Anticipated 10-Year
(2020-2029) Expenditures for Bridges and
Culverts
$795,906
3%
Culverts
Bridges
$24,221,378
97%
The large expenditure is mostly for assets that have theoretically reached the end of their service life.
Continued biennial OSIM inspectionof structureswill likely result in spreading that amount over a number
of years based on actual further field inspection.
It is evident that the majority of expenditures anticipated over the next 10 years will be required to replace
several bridge structures, whereas approximately only 3%of the cost for bridges will be required for culvert
replacement and rehabilitation.
Page 32
59
The results of the analysis for work required on bridges in 2020 identified 3rehabilitations and 1full bridge
replacementas per OSIM surveys,in addition to ongoing efforts to replace both the Port Bruce Bridge
(B19) and Meeks Bridge (B24). The total value of this capital investment is estimated at $10.1 million. The
balance of rehabilitation work identified within the OSIM surveys for 2020generally consist of minor
repairs, and do not carry high costs.
The total work for culverts generally only involves minor repairs worksas per OSIM surveys. The total
investment planned for culvert project over the next 10-years is $795,906.
In addition to the analysis results presented above, the County has identified the following bridge projects
to be undertaken in 2020.Table 4.1lists those projects:
Table 4.1 - 2020 Bridge Projects
NetworkProjectLocation Expenditure
BridgesWest Elgin $100,000
B01 –Bothwell Bridge Rehabilitation –Detailed Design
(partnership with Middlesex Countyand Chatham-Kent)
BridgesCentral $310,000
B18 –St. George Street Bridge Rehabilitation
Elgin
(partnership with City of St. Thomas)
BridgesB19 - Port Bruce Bridge ReplacementMalahide$5,150,000
(senior government funding in the amount of $4,166,500 has
been announced).
BridgesB24 –Meeks Bridge Replacement –Municipal Class Southwold$250,000
Environmental Assessment & Detailed Design
BridgesB92 - Kimble Bridge ReplacementSouthwold$480,000
BridgesCentral $6,070,000
B99 –King George IV Lift Bridge Rehabilitation
Elgin
Page 33
60
5.ASSET LIFECYCLE MANAGEMENTSTRATEGY
5.1 Road Network
5.1.1. Condition Assessment
The County currently maintains a comprehensive MS Excel-based asset road network segmented database.
The database was used, in conjunction with details regarding the processes and requirements, for road
network rehabilitation and replacement to develop a system through which road improvements are
managed. The processes through which a road segment is selected for rehabilitation take into consideration
factors in addition to the condition, including:
Capacity /growth
Drainagerequirements
Roadside environment
Construction history
Planned work by others
The most reproducible technique for determining which road segment requires rehabilitation is through
analysis of the structural adequacy rating (SAR), which corresponds to a level of distress of the road surface,
as described in Section 4.1.2. The County has defined a prioritized list of actions to be undertaken at varying
degrees of distress, as detailed in Table5.1.
Table 5.1 – Structural Adequacy Rating
ValueDistressActions
20Distress <5%None
19-15Distress 5 -15 %Crack Sealing, Patching, Microsurfacing, R1, MR1
14-12Distress 16 -25%R1, MR1, PR1, CIREAM/R1
11-8Distress 26 -35%PR1, CIREAM/R1, MR2, PR2, Reconstruction
7-1Distress >35%Reconstruction, Surface Treated Roads
Each SAR bracket is associated with a list of suggested actions. Additional factors, as listed above, are
considered when determining the most appropriate action to be undertaken to a road segment, at the
discretion of the County. Further details provided by the County regarding SAR ratings can be found in
Appendix A.
Because of the high level of intricacy in determining the timing and action type for maintenance of each
road segment within the system, it is recommended that the short-term asset management planning, within
a timeframe of 10 years from the present, continue in this manner. Retaining the County system to
characterize the work to be done allows the system to be inter-connected with additional information and
reference to rehabilitation guidelines easilyfeasible.
The County compiles annualcost information associated with each rehabilitation method used. The cost
information provides breakdowns of individual components for each rehabilitation method, and costs per
kilometer of road being rehabilitated, details for which can be found in Appendix A. These values were
used to determine the expenditures for road work in the plan.
Page 34
61
5.1.2.Network Condition Lifecycle
Using asset management software, it is possible to analyze the infrastructure needs into the future, and the
impact of allocated funding on the overall network condition. Purchase and implementation of asset
management software is recommended and will assist County staff in determining what funding levels are
required to increase, decrease or maintain the current condition of the network.
As noted in Section 5.1.1, the considerations used in the development of the asset management plan as used
by the Countyare intricate and subjective in nature, and dependent on a range of variables. The typical
lifecycle of a road segment within the County is illustrated by the grey solid line in Figure 5.1.
Figure 5.1: Graphical Representation of Lifecycle of an Asset
The figure demonstrates a typical rehabilitation schedule for a road segment, using different rehabilitation
options, and their rate of deterioration. As demonstrated in the figure, road network maintenance can be
undertaken using a number of rehabilitation options, which are incurred at different road condition levels.
The lifecycle presented is considered typical, and the type of rehabilitation, condition level trigger and
sequencing of works are all subject to change at the discretion of the County.
5.1.3.Lifecycle Management Approach
The general approach to forecasting the cost of the lifecycle activities that are required to maintain the
current performance of the LOS metrics is to ensure that the proportion of assets in poor or very poor
condition remains relatively stable. Staff then consider the optimal blend of each lifecycle activity to
achieve the lowest lifecycle cost management strategy that balances costs with the forecasted change in the
condition profile of each asset type.
5.1.4. Current Budget Condition Profile
The condition profile expected from the current budget can beforecasted with asset management tools by
using the same logic related to condition degradation rates and appropriate condition triggers for
Page 35
62
rehabilitation/replacement activities, but the budget is constrained to the current level of planned
expenditures. If there is insufficient budget in any particular year to complete a rehabilitation or replacement
activity on an asset that has reached its condition trigger, then the asset remains in a Poor or Very Poor
condition state until there is sufficient budget in a future year to complete the lifecycle activity.
5.1.5. Optimum Budget Condition Profile
The approach to establishing the optimal budget is to forecast with the appropriate asset management tools
the lifecycle activities that are required to maintain the current performance of the LOS metrics. Such
analysis would consider the current condition of assets, the rate that the condition is expected to degrade,
and appropriate condition triggers for rehabilitation/replacement activities to forecast the condition profile
into the future. The variables in suchanalysis wouldadjusted until theforecasted condition profile meets
the expectation of County staff involved with the management of the assets.
The County currently provides a high level of service to its users of the road networkbased on the current
good condition of the County road network. As a road network in good condition has become the standard
for the County, it is recommended that efforts be made to continue to maintain this level of service for its
residents.
The AMP developed by County staff utilizedtheinformation and strategies currently in place at the County.
The plan provides detailed information regarding the projects planned for the upcoming ten years. The first
5 years of the plan includes a breakdown of specific projects attributed to each year.The sixth to tenth years
within the plan do not distinguish between individual project years, instead allotting a lump anticipated
expenditure of approximately $86.8millionfor selected projects. The following Figure 5.4shows the
anticipated expenditure for road rehabilitation for the 10-yearscenario, including an assumed even division
of the lump expenditure over years 2025-2029, as blue colouredbars. The red coloured bars are
representative of the budgeted expenditures for bridge and culvert works.
Figure 5.4: Annual Budgeted Expenditures for
Transportation Network
$90,000,000
$80,000,000
$70,000,000
$60,000,000
$50,000,000
Bridges & Culverts
$40,000,000
Road Network
INVESTMENT
$30,000,000
$20,000,000
$10,000,000
$0
2019202020212022202320242025-2029
YEAR
Page 36
63
The budget allocated for bridges and culverts is shown for visualization of the entire budget breakdown.
Further detail regarding the usage of the structure portion of this budget is given in Section 5.3.
The road network budget allocations for each year within the plan range from approximately $11.5million
to $16.9 million(totaling approximately $145 million over a ten-year period), and were determined to
address specific needs identified by the County in an effort to maintain the good quality of the road network.
Documents supporting the short-term asset management strategy for the road network as used by the County
can be found in Appendix A.
5.2.Bridges andCulverts
Network condition indices were not developed for the bridges and culverts. In the case of these structures,
a network condition rating is not an accurate way to qualify the condition. The structure network undergoes
periodic inspection, through OSIM, which identifies required rehabilitation and condition of structures.
Because there are multiple components to each bridge structure, an overall condition index is difficult to
determine.
Instead the AMP developed for the bridges and culverts was done having considered the remaining life,
replacement cost, and recommended rehabilitation actions for each structure; and developed a schedule and
anticipated yearly expenditure for a 10-year timeframe. The plan was developed having predominantly
considered the rehabilitation requirements defined in the most recent OSIM reports completed for the
structures. These recommendations were included in the plan using the anticipated timeline and cost for
each.
Figure 5.5shows the capital expenditure anticipated for bridges and culverts based upon the age and life
expectancy of the structure. Some lower volume, town line structures have exceeded their service lives and
although replacement of these bridges is identified, the plan proposes to continue to rehabilitate as
recommended in the OSIMreport to extend their service lives rather than complete replacement at a
significantly higher cost.
Figure 5.5: Annual Bridge and Culvert Capital
Expenditures
$12,000,000
$10,000,000
$8,000,000
$6,000,000
Culverts
Bridges
INVESTMENT $4,000,000
$2,000,000
$-
202020212022202320242025-2029
YEAR
Page 37
64
The initial year of the asset management plan indicates comparatively large expenditures from the
remainder of the plan. These expenditures are primarily in response due to the backlog of rehabilitation and
replacement workwhich exists, as well as the expiration of the 5-year period for repairs identified to be
completed within the 1-5 yearperiod in the 2014OSIM surveys. It should be noted thatthe OSIM condition
surveys have been legislated by the province and must be carried every 2 years. This is a good process to
frequently update the plan and accelerate or delay rehabilitation based on the recommendations of the
surveys.
5.3.Current and FutureChallenges Discussion
5.3.1. Roads
Transportation infrastructure serves a variety of needs from active mobility by walking andcycling, to
personal vehicle. Additionally, it supports the economy by enabling theefficient movement of goods and
services. Anincreased transportation infrastructure gap canlower levels of service that are realized in a
number of ways including pavement potholes,bridgeload reductions, illegible signs, less reliable
streetlights and traffic signals,and other distresses. This can result in:
Lower levels of customer satisfaction
Lower levels of road safety
Challenges to personal mobility
Increased liability and claims
Longer times to commute to work and school
Impacts to quality of life
The life expectancy of asphalt is 10-20 years. This is shortened when utility cuts occur. Theanticipated
time to rehab an urban and rural road is now 37 and 48yearsrespectively,more thandouble the life
expectancy of theasphalt.
In extreme cases when pavement conditions deteriorate to very poor conditions, road closuresmay be
necessary. Major roadways carrying heavy traffic volumes result in significant congestionand delays for
motorists during times of construction and repair. While this work can be plannedduring off peak and night
time hours, there is a cost premium associated with this approach
5.3.2.Structures
Structures form a vital aspect of the County’s transportation network creating the connecting linksacross
the various rivers, creeks and tributaries. Maintaining these assets in good, safe condition is important to
the prosperityand mobility of our citizens.
Between the late 1940’s and the early 1990’s, the County constructed 100 of its 143 structures or70% of
its inventory. These structures now range in age from 25 to 75 years. Along with theadditional 17% of the
inventory that is older than 75 years, the majority of our inventory hasreached half of its useful life. With
regular routine inspection, regularmaintenance and ongoing repairs, the design useful life of these
structures can be extended.Regular maintenance includes clearing deck drains and expansion joints, and
spot deck delaminationrepairs. While regular repairs are understood to be majorrehabilitations which
should be done approximately every 15 to 25 years. These rehabilitationstypicallymay include repairs to
all necessary elements including the expansion joints abutments, piers, girders, deck,and parapet walls
while ensuring that the structure meets current requirements of the CanadianBridge Design Code.
Page 38
65
Structures are expensive for any municipalityto maintain. Replacement costs for a bridge run onaverage
22
$4,000/m, with major rehabilitation work running on average $2,175/mdepending onthe size of the
structure and the scope of the required work. These figures do NOT includeallowances for service
improvements such as widening for bike lanes or geometricimprovements, nor do these figures include
costs for engineering, environmental assessments ortemporary support works necessary to complete the
work; all of which are typical requirementsfor a major structural rehabilitation. These extras requirements
22
result in the above costs beingincreased by approximately 25%, or $5,000/m
and $2725/m, respectively.
In comparison, thecost to reconstruct a two-lane arterial road, including sewer and watermain replacement
2
andengineering runs in the order of $600/m.
Funding levels have been increasing over the last decade but with the majority of the County’sstructures
beyond the 50-year agerange and reaching the end of their expected useful life. Thesefunding levels are
inadequate to fully address the inventory needs. This means that the need foremergency, temporary repairs
(as well as closures) is becoming more prevalent. Theseemergency repairs normally requireunplanned lane
closuresor posted load limitsand result in significant trafficdelays, disruption and/or detours. Examples
of the County’s inventory of aging structures and recentrequired emergency repairs/replacement include:
Port Bruce Bridge(B19) - Was constructed in 1964 and was a 3-span reinforced concrete
structure. A suspended or “drop in” precast girder centre span (46.6m) was supported by 2 cast
in place post-tensioned concrete cantilever spans (22.7m each) that extended from the abutments,
over the pier and into the centre span. Total former bridge span was 92m between the centerlines
of the abutment bearings, with a total width of 12.9m and total depth of 1.32m. On February 23,
2018, the bridge collapsed as a loaded dump truck was driving across. The structure has been
subsequently removed entirely with exception of the south abutment, pier piles and north
abutment footings. A temporary single lane panel bridge has been installed 150m downstream
to provide vehicular and pedestrian access across Catfish Creek until a new, permanent bridge is
constructed.
Airport Culvert (C09) - Is a 3.1m diameter corrugated steel pipe, installed in 1971 and located
on Quaker Road, just north of Elm Line in the Municipality of Central Elgin. During the spring
of 2018 a depression formed on the asphalt road surface immediately over the culvert, indicative
of a subsurface cavity. Quaker Road was immediately closed to ensure public safety and so that
the area could excavated and investigated. It was subsequently determined that fill surrounding
the culvert was being washed away from water infiltration at the culvert inlet and holes in the
bottom of the culvert. In the fall of2018 repairs were made to install a concrete apron wall and
concrete lining of the culvert floor to eliminate the possibility of water infiltration and fill
removal around the culvert barrel.
The age profile of County Structures itemized below in Table 5.4highlights that thisis just the start of a
growing need.
Page 39
66
Table 5.4 CountyStructure Age Profile
Ages0- 2425- 4950– 74>75
(Years)
Bridges9 14269
Culverts7 263417
Pedestrian
1
Tunnels
TOTAL16416026
Structure projects are complex, multi-faceted, multi-year projects with many stakeholders.Bridge
rehabilitation and reconstruction projects typically require environmental reviews andapprovals for water
crossings, assessments for the impact to Species at Risk (SARS) andappropriate mitigation measures,
railway approvals and flagging when working near CN or CPRail lines. If the structure is over 40 years
old, it has to be evaluated for Cultural Heritage. Oftenexisting servicing and utilities (Bell, Hydro, etc.) are
suspended below or attached to the side of a structure. Depending on the scope of work requiredon the
structure, all of these issues require additional effort to coordinate and work around duringdesign and
construction. While some structures are small, two lanebridges spanning a smallcreek, many others need
a significant commitment to fund a major rehabilitation or replacement.
B26 Jamestown Bridge – Deterioration and Delamination of Bearing Seat
With current budget allocations and the timeit takes to complete the environmental assessments, detailed
design and construction work required, multiple years of budget allocation are required to fund any one
project.
Another aspect of transportation structure rehabilitations or replacements that needs to be identified are the
impacts to mobility. These structures provide a connecting link over or under a natural or manmade barrier.
When it is necessary to close the structure to complete the work it often results in significant detours for
traffic to find another
route to traverse the barrier (river or rail line). With vehicles, this long detour is annoying but tolerable. For
pedestrians or cyclists, this detour may be challenging or excessive. However, the cost of a temporary
pedestrian/cyclist crossing can add $1millionto the cost of the project. On already tight budgets, these
temporary costs, if not included, result in significant disruption to the active transportation corridors within
Page 40
67
the County.
Transportation structures that bridge naturaland manmade barriers within our County form the links
between communities, support convenient and connected mobility choices, create beautiful places and
spaces, and with our heritage structures acknowledge the County’s history. Continued strong investment in
these assets is necessary to create a safe and accessible County that promotes a connected and vibrant
municipality.
5.4.Asset Management Policies
5.4.1.Approach to Data Assembly
The County currently manages a large amount of data and information stored in Excel databases. It is
recommended to continue that practice but to incorporate additional information related to all other assets
and create what is referred to as an enterprise database. This is critical for ongoing infrastructure
management activities within the County organization. The database used in preparation of the AMP
encompasses asset information that can support multiple business functions. Figure 5.6 and Figure 5.7
illustrate the concept of going from an ad-hoc data environment to a structured enterprise database.
Figure 5.6: Ad Hoc Environment
Figure 5.7: Recommended "Enterprise" Environment
The recommendation to use the Corporate GIS as the enterprise database is common practice in many
municipalities across Canada. Data is maintained in one environment, and accessible by many users.
Page 41
68
Relevant information can be exported in external applications for processing of data. The results can then
be imported back in the GIS database and accessed/displayed graphically which add value to the
information stored in databases. An enterprise database system reduces data redundancy and increases
access to information across the organization, and to County member municipalities. The County currently
lacks the required in-house GIS technologyhardware and personnel expertise,but staff across the
organization support the need to implement GIS more than ever before.
5.4.2.Condition Assessment Strategy
In continuing to maintain a detailed AMP over time, it is highly recommended that the County acquire
detailed condition assessment data on all components of their infrastructure assets. It is critical to ensure
the datais current and accurate, in order to maintain a useful AMP.
Roads should undergo a full condition assessment every 2-3 years. Given the shorter lifespan of road
structures, and high variability in road construction and environment, pavement condition indices are more
difficult to estimate over time. Therefore, their condition should be evaluated on a more frequent basis.
The approach for condition assessment of point assets, including bridges and culverts, is to follow the
mandated approach of inspection of the assets every 2 years.
5.4.3.MaintenanceActivities
It should be understood that most infrastructure assets will usually reach their expected service lives if
routine maintenance is carried out on those assets while in service.
Maintenance activities suchas crack sealing or slurry sealing a roadway or flushing and cleaning a sewer
pipe should be carried out on a regular basis depending on the condition and age of the assets. There are
many very good Computerized Maintenance Management Systems (CMMS) in the market that are very
helpful and efficient in ensuring sustainability of infrastructure assets.
Responsibility for maintenance of infrastructure is divided between the upper- and lower-tier municipalities
by way of respective agreements.Each municipality isresponsible for the majority of the day-to-day
maintenance of County infrastructure within its jurisdiction in accordance will all applicable provincial
regulations. Documenting all maintenance activities associated with such infrastructure through the use of
a single global CMMS is highly recommended for implementation.
5.5.AMP Update and Evaluation
The present AMP has been designed for a time span of 10 years. However, as previously mentioned it
should be treated as a living document, which is regularly updated to reflect changes in infrastructure
condition. It is, therefore, recommended that the AMP be updated every year. This will include
incorporating rehabilitations and their associated condition changes, adding newly constructed
infrastructure, removing decommissioned infrastructure from the analysis, and updating unit prices for
rehabilitation or reconstruction.
The AMP should also be continuously evaluated and improved through clearly defined actions. It is
recommended that the County generate a short-term action plan every 2 to 3 years including a timetable for
implementation. These actions should include measures to insure data quality, and improve the AMP
process.
Page 42
69
6.FINANCINGSTRATEGY
Financing infrastructure needs has become avery serious issue. We need to identify better practices and
innovations in infrastructure financing if municipalities and other levels of government want to continue to
provide an adequate level of service to tax payers in an affordable manner. It is often thought that municipal
infrastructure should be financed, as far as possible, by the residents who benefit from it but, how do you
determine who should pay for the rehabilitation of an arterial or collector road going from point A to point
B in large cities throughout Canada. In addition, for many years, municipal accounting practices have failed
to include replacement costs for depreciating assets, thereby assuring a fiscal shock when replacement time
arrives. The Ontario Governmenthas changed that practice,requiring municipalities to realize the extent
and magnitude of the infrastructure deficit. Asset managers need to come up with innovative solutions to
address that infrastructure deficit. Asset management systems are part of the solution but innovative
financing and finding alternate revenue sources are an even bigger part of thesolution.
Most municipalities are familiar with a variety of internal and some external revenue sources. The following
describes a few of those revenue sources currently being used by municipalities:
Internal Revenue Sources:
o Property Tax:Property tax will always be the largest source of funding for infrastructure.
Although reserves and debt can address the infrastructure deficit in the short-term,
infrastructure replacement is an ongoing cost that cannot be funded by ever increasing levels
of debt. This means that revenue must ultimately increase to fund the ongoing cost of
infrastructure replacement. Revenue increases must be pursued in all its forms: property tax,
provincial and federal funding, as well as fees and charges. Even if significant increases in
revenue are achieved in provincial/federal funding and in fees/charges, a significant increase
in property tax will still be required to make up the shortfall.
o Reserves: Recognizing that some infrastructure spending is unpredictableor outside of the
normal required investments found within the ten-year capital plan, Council sets aside funds in
Capital Reserves in order to have cash available when the need arises. To the extent that cash
is not set aside in advance of the need, Council can also use debt as an externalfunding source.
Typically for very large investments, a mix of reserves and debt is required.
o Special Assessments and Local Improvement Charges: A special assessment is a specific
charge added to the existing property tax to pay for improved capital facilities that border them.
The charge is based on a specific capital expenditure in a particular year, but may be spread
over a number of years.
o Development Charges(DC):Most large municipalities and many smaller ones impose a
specific dollar value per lot on developers to finance the off-site capital costs of new
development. Developers are generally responsible for on-site services, such as local roads,
sidewalks, and street lighting. Historically, development charges ha
services, such as water supply, sewage treatment, trunk mains androads.Development
Charges can be set by both the lower and upper-tier municipalities. In Elgin, only some lower-
tier municipalities use Development Charges. Those that do not have DCs use the lack of such
charges as an economic development incentive to attract developers. Those municipalities
Page 43
70
without these charges have opposed implementing Development Charges as the county level
in both of the two times that DCs have been proposed to County Council.
External RevenueSources
o Grants: Municipalities sometimes rely on provincial and federal government grants for
infrastructure. Program such as the MIII is a good example. In the past capital assistance has
also been made available for water, sewer, and transportation projects with all three levels of
government participating.
o Borrowing: Municipalities engage in both short-term and long-term borrowing. Short-term
borrowing may be used to finance temporary cashflow shortfalls.For cashflow shortfalls that
will extend for years, long-term borrowing is required. The cause of long-term cashflow
shortfalls is typically caused by large investments in infrastructure. A good example would be
the redevelopment of Terrace Lodge. Such alarge investment only happens every couple of
decades. Forthese type of infrastructure investmentswhose benefits accrue to future residents,
it can be argued that these projects should befinanced by borrowing with repayment coming
from property tax revenues and user fees paid by futurebeneficiaries. In the case of an
investment in roads, which should receive relatively consistent annual funding, debt financing
makes sense if there werehistorical shortfalls in the required investment that require a large
investment to address that shortfall.
New Financing Instruments
o A Dedicated Municipal Fuel Tax: Many American cities levy fuel taxes, but municipalities in
Canada do not. In a few Canadian cities and city-regions (Victoria, Vancouver, Edmonton,
Calgary, and Montreal), provincial fuel tax revenues are shared between the province and the
city or city-region. The federal government‘s recent initiative to provide grants to
municipalities from federal gas tax revenue is a form of revenue sharing and not amunicipal
fuel tax because the municipalities do not set fuel tax rates and have no say over the taxbase.
o Public-Private Partnerships (P3): A P3 involves the direct participation of the private sector
in a venture controlled by the public sector. The public sector role is to facilitate, regulate, and
guarantee provision of an asset and the private sector‘s role is to design, finance, build and
operate the asset in a formalized partnershipagreement.
6.1.County of Elgin Financing Strategy
The County has identified revenue sources that will support the Asset Management Plan (AMP) developed
through this report. The funding sources include:
Property Tax
Federal GasTax (FGT) and Ontario Community Infrastructure Fund (OCIF) base funding
Grants and other one-time funding sources
New TaxBase
Reserve/Debt Financing
Elgin receives $1.5 in FGT annually and a further $1.3 million in OCIF. Prior to 2016 OCIF funding was
$0.3 million. When the provinceincreased funding in 2016, the increase was not deemed to be ongoing.
Page 44
71
The three-year commitment has since been renewed, but the County’s 2019 ten-year plan assumed that
funding would be reduced by $0.9 million in 2021. The proposed 2020 ten-year plan is being modified to
assume that $1.3 million in OCIF will continue in perpetuity, thereby increasing funding to the plan by $8
million. Doing so will reduce the need to increase property taxes even further. However, if at some time
in the future, the province announces that they will not be fully renewing this funding level, Council will
need to reevaluate alternative solutions for funding. A one-time top-up of FGT of $1.6 million was received
in July 2019 and will be applied to fund the infrastructure plan.The County, where applicable, will also
seek Federal and Provincial funding through competitive grant programs, resulting in a potential funding
source.
The draft 2020 ten-year plan will allocate a quarterof the incremental tax revenue received from growth
resulting in new property assessment (growth assumed to average a conservative 1% annually) to fund
infrastructure, providing $1.1 million in funding. The remaining incremental tax revenue would be usedto
fund increases in operating costs to fund the increased service demands of the growing population. Council
could choose to vary the allocation amount or the assumed growth rate in order to reduce the proposed
property tax increase, keeping in mind the potential future implications.
The 2019 ten-year plan assumed that the County would undertake a $10 million loan finance portion of the
redevelopment of Terrace Lodge that could not be covered by Reserves. The incremental $46 million of
investment recommended in this Asset Management Plan will increase the debt by an estimated $25 million
and will result in over $4 million in interest payments over ten years.
The $46 million increase in investment proposed in Asset Management Plan will only partially be funded
by increases in the ten-year plan to OCIF, FGT and assessment growth net of interest payments, leaving a
shortfall of approximately $40 million. A gradual increase of property tax by an incremental 1.6 % over
ten years will provided the necessary funding.
The detailed financial model is being developed as part of the 2020 budgeting process and will be completed
with budget approval, anticipated to take place in February. As the model continues to evolve during this
time period, the above numbers will be refined as a higher level of accuracy is achieved through the new
budget model.
Page 45
72
7.CONCLUSION
Valued at approximately $831 million, the County’s roads, structures, and traffic infrastructure assets are
currently in overall good physical condition. Funding shortfalls in all asset groups will result in a
degradation of such assets over the next decade. The infrastructure gap willbecome visible to County
residents through rough roads, potholes, increased vehicle damage claims, reduced road safety, poor
pedestrian facilities and increased operating costs, bridge load restrictions, potential closures, and reduced
safety. County staffintends to deal with the infrastructure gap through long term strategic planning and
continued efforts to lobby senior levels of government for infrastructure funding. As seen in Figure 7.1
below, the total infrastructure gap will grow to approximately $47 millionin the next decade derived mainly
by the roads which composes about 89% of the Infrastructure Gap.
~ $47M
$4,976,284
26.4% Infrastructure Gap
Road Network
Bridges & Culverts
Optimal Expenditure
(10 Year Budget)
Current Funding
$165.9M
$41,978,476
(10 Year Budget)
$119M
Figure 7.1 Cumulative 10 Year Infrastructure Gap Visual (Transportation Services)
Page 46
73
REFERENCES
Canadian Federation of Municipalities. (2012). Canadian Infrastructure Report Card. Volume 1.
<http://www.canadainfrastructure.ca/downloads/Canadian_Infrastructure_Report_Card_EN.pdf>
Canadian Federation of Municipalities and Infrastructure Canada. (2002). National Guide to Sustainable
Municipal Infrastructure \[InfraGuide\].
Ministry of Infrastructure of Ontario. (2012). Building Together: Guide for Municipal Asset Management
Plans. <http://www.moi.gov.on.ca/pdf/en/Municipal%20Strategy_English_Web.pdf>
Department of Economics, Trent University (2006): A State of Disrepair: How to Fix the Financing of
Municipal Infrastructure in Canada, No. 241 ISSN 0824 – 8001
Page 47
74
APPENDIX A
Elgin County Road Network Documents
75
Structural Adequacy Rating
Structural Adequacy Rating (SAR)
ValueDistress***Actions*
20Distress <5%None
19-15Distress 5 -15 %Crack Sealing, Patching, Microsurfacing, R1, MR1
14-12Distress 16 -25%R1, MR1, PR1, CIREAM/R1
11-8Distress 26 -35%PR1, CIREAM/R1, MR2, PR2, Reconstruction
7-1Distress > 35%Reconstruction, Surface Treated Roads**
Notes:* Actions -are a guide and must also take into account:
-Capacity / Growth
-Drainage Requirements
-Roadside Environment
-Construction History
-Planned work by others
** Surface Treated Roads are posted at "half load" during spring thaw,
and are therefore not "Structurally Adequate" at all times.
***Distresses are deterioration features that affect the pavement's ability
to support traffic loads. Surface defects can become "structural distresses"
if they are moderate or severe, allowing water to enter the base.
Examples of Structural Distressesare:
-Moderate to Severe Transverse Cracks
-Aligator Cracks
-Moderate to Severe Map/Random Cracks
-Wheel Track Rutting
-Moderate to Severe Longituduinal Cracks (CL)
-Frost Heaving / Boils
-Surface Ponding
Culverts -Page 2of 2
-Pavement Edge Break up / Creep
Actions to be scheduled before SAR worsens and changes proposed action.
76
NEEDS CODES
2019 Road Capital Improvement Cost / km
Surface TreatmentMSingle Surface Treatment ($4/m2)$ 30,000.00
MicrosurfacingSingle Micro Surfacing w/tack ($4/m2)
SST or Micro w/ShouleringMSSingle Micro/SST + 400t/km Shouldering at $25/t$ 40,000.00
Double MicrosurfacingM2Double Microsurfacing ($7/m2) + Shouldering$ 62,500.00
FibreMAT + Shouldering
Bonded Wearing Course + Shouldering
Pulverize Double Surface Tr.PDSTPulverize / Grade / Water / Compact$ 32,000.00
50mm Granular A$ 20,000.00
DST ($6/m2)$ 48,000.00
$ 100,000.00
Resurfacing R150mm Hot Mix Asphalt ($85/t)$ 95,000.00
MR1Granular Shouldering ($25/t)$ 30,000.00
$ 125,000.00
Pulverize + R1PR1Pulverize, Grade and Compact$ 10,000.00
50mm Granular A$ 20,000.00
50mm Hot Mix Asphalt ($85/t)$ 95,000.00
Minor Shouldering (1m wide)$ 10,000.00
$ 135,000.00
Surface RehabilitationR2Pulverize (milling) / Pack / Water ($3/m2)$ 35,000.00
MR2/PR2100mm Hot Mix Asphalt ($85/t)$ 175,000.00
CIP/R1Granular Shouldering ($25/t)$ 40,000.00
$ 250,000.00
Rural ReconstructionRRECGranular A (0.15mx14mx2.4x$20)$ 100,000.00
Granular B (0.45m x 14m x 2.4 x $20)$ 300,000.00
Drainage (culverts, ditching, drains)$ 250,000.00
Safety$ 25,000.00
150mm Hot Mix Asphalt ($85/t)$ 325,000.00
Granular Shouldering ($25/t)$ 50,000.00
Engineering (15%)$ 150,000.00
$ 1,200,000.00
Urban ReconstructionURECExcavation / Road Base$ 450,000.00
*updated with Sparta Milling / Asphalt$ 450,000.00
tender results Nov. 2019 Drainage (Storm Sewers, Curb and Gutter)$ 650,000.00
Eng. / Restoration / Utilities / Misc.$ 400,000.00
Culverts -Page 3of 2
$ 1,950,000.00
CULVRoad Crossing Culvert Replacement/Lining$ 100,000.00
Widening Rural Recon.WRRECLand / Utilities$ 300,000.00
Granular A (0.15mx14mx2.4x$20)$ 100,000.00
Granular B (0.45m x 14m x 2.4 x $20)$ 300,000.00
Drainage (culverts, ditching, drains)$ 250,000.00
Safety$ 25,000.00
150mm Hot Mix Asphalt ($85/t)$ 325,000.00
Granular Shouldering ($25/t)$ 50,000.00
Engineering (15%)$ 200,000.00
$ 1,550,000.00
77
Desired Level of Service
ROAD DESIGN STANDARDS
Class 1Class 2Class 3Class 4
Lane Width (m)3.753.753.253
Shoulder Width (m)2.52.521*
* farm entrances 45m wide upon reconstruction
Horizontal and Vertical
Curves Design Speed
Over Posted Speed Limit20km/h20km/h10km/h0km/h
Safe Stopping Sight Distance
(speed over posted limit)20km/h20km/h20km/h0km/h
Drainage -Flood Return100 year50 year50 year2 year
Collision Rating1
(Collisions per million km driven)
System Wide Condition Rating80%
"Roads in Good to VeryGood
Condition" -F.I.R.
SAR > 15
Culverts -Page 4of 2
78
5,0005,000
73,643 94,620 25,000 17,000
250,000260,270175,000316,304271,950210,000190,000
7,680,0003,893,9803,717,6001,461,8003,778,5505,505,4755,449,095
46,832,697
165,919,760 199,300,047 152,467,350
Grand Total
2029
25,00010,00031,71220,00034,88420,00020,00020,000
700,000602,820449,600200,000398,335536,664718,755
6,045,661
18,427,800 22,215,569 16,169,908
2028
8,500
25,00010,00031,71216,00034,88420,00020,00020,000
350,000602,820449,600200,000435,479605,369560,522
5,603,504
18,066,470 21,456,355 15,852,851
2027
25,00010,00031,71214,00034,88420,00020,00020,000
350,000602,820449,600200,000382,792550,124454,627
3,564,548
15,941,000 19,106,559 15,542,011
2026
25,00038,64310,00031,71213,00034,88420,00020,00020,000
100,000602,820449,600200,000375,272512,769914,376
5,824,387
17,364,927 20,733,003 14,908,616
2025
25,00050,00010,00031,71213,00034,88420,00020,00020,000
364,300306,600156,800367,915629,306436,973
4,273,662
17,024,438 19,510,928 15,237,266
2024
25,00050,00010,00031,71213,00034,88420,00020,00020,000
297,900291,600140,000360,717440,028428,405
(933,895)
11,528,444 13,711,689 14,645,584
79
2023
5,0005,0005,0008,500
25,00010,00012,00052,00020,00020,00020,000
100,000387,000140,000398,674588,387638,234
1,780,000 3,652,923
13,969,172 18,183,967 14,531,044
2022
25,00010,00012,00020,00020,00020,00020,000
365,000135,000259,750150,000346,759497,780497,727
5,809,194
17,997,593 20,376,610 14,567,416
2021
25,00035,00015,00012,00015,00086,95020,00020,000
620,000135,000328,750339,979520,501403,696
3,772,330
16,274,916 18,851,792 15,079,462
2020
25,00034,62035,00050,00020,00075,00020,00025,00030,00010,000
450,500345,500372,628624,547395,780
3,315,000 9,220,383
19,325,000 25,153,575 15,933,192
II) Capital
Corporate ActivitiesAgricultureAdministrative BuildingEngineering ServicesBobier Villa Building & PropertyBobier Villa DietaryBobier Villa HousekeepingBobier Villa Nursing & Personal
CareElgin Manor Building & PropertyElgin Manor DietaryElgin Manor HousekeepingElgin Manor Nursing & Personal CareTerrace Lodge Building & PropertyTerrace Lodge HousekeepingTerrace Lodge
Nursing & Personal CareArchivesMuseumLibrary ServicesInformation TechnologyAmbulanceEconomic Development
0) CORPORATE ACTIVITIES 2) ADMINISTRATIVE SERVICES 5) ADMINISTRATION BUILDING 7) ENGINEERING SERVICES 8) HOMES FOR SENIORS SERVICES 9) MUSEUM/ARCHIVES10) LIBRARY SERVICES11) INFORMATION
TECHNOLOGIES14) AMBULANCE & EMERGENCY SERVICES15) ECONOMIC DEVELOPMENT & TOURISM
Grand Total Prior Plan Increase/(Decrease)
250,000
250,000
Grand Total
2029
25,000
25,000
2028
25,000
25,000
2027
25,000
25,000
2026
25,000
25,000
2025
25,000
25,000
2024
25,000
25,000
2023
25,000
25,000
80
2022
25,000
25,000
2021
25,000
25,000
2020
25,000
25,000
Corporate ActivitiesII) Capital Column Labels
0000072 Ambulance Bldg R & M
Capital Assets - Work in Progress
5) Capital WIP
DescriptionOpCap Sum of BudgetRow LabelsGrand Total
73,643
73,643
81
Grand Total
2026
38,643
38,643
2021
35,000
35,000
AgricultureII) Capital Column Labels
0000005 Truck KCCA
Capital Assets - Work in Progress
5) Capital WIP
DescriptionOpCap Sum of BudgetRow LabelsGrand Total
75,00015,00035,00010,000
250,000150,000265,000125,000950,000230,000275,000120,000175,000100,000150,000100,000
2,580,0002,075,000 7,680,000
Grand Total
2029
75,00025,000
150,000350,000100,000
700,000
2028
50,00075,000
125,000100,000 350,000
2027
350,000
350,000
2026
50,00050,000
100,000
2025
50,000
50,000
2024
50,000 50,000
2023
50,000 15,000 60,000 30,000
125,000
1,500,000 1,780,000
2022
50,00015,00025,00035,000
240,000
365,000
82
2021
25,00050,00025,00035,00050,000
250,000185,000 620,000
2020
15,00015,00035,00060,00010,000
150,000 100,000 250,000 100,000
2,580,000 3,315,000
Administrative BuildingII) Capital Column Labels
0000021 Exterior Building Capital Repairs/Parking0000023 Building Automation System Upgrades - Admin0000024 Cooling Tower Replacement - Admin0000026 Window Replacement0000028 Roof Repairs0000029
Interior Renovations0000035 Building HVAC0000036 Elevator0000037 Accessibility/Major Capital Maintenance0000040 Building Envelope Repairs0000041 Roof Repairs - Admin0000042 Energy Savings
- Electrical Upgrades0000043 Asbestos Removal0000044 Security Improvement - Card Access & Alarms0000045 Accessibility - Basement Hallway Handrails0000047 Electrical Upgrades0000048
Carpeting0000049 Landscaping
Capital Assets - Work in Progress
5) Capital WIP
DescriptionOpCap Sum of BudgetRow LabelsGrand Total
97,02064,99967,17473,746
746,646646,136823,217650,000314,184380,502230,000114,610248,116574,343790,000393,271347,546390,000122,400927,564287,171460,000400,554317,036585,866867,258540,600
3,021,6751,326,5102,473,9822,350,4981,524,8801,623,9542,288,7561,343,9622,883,2012,776,9481,119,9693,321,7121,669,0402,723,4422,543,7781,934,8471,223,3501,100,0001,033,7232,009,4002,293,0822,144,5505
,045,0001,665,5941,063,159
Grand Total
2029
2028
2027
746,646646,136380,502248,116574,343927,564287,171867,258
3,021,6752,473,9822,350,4981,524,8801,623,9542,288,7561,343,9622,883,2012,776,9481,119,9693,321,7121,669,0401,223,3501,665,594
2026
2025
2024
585,866
2,617,3211,934,8471,033,723
2023
64,99967,174
314,184114,610106,121347,546317,036
1,326,510
2022
52,020
823,217393,271400,554
2,543,7782,191,0821,063,159
83
2021
73,746
122,400102,000540,600
2,009,4002,144,550
2020
45,000
650,000230,000790,000390,000460,000
1,100,0005,045,000
Engineering ServicesII) Capital Column Labels
0000038 Road 2 Reconstruction - (West Lorne)0000039 Road 2 Rehabilitation - (West Lorne to Rd 5)0000040 Road 2 Rehabilitation - (Rd 5 to Eckker Drain)0000041 Road 2 Rehabilitation (Ecker
Drain to Rd 8)0000042 Road 3 Resurfacing (McPherson to Dunborough Rd)0000043 Road 3 Resurfacing (Dunborough Rd to Iona Rd)0000044 Road 3 Resurfacing (Iona Rd to Shedden)0000045 Road
3 Resurfacing (Shedden to Talbotville)0000046 Road 4 Resurfacing (St. Thomas to Carlow Road)0000047 Road 4 Rehabilitation (Hwy3/4 to City limits)0000048 Road 5 Surface Treatment0000050
Road 7 Resurfacing (50% with C/K)0000051 Road 8 Resurfacing - Dutton0000052 Road 8 Rehabilitation (Hwy 401 to Thames River)0000053 Road 9 Surface Treatment (Rd 103 to Rd 76)0000054
Road 9 Microsurfacing (Rd 76 to Rd 5)0000055 Road 9 Microsurfacing (Rd 5 to Rd 8)0000057 Road 11 Rehabilitation0000058 Road 13 Reconstruction (Dutton)0000059 Road 14 (Rd 16 to Rd 3)
Rehabilitation + SLOPE at Iona Bridge0000060 Road 14 (Rd 3 to Thames River) Rehabilitation0000061 Road 16 - Port Talbot Hill Drainage Rehabilitation0000062 Road 16 Rehabilitation (8
to 14)0000063 Road 16 Rehabilitation (14 to Fingal)0000064 Fingal Reconstruction (16 and 20)0000065 Road 16 Rehabilitation (Fingal to City)0000067 Road 18 (Rd 20 to Rd 119) Rehabilitation0000068
Road 18 (Rd 119 To GL entrance)0000069 Road 19 Resurfacing - Straffordville0000070 Road 19 Resurfacing - Eden0000071 Road 20 Resurfacing (Rd 21 to Thomas Road)0000072 Road 20 (Thomas
Rd to Fingal) Rehabilitation0000073 Road 20 (Shedden) Resurfacing0000074 Road 20 Rehabilitaiton (Shedden to Road 18)0000075 Road 22 Rehabilitation (Rd 24 to Rd 27)0000076 Road 24 Rehabilitation
(East Road to 1km east)0000077 Road 24 (Rd 23 to Yarmouth Centre Road) Resurfacing (paved shoulders)0000078 Road 24 Rehabilitation (Yarmouth Centre to Quaker Road)0000079 Road 25 Rehabilitation
(incl. 0.5m PPS)0000080 Road 26 (Rd 25 to RR Tracks) Reconstruction0000081 Road 27 Surface Treatment (20 to Townline)0000082 Road 27 Rehabilitation - Union to Sparta0000083 Road 28
(Rd 45 to Rd 56) Resurfacing0000084 Wonderland Road Reconstruction0000085 Road 31 Rehabilitation0000086 Road 32 Rehabilitation0000087 Road 35 Microsrufacing (45 to Hwy 3)0000088 Road
35 Resurfacing (Hwy 3 to Rd 52)0000089 Road 36 (Rd 24 to Sparta) Rehabilitation0000090 Road 36 Resurfacing (Sparta to Rd 45) - paved shoulders0000091 Road 36 Resurfacing (Rd 45 to Hwy
3) - paved shoulders0000092 Road 37 (Avon to Oxford) Microsurfacing
Capital Assets - Work in Progress
5) Capital WIP
DescriptionOpCap Sum of BudgetRow Labels
20,00085,00051,000
493,935336,600173,614530,604170,209304,317255,000574,343806,952390,553773,939430,757330,000930,435841,412366,741275,133157,944282,864729,415480,000150,000105,000234,090572,220416,160
1,907,6143,673,4971,530,7931,467,1593,822,2521,430,1141,846,5021,045,5001,044,5001,785,4821,124,3761,768,9761,523,5231,246,9501,400,0001,507,2872,779,8192,154,2527,251,0783,696,0211,658,4153,571,0801
,780,4633,770,0003,279,059
Grand Total
2029
2028
2027
493,935574,343806,952390,553430,757930,435841,412275,133157,944282,864729,415
3,673,4971,467,1593,822,2521,430,1141,768,9762,779,8197,251,0781,658,4151,780,4631,723,029
2026
2025
2024
773,939270,608
1,124,3761,523,5231,507,287
2023
173,614530,604265,302
1,530,7931,846,5021,785,4822,154,252
2022
170,209304,317366,741312,120234,090572,220416,160
1,805,6143,696,021
84
2021
51,000
102,000336,600255,000994,500408,000
1,045,5001,246,9503,421,080
2020
50,00020,00085,000
330,000150,000480,000300,000150,000105,000
1,400,0003,770,000
Engineering ServicesII) Capital Column Labels
0000093 Road 38 Rehabilitation (Hwy 3 to Richmond)0000094 Richmond Reconstruction (Rd 38 and 43) - Eng. 20210000095 Road 38 Reconstruction (Straffordville)0000096 Road 39 Resurfacing0000097
Road 40 Microsurfacing (42 to 45)0000098 Road 40 Rehabilitation (Rd 45 to Hwy 3)0000099 Road 41 Reconstruction0000100 Road 42 Rehabilitation (73 to 43)+drainage at Silvercreek Hill0000101
Road 42 Rehabilitation (43 to Port Burwell)0000102 Road 19, 50 and 42 Resurfacing - Port Burwell0000103 Road 42 FDR/DST (Glen Erie Line 19 - 55) - Survey 20200000104 Road 43 Microsurfacing
(42 to 45)0000105 Road 44 Rehabilitation (Rd 46 to Hwy #3)0000106 Road 44 Resurfacing (Murray Rd to Hwy 3)0000107 Road 44 Resurfacing (Murray Rd to 19)0000108 Road 45 Rehabilitation
(3 to 16)0000109 Shaw Hill Drainage Improvements (rd 45)0000110 Road 45 (Rd 16 to Rd 4) Rehabilitation0000111 Road 45 (Rd 35 to Rd 73) Rehabilitation0000112 Road 45 (Rd 40 to Rd 43)
Rehabilitation0000113 Road 45 (Rd 19 to 55) Resurfacing0000114 Road 47 Resurfacing (Rd 48 to Rd 52)0000115 Road 47 Rehabilitation (48 to 37) widen radius at 480000116 Road 48 FDR/ R1
(25 to 30)0000117 Road 48 FDR/R1 (Road 30 to Rd 74)0000118 Road 48 Rehabilitation (Rd 73 to Rd 47)0000119 Road 48 Rehabilitation (Rd 47 to Rd 54)0000120 Road 51 Rehabilitation (4 to
Whites Station)0000121 Road 52 Rehabilitation (Highway #3 to 30) + Drainage at Kettle Creek0000122 Road 52 Microsurfacing (30 to 74)0000123 Road 52 Rehabilitation (74 to 73)0000124
Road 52 Rehabilitation (Rd 73 to Springfield)0000125 Springfield Reconstruction (Rd 52, 40, 49)0000126 Road 52 Rehabilitation (Rd 47 to Rd 54)0000127 Road 54 Rehabilitation (50% Oxford)0000128
Road 55 Microsurfacing (42 to 45)0000129 Road 57 Rehabilitation0000130 Port Bruce Resurfacing (MR1)0000131 Road 73 Rehabilitation (Aylmer to Avon Drive)0000132 Road 74 Resurfacing0000133
Road 74 Resurfacing (Belmont)0000134 Rodney Reconstruction (103 and 104)0000135 Road 104 Rehabilitation (Rodney to McPherson Rd)0000136 King George Lift Bridge Rehabilitation0000139
Kimble Bridge Replacement0000142 Culvert Rehabilitations0000144 Road 11 Shouldering0000145 Road 16 Shouldering0000147 Sunset at Talbotville Gore Turning Lanes (additional to Rehab.
Project)0000148 Imperial Road Turning Lane (north of College Line)0000154 Wellington Road at McBain Line Traffic Signal Engineering0000156 Multiple Bridge and Culvert Repair Tender
- Engineering and Admin.0000159 Elm Street at Centennial Road Intersection Imrpovements0000160 Wellington Road at McBain Line Traffic Signals
DescriptionOpCap Sum of BudgetRow Labels
0
68,92145,94734,46111,48745,000
156,060260,100344,606287,171172,303172,303114,869172,303574,343172,303172,303918,949201,020574,343574,343574,343280,000999,090150,000156,953250,000402,040125,000
1,591,8121,837,8971,723,0291,148,6863,446,0571,525,0002,600,0001,120,5001,875,0971,246,4401,092,4201,326,5102,297,3711,780,463
165,919,760
Grand Total
2029
18,427,800
18,427,800
2028
18,066,470
18,066,470
2027
68,92145,94734,46111,487
344,606287,171172,303172,303114,869172,303574,343172,303172,303918,949201,020574,343574,343574,343402,040
1,837,8971,723,0291,148,6863,446,0571,768,9762,297,3711,780,463
15,941,000
(70,883,635)
2026
17,364,927
17,364,927
2025
17,024,438
17,024,438
2024
156,953
11,528,444
2023
106,121
1,591,8121,326,510
13,969,172
2022
156,060260,100
1,144,4401,092,420
17,997,593
85
2021
999,090102,000
1,275,0001,045,500
16,274,916
2020
75,00045,000
280,000150,000250,000250,000125,000
2,600,000
19,325,000
Engineering ServicesII) Capital Column Labels
0000161 Talbot Line (Talbotville) new development access0000162 Talbot Line and Sunset Road Traffic Signal Optimization (MTO)0000164 Multiple Bridge and Culvert Repair Tender0000168
Furnival Road and Hoskins Line Intersection Improvements0000169 Colborne and Warren Street Intersection Improvements0000170 Sunset Road at East Road Intersection Improvements0000171
East Road at Hill Street Intersection Improvements0000172 Sunset Road at Southdale Line Signal Optimization0000173 Sunset Road at Glenwood Avenue Left Turn Lane0000174 Sunset Road at
Sparta Line Traffic Signals and Intersection Improvements0000175 Ron McNeil Line at Omemee Street Intersection Improvements0000176 Whittaker Road and Nelson Street Intersection Improvements0000177
Belmont West Bridge Replacement - B320000179 King Bridge Replacement - B380000180 Calton Bridge Rehabilitation - B470000183 Walkers Bridge Rehabilitation - B030000184 Willeys Bridge
Repairs - B050000185 Gillets Bridge Repairs - B270000186 Lings Bridge Deck Repairs - B160000187 Dodds Creek Bridge Repairs - B600000188 Glen Erie West Bridge Removal and Culvert Installation0000189
Road Sign Replacements West Half0000190 Road Sign Replacements East Half0000191 Highbury Ave. Slope Rehabilitation0000193 Traffic Signal Replacements0000194 Road 9 Surface Treatment
(Rd 8 to Rd 14)0000195 Road 18 (Rd 14 to Rd 20) Rehabilitation0000196 Sparta Reconstruction0000197 Road 34 Resurfacing0000230 Meeks Bridge Replacement0000233 Port Bruce Bridge Replacement0000259
Bothwell Bridge Rehabilitation0000260 Iona Road Replacement (EA and possible road realignment)0000261 St. George Street Bridge Rehabilitation0000264 Port Burwell Major Rehabilitation
- B450000265 Eden Bridge Rehabilitation - B530000266 Wonderland Road and Talbot Line EA partnered with MTO0000267 Road Sign Replacements0000268 Capital Budget years 6-10 smoothing0000269
Port Burwell Storm Sewer Replacement (Phase 1C)0000270 Port Burwell Storm Sewer Replacement (Phase 1D)0000271 Port Burwell Storm Sewer Replacement (west of Chatham St.) - 20250000272
Port Burwell Storm Sewer Replacement (north of Wellington St) - 2027
DescriptionOpCap Sum of BudgetRow LabelsGrand Total
25,000 65,000 15,000 10,000 30,000 25,000 20,000 10,000 75,000 30,000
140,000
3,448,980 3,893,980
Grand Total
2029
602,820
602,820
2028
602,820
602,820
2027
602,820
602,820
2026
602,820
602,820
2025
364,300
364,300
2024
297,900
297,900
2023
100,000
100,000
2022
135,000
135,000
2021
135,000
135,000
86
2020
5,500
25,000 65,000 15,000 10,000 30,000 25,000 20,000 10,000 75,000 30,000
140,000
450,500
Bobier Villa Building & PropertyII) Capital Column Labels
0000018 Security/Resident Safety0000022 Misc Bldg0000030 Parking Lot Resurfacing0000031 Caulking/Weatherproofing Windows0000032 Flat Roof0000033 Energy Savings - Parking Lot Lighting
Improvements0000034 Building Envelope & Eavestrough Repairs0000035 Building Automation System0000036 Flooring Replacement0000037 Energy Savings - Electrical Upgrades0000039 Tub Room
Upgrades0000040 Landscaping
Capital Assets - Work in Progress
5) Capital WIP
DescriptionOpCap Sum of BudgetRow LabelsGrand Total
ВЍͲЏЋЉ
94,620
Grand Total
2029
ЊЉͲЉЉЉ
10,000
2028
ЊЉͲЉЉЉ
10,000
2027
ЊЉͲЉЉЉ
10,000
2026
ЊЉͲЉЉЉ
10,000
2025
ЊЉͲЉЉЉ
10,000
87
2024
ЊЉͲЉЉЉ
10,000
2020
ЌЍͲЏЋЉ
34,620
.ƚĬźĻƩ źƌƌğ 5źĻƷğƩǤLLΜ /ğƦźƷğƌ Column Labels
ЉЉЉЉЉЊБ YźƷĭŷĻƓ 9ƨǒźƦƒĻƓƷ
Capital Assets - Work in Progress
5) Capital WIP
5ĻƭĭƩźƦƷźƚƓhƦ/ğƦ Sum of BudgetRow LabelsGrand Total
ЎͲЉЉЉ
5,000
Grand Total
88
2023
ЎͲЉЉЉ
5,000
.ƚĬźĻƩ źƌƌğ IƚǒƭĻƉĻĻƦźƓŭLLΜ /ğƦźƷğƌ Column Labels
ЉЉЉЉЉЊЋ aźĭƩƚŅźĬƩĻ /ƌĻğƓźƓŭ {ǤƭƷĻƒ
Capital Assets - Work in Progress
5) Capital WIP
5ĻƭĭƩźƦƷźƚƓhƦ/ğƦ Sum of BudgetRow LabelsGrand Total
ЊЌЉͲЉЉЉЊЌЉͲЋАЉ 260,270
Grand Total
2029
ЊЉͲЉЉЉЋЊͲАЊЋ 31,712
2028
ЊЉͲЉЉЉЋЊͲАЊЋ 31,712
2027
ЊЉͲЉЉЉЋЊͲАЊЋ 31,712
2026
ЊЉͲЉЉЉЋЊͲАЊЋ 31,712
2025
ЊЉͲЉЉЉЋЊͲАЊЋ 31,712
2024
ЊЉͲЉЉЉЋЊͲАЊЋ 31,712
2023
ЊЉͲЉЉЉ 10,000
2022
ЊЉͲЉЉЉ 10,000
89
2021
ЊЎͲЉЉЉ 15,000
2020
ЌЎͲЉЉЉ 35,000
.ƚĬźĻƩ źƌƌğ bǒƩƭźƓŭ ε tĻƩƭƚƓğƌ /ğƩĻLLΜ /ğƦźƷğƌ Column Labels
ЉЉЉЉЉЊВ \[źŅƷƭ ε {ĭğƌĻƭЉЉЉЉЉЌА aźƭĭ bt/
Capital Assets - Work in Progress
5) Capital WIP
5ĻƭĭƩźƦƷźƚƓhƦ/ğƦ Sum of BudgetRow LabelsGrand Total
15,00015,00010,00030,00025,00025,00010,00025,00020,00040,00025,000
100,000
3,377,600
3,717,600
Grand Total
2029
449,600
449,600
2028
449,600 449,600
2027
449,600
449,600
2026
449,600 449,600
2025
306,600
306,600
2024
291,600 291,600
2023
387,000
387,000
2022
259,750 259,750
2021
328,750
328,750
2020
90
5,500
15,000 15,000 10,000 30,000 25,000 25,000 10,000 25,000 20,000 40,000 25,000
100,000 345,500
Elgin Manor Building & PropertyII) Capital Column Labels
0000016 Pumps & Equipment (STP)0000022 HVAC0000025 Misc Bldg0000031 140 Hotwater Tank Re-lining0000032 Security Improvements - NVR Cameras0000033 Flat Roof Repairs0000034 Sidewalk Repairs0000035
Building Automation System0000036 Flooring Replacement0000037 Energy Savings - Electrical Upgrades0000038 Spa Renovation0000040 Refurbishment of Train #20000041 Misc. Maintenance, Calibration
& Lifecycle Equipment Replacement
Capital Assets - Work in Progress
5) Capital WIP
DescriptionOpCap Sum of BudgetRow LabelsGrand Total
ЊАЎͲЉЉЉ
175,000
Grand Total
2029
ЋЉͲЉЉЉ
20,000
2028
ЊЏͲЉЉЉ
16,000
2027
ЊЍͲЉЉЉ
14,000
2026
ЊЌͲЉЉЉ
13,000
2025
ЊЌͲЉЉЉ
13,000
2024
ЊЌͲЉЉЉ
13,000
2023
ЊЋͲЉЉЉ
12,000
91
2022
ЊЋͲЉЉЉ
12,000
2021
ЊЋͲЉЉЉ
12,000
2020
ЎЉͲЉЉЉ
50,000
9ƌŭźƓ ağƓƚƩ 5źĻƷğƩǤLLΜ /ğƦźƷğƌ Column Labels
ЉЉЉЉЉЊВ YźƷĭŷĻƓ 9ƨǒźƦƒĻƓƷ
Capital Assets - Work in Progress
5) Capital WIP
5ĻƭĭƩźƦƷźƚƓhƦ/ğƦ Sum of BudgetRow LabelsGrand Total
ЎͲЉЉЉ
5,000
Grand Total
92
2023
ЎͲЉЉЉ
5,000
9ƌŭźƓ ağƓƚƩ IƚǒƭĻƉĻĻƦźƓŭLLΜ /ğƦźƷğƌ Column Labels
ЉЉЉЉЉЊЋ aźĭƩƚŅźĬƩĻ /ƌĻğƓźƓŭ {ǤƭƷĻƒ
Capital Assets - Work in Progress
5) Capital WIP
5ĻƭĭƩźƦƷźƚƓhƦ/ğƦ Sum of BudgetRow LabelsGrand Total
ЊАЊͲЉЉЉЊЍЎͲЌЉЍ 316,304
Grand Total
2029
ЊЏͲЉЉЉЊБͲББЍ 34,884
2028
ЊЏͲЉЉЉЊБͲББЍ 34,884
2027
ЊЏͲЉЉЉЊБͲББЍ 34,884
2026
ЊЏͲЉЉЉЊБͲББЍ 34,884
2025
ЊЏͲЉЉЉЊБͲББЍ 34,884
2024
ЊЏͲЉЉЉЊБͲББЍ 34,884
2023
ЋЉͲЉЉЉЌЋͲЉЉЉ 52,000
2022
ЋЉͲЉЉЉ 20,000
93
2021
ЊЎͲЉЉЉ 15,000
2020
ЋЉͲЉЉЉ 20,000
9ƌŭźƓ ağƓƚƩ bǒƩƭźƓŭ ε tĻƩƭƚƓğƌ /ğƩĻLLΜ /ğƦźƷğƌ Column Labels
ЉЉЉЉЉЊВ \[źŅƷƭ ε {ĭğƌĻƭЉЉЉЉЉЌА aźƭĭ bt/
Capital Assets - Work in Progress
5) Capital WIP
5ĻƭĭƩźƦƷźƚƓhƦ/ğƦ Sum of BudgetRow LabelsGrand Total
АЎͲЉЉЉ
ЊͲЌБЏͲБЉЉ 1,461,800
Grand Total
2029
ЋЉЉͲЉЉЉ 200,000
2028
ЋЉЉͲЉЉЉ 200,000
2027
ЋЉЉͲЉЉЉ 200,000
2026
ЋЉЉͲЉЉЉ 200,000
2025
ЊЎЏͲБЉЉ 156,800
2024
ЊЍЉͲЉЉЉ 140,000
2023
ЊЍЉͲЉЉЉ 140,000
94
2022
ЊЎЉͲЉЉЉ 150,000
2020
АЎͲЉЉЉ 75,000
ĻƩƩğĭĻ \[ƚķŭĻ .ǒźƌķźƓŭ ε tƩƚƦĻƩƷǤLLΜ /ğƦźƷğƌ Column Labels
ЉЉЉЉЉЊА aźƭĭ /ğƦźƷğƌЉЉЉЉЉЋЉ \[ğǞƓ {źŭƓ wĻƦƌğĭĻƒĻƓƷ
Capital Assets - Work in Progress
5) Capital WIP
5ĻƭĭƩźƦƷźƚƓhƦ/ğƦ Sum of BudgetRow LabelsGrand Total
ЎͲЉЉЉ
ЋЉͲЉЉЉ
25,000
Grand Total
2023
ЎͲЉЉЉ
5,000
95
2020
ЋЉͲЉЉЉ
20,000
ĻƩƩğĭĻ \[ƚķŭĻ IƚǒƭĻƉĻĻƦźƓŭLLΜ /ğƦźƷğƌ Column Labels
ЉЉЉЉЉЊЌ aźĭƩƚŅźĬƩĻ /ƌĻğƓźƓŭ {ǤƭƷĻƒЉЉЉЉЉЊЍ IƚǒƭĻƉĻĻƦźƓŭ 9ƨǒźƦƒĻƓƷ
Capital Assets - Work in Progress
5) Capital WIP
5ĻƭĭƩźƦƷźƚƓhƦ/ğƦ Sum of BudgetRow LabelsGrand Total
ЏЊͲВЎЉ
ЋЊЉͲЉЉЉ
271,950
Grand Total
2029
ЋЉͲЉЉЉ
20,000
2028
ЋЉͲЉЉЉ
20,000
2027
ЋЉͲЉЉЉ
20,000
2026
ЋЉͲЉЉЉ
20,000
2025
ЋЉͲЉЉЉ
20,000
2024
ЋЉͲЉЉЉ
20,000
2023
ЋЉͲЉЉЉ
20,000
2022
ЋЉͲЉЉЉ
20,000
96
2021
ЋЎͲЉЉЉЏЊͲВЎЉ
86,950
2020
ЋЎͲЉЉЉ
25,000
ĻƩƩğĭĻ \[ƚķŭĻ bǒƩƭźƓŭ ε tĻƩƭƚƓğƌ /ğƩĻLLΜ /ğƦźƷğƌ Column Labels
ЉЉЉЉЉЊВ \[źŅƷƭ ε {ĭğƌĻƭЉЉЉЉЉЋЉ .Ļķ wĻƦƌğĭĻƒĻƓƷƭ
Capital Assets - Work in Progress
5) Capital WIP
5ĻƭĭƩźƦƷźƚƓhƦ/ğƦ Sum of BudgetRow LabelsGrand Total
210,000
210,000
Grand Total
2029
20,000
20,000
2028
20,000 20,000
2027
20,000
20,000
2026
20,000 20,000
2025
20,000
20,000
2024
20,000 20,000
2023
20,000
20,000
97
2022
20,000 20,000
2021
20,000
20,000
2020
30,000 30,000
ArchivesII) Capital Column Labels
0000031 Misc Capital - Archives
Capital Assets - Work in Progress
5) Capital WIP
DescriptionOpCap Sum of BudgetRow LabelsGrand Total
ЊВЉͲЉЉЉ 190,000
Grand Total
2029
ЋЉͲЉЉЉ
20,000
2028
ЋЉͲЉЉЉ 20,000
2027
ЋЉͲЉЉЉ
20,000
2026
ЋЉͲЉЉЉ 20,000
2025
ЋЉͲЉЉЉ
20,000
2024
ЋЉͲЉЉЉ 20,000
2023
ЋЉͲЉЉЉ
20,000
98
2022
ЋЉͲЉЉЉ 20,000
2021
ЋЉͲЉЉЉ
20,000
2020
ЊЉͲЉЉЉ 10,000
aǒƭĻǒƒLLΜ /ğƦźƷğƌ Column Labels
ЉЉЉЉЉЌЌ aǒƭĻǒƒ Ώ aźƭĭ /ğƦźƷğƌ
Capital Assets - Work in Progress
5) Capital WIP
5ĻƭĭƩźƦƷźƚƓhƦ/ğƦ Sum of BudgetRow LabelsGrand Total
39,29690,000
350,000
3,299,254
3,778,550
Grand Total
2029
35,000
363,335
398,335
2028
35,00045,000
355,479
435,479
2027
35,000
347,792
382,792
2026
35,000
340,272
375,272
2025
35,000
332,915
367,915
2024
35,000
325,717
360,717
2023
35,00045,000
318,674
398,674
99
2022
35,000
311,759
346,759
2021
35,000
304,979
339,979
2020
39,29635,000
298,332
372,628
Library ServicesII) Capital Column Labels
0000042 Aylmer Facility Improvements0000043 Accessibility Renos0000044 Library Van Replacement0000045 Book Purchases - Library
Capital Assets - Work in Progress
5) Capital WIP
DescriptionOpCap Sum of BudgetRow LabelsGrand Total
50,00055,87880,000
175,297145,928782,248210,000170,000250,000708,080241,178609,546
2,027,320
5,505,475
Grand Total
2029
6,047
47,80315,92785,37776,62628,59176,006
200,287
536,664
2028
5,940
15,61583,70375,27127,49273,792
213,556110,000
605,369
2027
5,835
15,30982,06273,94026,43471,64380,000
194,901
550,124
2026
5,732
45,04615,00880,45372,63325,41869,556
198,923
512,769
2025
5,630
14,71478,87690,00071,34924,44025,00067,531
251,766
629,306
2024
5,531
14,42677,32970,08723,50065,564
183,591
440,028
2023
5,433
42,44814,14375,81368,84822,59663,654
195,452100,000
588,387
100
2022
5,337
13,86574,32675,00067,63121,72761,800
178,094
497,780
2021
5,243
13,59472,86966,43520,89260,000
181,468100,000
520,501
2020
5,150
40,00013,32771,44080,00075,00065,26020,08825,000
229,282
624,547
Information TechnologyII) Capital Column Labels
0000022 Website Development0000023 Hardware Replacement0000025 Photocopiers0000026 Other Licenses0000027 Server Replacement0000028 Storage Replacement0000033 HCM System0000034 GIS -
ESRI ELA0000035 Dietary Software0000038 Dietary Hardware0000039 GIS - GeoCortex0000040 GIS - CityWorks0000041 Phone System Replacement
Capital Assets - Work in Progress
5) Capital WIP
DescriptionOpCap Sum of BudgetRow LabelsGrand Total
468,664369,176185,518547,486
2,003,898 1,874,354
5,449,095
Grand Total
2029
98,73998,26359,755
461,999
718,755
2028
96,80258,583
405,136
560,522
2027
57,434
397,193
454,627
2026
56,308
468,664389,404
914,376
2025
55,204
381,769
436,973
2024
54,122
374,283
428,405
2023
87,67787,25553,060
101
410,242
638,234
2022
85,95852,020
359,750
497,727
2021
51,000
352,696
403,696
2020
50,000
345,780
395,780
AmbulanceII) Capital Column Labels
0000034 Ambulance Proj A0000035 Defibs0000038 ERV Replacement0000039 Laptops0000041 Power Lifts0000044 Ambulance Proj B
Capital Assets - Work in Progress
5) Capital WIP
DescriptionOpCap Sum of BudgetRow LabelsGrand Total
ЊАͲЉЉЉ
17,000
Grand Total
102
2028
БͲЎЉЉ
8,500
2023
БͲЎЉЉ
8,500
9ĭƚƓƚƒźĭ 5ĻǝĻƌƚƦƒĻƓƷLLΜ /ğƦźƷğƌ Column Labels
ЉЉЉЉЉЍЊ ƚǒƩźƭƒ ğƓ
Capital Assets - Work in Progress
5) Capital WIP
5ĻƭĭƩźƦƷźƚƓhƦ/ğƦ Sum of BudgetRow LabelsGrand Total
Closed Capital Report for 2019
Costs to be
Cum BudgetClosedSurplus
5) ADMINISTRATION BUILDING
Administrative Building 4,975,341 4,962,005 13,336
7) ENGINEERING SERVICES
Engineering Services 13,877,041 13,169,284 707,757
8) HOMES FOR SENIORS SERVICES
Bobier Villa Building & Property 128,500 109,042 19,458
Bobier Villa Dietary 6,380 6,380 (0)
Bobier Villa Nursing & Personal Care 43,234 42,803 431
Elgin Manor Building & Property 262,035 121,364 140,671
Elgin Manor Dietary 25,000 1,495 23,505
Elgin Manor Nursing & Personal Care 58,250 58,250 -
Terrace Lodge Dietary 30,000 21,370 8,630
Terrace Lodge Nursing & Personal Care 51,880 50,162 1,718
9) MUSEUM/ARCHIVES
Museum 60,704 60,704 (0)
10) LIBRARY SERVICES
Library Services 364,631 348,590 16,041
11) INFORMATION TECHNOLOGIES
Information Technology 259,967 218,717 41,250
14) AMBULANCE & EMERGENCY SERVICES
Ambulance 324,052 339,014 (14,962)
Grand Total 20,467,015 19,509,181 957,834
103
2019 Closed Capital Projects for Administrative Building
Costs to be
Cum BudgetClosedSurplus
5) Capital WIP
Capital Assets - Work in Progress
26601407 POA Court Facility 4,850,341 4,850,341 (0)
26601910 Roof Repairs 125,000 111,664 13,336
Grand Total 4,975,341 4,962,005 13,336
104
2019 Closed Capital Projects for Engineering Services
Costs to be
Cum BudgetClosedSurplus
5)Capital WIP
Capital Assets - Work in Progress
ЏЉВЉЊАЉЍ źĻƓƓğ wĻĭƚƓƭƷƩǒĭƷźƚƓ ЋЉЎͲЉЉЉ ЋЊЍͲЋЉЌ ΛВͲЋЉЌΜ
ЏЉВЉЊБЉЋ wƚğķ В ğƓķ ЍБ 5ƩğźƓğŭĻ {ǒƩǝĻǤАЎͲЉЉЉ АЎͲЉЉЉ
ЏЉВЉЊБЉЌ 9ƌƒ {ƷƩĻĻƷ LƓƷĻƩƭĻĭƷźƚƓ LƒƦƩƚǝĻƒĻƓƷƭЋЎͲЉЉЉ ЋЍͲВВЏ Ѝ
ЏЉВЉЊБЉЎ .źĭǤĭƌĻ \[ğƓĻƭ ЌБАͲЉЍЊ ЋЊЎ ЌБЏͲБЋЏ
ЏЋЉЉЊБЉЊ wƚğķ ЌБ wĻŷğĬźƌźƷğƷźƚƓ ΛwźĭŷƒƚƓķ Ʒƚ {ğƓķǤƷƚǞƓ wƚğķΜ БЎЉͲЉЉЉ ЊͲЎЍЊͲАВБΛЏВЊͲАВБΜ
ЏЋЉЉЊБЉЋ wƚğķ Ћ wĻŷğĬźƌźƷğƷźƚƓ ΛЊЉЌ Ʒƚ ĻƭƷ \[ƚƩƓĻ t\[Μ ЊͲЌАЎͲЉЉЉ ЊͲЎЌБͲВЍЌΛЊЏЌͲВЍЌΜ
ЏЋЉЉЊБЉЌ wƚğķ ЍБ wĻŷğĬźƌźƷğƷźƚƓ ΛƚƓķĻƩƌğƓķ wƚğķ Ʒƚ ЋЎΜ ЏЉЉͲЉЉЉ ЎБЍͲЋЎЉ ЊЎͲАЎЉ
ЏЋЉЉЊБЉЍ wƚğķ ЌЉ wĻŷğĬźƌźƷğƷźƚƓ Λwķ ЎЋ Ʒƚ ĻĬĬĻƩ .ƚǒƩƓĻΜ ЊͲЍЌЉͲЉЉЉ ЊͲЍЏЌͲЎЉБ ΛЌЌͲЎЉБΜ
ЏЋЉЉЊБЉЎ źĻƓƓğ wĻĭƚƓƭƷƩǒĭƷźƚƓ ΛtƌğƓƉ wƚğķΜ ЋͲЎАЉͲЉЉЉ ЋͲЎБВͲВЊЌ ΛЊВͲВЊЌΜ
ЏЋЉЉЊВЉЋ wƚğķ ЋЋ ΛCğźƩǝźĻǞ wƚğķΜ Ώ wĻŷğĬźƌźƷğźƷƚƓ Λwķ ЋА Λ{ƦğƩƷğ \[źƓĻΜƷƚ{ƚǒƷŷķğƌĻ\[źƓĻΜ ЊͲЊЍЉͲЉЉЉ ЊͲЊЊВͲЎЊБ ЋЉͲЍБЋ
ЏЋЉЉЊВЉЌ wƚğķ ЌБ ΛIĻƩźƷğŭĻ \[źƓĻΜ Ώ wĻŷğĬźƌźƷğƷźƚƓ Λ{ƷƩğƷŅƚƩķǝźƌƌĻ9t\[ Ʒƚwķ ЎЎΜ ЊͲЉЋЉͲЉЉЉ ЍЎЍͲЍЊЏ ЎЏЎͲЎБЍ
ЏЋЉЉЊВЉЎ wƚğķ ЍВ ΛŷźƷƷğƉĻƩ wƚğķΜ Ώ wĻŷğĬźƌźƷğƷźƚƓ ΛC5wΉwЊΜ ЎБЉͲЉЉЉ ЍВБͲЍЊЏ БЊͲЎБЍ
ЏЋЊЉЊВЉЊ \[ğƓķ tǒƩĭŷğƭĻЊЉͲЉЉЉ ЍͲЊБАЎͲБЊЌ
ЏЋЋЉЊБЉЊ wƚğķ АЏ wĻƭǒƩŅğĭźƓŭ Λwķ Ќ Ʒƚ ağƩƭŷ \[źƓĻΜ њ tğǝĻķ {ŷƚǒƌķĻƩƭ ЏЌЉͲЉЉЉ ЏБЍͲБББ ΛЎЍͲБББΜ
ЏЋЋЉЊБЉЋ wƚğķ ЍЏ wĻƭǒƩŅğĭźƓŭ ΛYƓƚƷƷƭ aźƌƌ .Ʃ͵ ƚ IǞǤ ЌΜ ЌЌЎͲЉЉЉ ЋВЋͲВЊБ ЍЋͲЉБЋ
ЏЋЋЉЊВЉЊ wƚğķ Џ ΛWƚŷƓƭƷƚƓ \[źƓĻΜ Ώ wĻƭǒƩŅğĭźƓŭ Λwķ А Λ/ƌğĭŷğƓ wƚğķΜƷƚ.ƌğĭƉƭ wķΜ ЍЏЉͲЉЉЉ ЌЉВͲЋЌБ ЊЎЉͲАЏЋ
ЏЋЋЉЊВЉЋ wƚğķ Б Λ/ǒƩƩźĻ wƚğķΜ Ώ wĻƭǒƩŅğĭźƓŭ Λwķ ЊЏ ΛCźƓŭğƌ \[źƓĻΜƷƚwķ Ќ ΛğƌĬƚƷ\[źƓĻΜΜ ЋЋЎͲЉЉЉ ЊЎЉͲЌЎЊ АЍͲЏЍВ
ЏЋЋЉЊВЉЌ wƚğķ ЎЏ Λ9ƌƒ \[źƓĻΜ Ώ wĻƭǒƩŅğĭźƓŭ ΛЋБ Λ/ĻƓƷĻƓƓźğƌ wƚğķΜƷƚЌЏ ΛvǒğƉĻƩ wƚğķΜΜ ЎБЎͲЉЉЉ ЎЋАͲЋЎА ЎАͲАЍЌ
ЏЋЎЉЊВЉЊ wƚğķ ЍЉ Λ{ƦƩźƓŭŅźĻƌķ wƚğķΜ Ώ aźĭƩƚƭǒƩŅğĭźƓŭ ΛDƌĻƓĭƚƌźƓƷƚ{ƦƩźƓŭŅźĻƌķ{t\[Μ ЊЋЎͲЉЉЉ ЊЊЌͲЋЏЎ ЊЊͲАЌЎ
ЏЋЎЉЊВЉЋ wƚğķ ЍЌ ΛwźĭŷƒƚƓķ wƚğķΜ Ώ aźĭƩƚƭǒƩŅğĭźƓŭ ΛWƚŷƓ źƭĻ\[źƓĻƷƚwźĭŷƒƚƓķΜ ЊБЉͲЉЉЉ ЊЏЎͲЋАБ ЊЍͲАЋЋ
ЏЋВЉЊБЉЋ /ǒƌǝĻƩƷ wĻŷğĬźƌźƷğƷźƚƓƭ . ЌАЎͲЉЉЉ ЋЊЏͲАЋЏ ЊЎБͲЋАЍ
ЏЋВЉЊБЉЌ YźƓŭ DĻƚƩŭĻ \[źŅƷ .ƩźķŭĻ /ğƦźƷğƌ wĻƦğźƩƭАЎͲЉЉЉ БЎͲВЊЏ ΛЊЉͲВЊЏΜ
ЏЋВЉЊВЉЊ /ǒƌǝĻƩƷ wĻŷğĬźƌźƷğƷźƚƓƭ ЌЍЎͲЉЉЉ ЌЍЋͲЋВАЋͲАЉЌ
ЏЋВЉЊВЉЏ wğźƌƩƚğķ /ƩƚƭƭźƓŭ LƒƦƩƚǝĻƒĻƓƷƭАЎͲЉЉЉ АЌͲАЋЎ ЊͲЋАЎ
ЏЋВЉЊВЉА DǒźķĻƩğźƌ LƓƭƷğƌƌğƷźƚƓƭ ЋЉЉͲЉЉЉ ЊАЌͲЉЏЍ ЋЏͲВЌЏ
Grand Total 13,877,041 13,169,284 707,757
105
2019 Closed Capital Projects for Bobier Villa Building & Property
Costs to be
Cum BudgetClosedSurplus
5) Capital WIP
Capital Assets - Work in Progress
45031851 Building Automation 35,000 2,681 32,319
45031853 Spa/Tub Room Carry-Over Project 27,000 38,480 (11,480)
45031854 Security/Resident Safety 36,500 37,995 (1,495)
45031855 Building Signage 30,000 29,887 113
Grand Total 128,500 109,042 19,458
106
2019 Closed Capital Projects for Bobier Villa Dietary
Costs to be
Cum BudgetClosedSurplus
5) Capital WIP
Capital Assets - Work in Progress
ЍЊЉЌЊАЎЉ YźƷĭŷĻƓ 9ƨǒźƦƒĻƓƷ ЏͲЌБЉ ЏͲЌБЉ ΛЉΜ
Grand Total 6,380 6,380 (0)
107
2019 Closed Capital Projects for Bobier Villa Nursing & Personal Care
Costs to be
Cum BudgetClosedSurplus
5) Capital WIP
Capital Assets - Work in Progress
ЍЋЉЌЊВЎЊ .Ļķ wĻƦƌğĭĻƒĻƓƷƭ ЍЌͲЋЌЍ ЍЋͲБЉЌ ЍЌЊ
Grand Total 43,234 42,803 431
108
2019 Closed Capital Projects for Elgin Manor Building & Property
Costs to be
Cum BudgetClosedSurplus
5) Capital WIP
Capital Assets - Work in Progress
45011851 Pumps & Equipment (STP) 112,035 15,569 96,466
45011852 Landscaping 15,000 15,667 (667)
45011856 Building Signage 30,000 45,736 (15,736)
45011953 HVAC 20,000 20,000
45011955 EM Main Breaker Repair 50,000 30,400 19,600
45011961 Sprinkler Valve 35,000 13,992 21,008
Grand Total 262,035 121,364 140,671
109
2019 Closed Capital Projects for Elgin Manor Dietary
Costs to be
Cum BudgetClosedSurplus
5) Capital WIP
Capital Assets - Work in Progress
ЍЊЉЊЊБЎЉ ЋЎͲЉЉЉ ЊͲЍВЎ ЋЌͲЎЉЎ
Grand Total 25,000 1,495 23,505
110
2019 Closed Capital Projects for Elgin Manor Nursing & Personal Care
Costs to be
Cum BudgetClosedSurplus
5) Capital WIP
Capital Assets - Work in Progress
ЍЋЉЊЊВЎЊ .Ļķ wĻƦƌğĭĻƒĻƓƷƭ ЎБͲЋЎЉ ЎБͲЋЎЉ Ώ
Grand Total 58,250 58,250 -
111
2019 Closed Capital Projects for Terrace Lodge Dietary
Costs to be
Cum BudgetClosedSurplus
5) Capital WIP
Capital Assets - Work in Progress
ЍЊЉЋЊВЎЉ YźƷĭŷĻƓ 9ƨǒźƦƒĻƓƷ ЌЉͲЉЉЉ ЋЊͲЌАЉ БͲЏЌЉ
Grand Total 30,000 21,370 8,630
112
2019 Closed Capital Projects for Terrace Lodge Nursing & Personal Care
Costs to be
Cum BudgetClosedSurplus
5) Capital WIP
Capital Assets - Work in Progress
ЍЋЉЋЊВЎЊ .Ļķ wĻƦƌğĭĻƒĻƓƷƭ ЋЌͲЉЉЉ ЋЋͲЉЊА ВБЌ
ЍЋЉЋЊВЎЋ \[źŅƷƭ ε {ĭğƌĻƭ ЋБͲББЉ ЋБͲЊЍЎ АЌЎ
Grand Total 51,880 50,162 1,718
113
2019 Closed Capital Projects for Museum
Costs to be
Cum BudgetClosedSurplus
5) Capital WIP
Capital Assets - Work in Progress
27901608 Museum Furnishings - From Library Aylmer 60,704 60,704 (0)
Grand Total 60,704 60,704 (0)
114
2019 Closed Capital Projects for Library Services
Costs to be
Cum BudgetClosedSurplus
5) Capital WIP
Capital Assets - Work in Progress
58101804 Library Van Replacement 45,000 44,472 528
58101901 Book Purchases - Library 284,631 269,254 15,377
58101903 Accessibility Renos 35,000 34,865 135
Grand Total 364,631 348,590 16,041
115
2019 Closed Capital Projects for Information Technology
Costs to be
Cum BudgetClosedSurplus
5) Capital WIP
Capital Assets - Work in Progress
ЎАБЉЊВЉЊ IğƩķǞğƩĻ wĻƦƌğĭĻƒĻƓƷ ВЋͲЌЉЉ ЏБͲЌЌЋ ЋЌͲВЏБ
ЎАБЉЊВЉЋ a5{ wğź CǒƓķźƓŭ ЊЎͲЌЉЉ ЊЉͲБЍЎ ЍͲЍЎЎ
ЎАБЉЊВЉЌ tŷƚƷƚĭƚƦźĻƩƭ ЊЌͲЌЋА ЊЏͲАЋБ ΛЌͲЍЉЊΜ
ЎАБЉЊВЉЍ hƷŷĻƩ \[źĭĻƓƭĻƭ АЌͲЍЍЉ ЏБͲЊЉА ЎͲЌЌЌ
ЎАБЉЊВЉЎ {ĻƩǝĻƩ wĻƦƌğĭĻƒĻƓƷ ЏЉͲЉЉЉ ЎЋͲЉЌВ АͲВЏЊ
ЎАБЉЊВЉБ źtğķ wĻƦƌğĭĻƒĻƓƷ Ώ \[ğƓķ 5źǝźƭźƚƓ ЎͲЏЉЉ ЋͲЏЏЎ ЋͲВЌЎ
Grand Total 259,967 218,717 41,250
116
2019 Closed Capital Projects for Ambulance
Costs to be
Cum BudgetClosedSurplus
5) Capital WIP
Capital Assets - Work in Progress
28001801 Ambulance Proj C 324,052 339,014 (14,962)
Grand Total 324,052 339,014 (14,962)
117
Carry-Forward Capital Report for 2019
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
0) CORPORATE ACTIVITIES
Corporate Activities 50,000 50,000
5) ADMINISTRATION BUILDING
Administrative Building 2,253,849 353,169 1,900,680
7) ENGINEERING SERVICES
Engineering Services 15,560,500 5,825,237 9,735,263
8) HOMES FOR SENIORS SERVICES
Bobier Villa Building & Property 333,000 29,072 303,928
Bobier Villa Housekeeping 8,000 8,000
Bobier Villa Nursing & Personal Care 31,120 31,120
Elgin Manor Building & Property 295,000 122,620 172,380
Elgin Manor Housekeeping 10,000 10,000
Elgin Manor Laundry 45,530 - 45,530
Elgin Manor Nursing & Personal Care 53,730 779 52,951
Terrace Lodge Building & Property 32,561,000 657,172 31,903,828
Terrace Lodge Housekeeping 32,000 16,767 15,233
9) MUSEUM/ARCHIVES
Archives 10,000 8,152 1,848
Museum 30,000 30,000
10) LIBRARY SERVICES
Library Services 105,025 8,795 96,230
11) INFORMATION TECHNOLOGIES
Information Technology 47,510 1,136 46,374
14) AMBULANCE & EMERGENCY SERVICES
Ambulance 729,300 729,300
Grand Total 52,155,564 7,022,900 45,132,664
118
2019 Carry-Forward Capital Projects for Corporate Activities
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
28001804 Ambulance Bldg R & M* 50,000 50,000
Grand Total 50,000 50,000
119
2019 Carry-Forward Capital Projects for Administrative Building
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
26601708 Window Replacement* 75,000 75,000
26601807 Cooling Tower Replacement - Admin* 50,000 50,000
26601808 Building Automation System Upgrades - Admin* 30,000 646 29,354
26601810 Renovations for GSE* 311,815 295,408 16,407
26601811 Exterior Building Capital Repairs/Parking* 1,128,799 1,128,799
26601908 POA/Museum Project Completion (Landscape/Drain/Other)* 408,235 57,115 351,120
26601909 Interior Renovations* 250,000 250,000
Grand Total 2,253,849 353,169 1,900,680
120
2019 Carry-Forward Capital Projects for Engineering Services
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
60901701 Wonderland Road Reconstruction* 1,180,000 232,012 947,988
60901702 Sparta Reconstruction* 1,825,000 115,181 1,709,819
60901801 Port Burwell Road Drainage Survey* 190,000 120,419 69,581
60901804 Asset Management Program* 100,000 100,000
60901917 Elm Street Intersection Improvements at Centennial Road* 500,000 12,505 487,495
60901918 Chatham Road Slope Stabilization* 1,000,000 65,594 934,406
62001904 Road 48 (Lyons Line) - Rehabilitation (Rd 74 (Belmont Road) to 73 (Imperial Road))* 1,615,000 1,529,506 85,494
62901801 Kimble Bridge Replacement* 85,000 77,683 7,317
62901804 Multiple Bridge Repair Tender* 425,000 369,863 55,137
62901805 Port Bruce Bridge Replacement* 5,515,500 2,801,790 2,713,710
62901902 King George Lift Bridge Rehabilitation* 2,300,000 471,399 1,828,601
62901903 St. George Street Bridge Engineering* 60,000 60,000
62901905 Bothwell Bridge Engineering* 25,000 25,000
62901908 Geotechnical Investigations - Roadway* 50,000 20,316 29,684
62901909 Elm Street Intersection Improvements at Oak Street* 60,000 60,000
62901910 Meeks Bridge Replacement* 500,000 8,968 491,032
62901911 Culvert Rehabilitations C* 130,000 130,000
Grand Total 15,560,500 5,825,237 9,735,263
121
2019 Carry-Forward Capital Projects for Bobier Villa Building & Property
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
45031852 Building Envelope Repairs* 30,000 30,000
45031950 Door & Wall Protection* 10,000 6,313 3,687
45031952 Spa/Tub Room* 28,000 28,000
45031953 Lighting Upgrade* 50,000 577 49,423
45031954 Security/Resident Safety Carry Over Project* 7,500 2,831 4,669
45031955 Misc Bldg* 5,500 5,500
45031956 Floor Replacement - Resident Rooms* 22,000 22,000
45031957 HVAC Replacements* 90,000 4,272 85,728
45031958 Flat Roof Replacement* 60,000 60,000
45031959 Parking Lot Repair* 15,000 15,000
45031960 Business Office Flooring* 5,000 8,722 (3,722)
45031961 Smoking Area* 10,000 6,356 3,644
Grand Total 333,000 29,072 303,928
122
2019 Carry-Forward Capital Projects for Bobier Villa Housekeeping
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
ЍЌЉЌЊВЎЊ aźĭƩƚŅźĬƩĻ /ƌĻğƓźƓŭ {ǤƭƷĻƒΫ БͲЉЉЉ БͲЉЉЉ
Grand Total 8,000 8,000
123
2019 Carry-Forward Capital Projects for Bobier Villa Nursing & Personal Care
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
ЍЋЉЌЊВЎЉ \[źŅƷƭ ε {ĭğƌĻƭΫ ЌЊͲЊЋЉ ЌЊͲЊЋЉ
Grand Total 31,120 31,120
124
2019 Carry-Forward Capital Projects for Elgin Manor Building & Property
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
45011750 Building Automation* 10,000 10,000
45011853 Washroom Upgrades* 70,000 31,077 38,923
45011855 Security/Resident Safety* 10,000 4,470 5,530
45011952 Parking Lot Resurfacing* 110,000 78,659 31,341
45011954 Building Envelope Repairs* 20,000 1,695 18,305
45011956 Misc Bldg* 10,000 10,000
45011957 Business Office Flooring* 20,000 20,000
45011959 Door & Wall Protection* 5,000 5,000
45011960 Garbage Compactor* 25,000 25,000
45011962 Exterior Upgrades* 15,000 6,719 8,281
Grand Total 295,000 122,620 172,380
125
2019 Carry-Forward Capital Projects for Elgin Manor Housekeeping
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
ЍЌЉЊЊВЎЉ aźĭƩƚŅźĬƩĻ /ƌĻğƓźƓŭ {ǤƭƷĻƒΫ ЊЉͲЉЉЉ ЊЉͲЉЉЉ
Grand Total 10,000 10,000
126
2019 Carry-Forward Capital Projects for Elgin Manor Laundry
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
ЍЍЉЊЊБЎЉ \[ğǒƓķƩǤ 9ƨǒźƦƒĻƓƷΫ ЍЎͲЎЌЉ Ώ ЍЎͲЎЌЉ
Grand Total 45,530 - 45,530
127
2019 Carry-Forward Capital Projects for Elgin Manor Nursing & Personal Care
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
ЍЋЉЊЊВЎЉ \[źŅƷƭ ε {ĭğƌĻƭΫ ЍВͲЉЉЉ ААВ ЍБͲЋЋЊ
ЍЋЉЊЊВЎЋ .Ļķ wĻƦƌğĭĻƒĻƓƷƭ /ğƩƩǤ CƚƩǞğƩķΫ ЍͲАЌЉ ЍͲАЌЉ
Grand Total 53,730 779 52,951
128
2019 Carry-Forward Capital Projects for Terrace Lodge Building & Property
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
ЍЎЉЋЊЋЉБ .ǒźƌķźƓŭ wĻƓƚǝğƷźƚƓΫ ЌЋͲЎЌЊͲЉЉЉ ЏЎАͲЊАЋ ЌЊͲБАЌͲБЋБ
ЍЎЉЋЊВЎЉ 9ǣƷĻƩźƚƩ wĻƦğźƩƭΫ ЊЉͲЉЉЉ ЊЉͲЉЉЉ
ЍЎЉЋЊВЎЊ tğƩƉźƓŭ \[ƚƷ wĻƦğźƩƭΫ ЊЎͲЉЉЉ ЊЎͲЉЉЉ
ЍЎЉЋЊВЎЋ \[ƚǞĻƩ bƚƩƷŷ CƌƚƚƩ wĻƦğźƩΫ ЎͲЉЉЉ ЎͲЉЉЉ
Grand Total 32,561,000 657,172 31,903,828
129
2019 Carry-Forward Capital Projects for Terrace Lodge Housekeeping
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
ЍЌЉЋЊВЎЉ IƚǒƭĻƉĻĻƦźƓŭ 9ƨǒźƦƒĻƓƷΫ ЋЉͲЉЉЉ ЊЏͲАЏА ЌͲЋЌЌ
ЍЌЉЋЊВЎЊ aźĭƩƚŅźĬƩĻ /ƌĻğƓźƓŭ {ǤƭƷĻƒΫ ЊЋͲЉЉЉ ЊЋͲЉЉЉ
Grand Total 32,000 16,767 15,233
130
2019 Carry-Forward Capital Projects for Archives
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
29401907 Misc Capital - Archives* 10,000 8,152 1,848
Grand Total 10,000 8,152 1,848
131
2019 Carry-Forward Capital Projects for Museum
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
ЋАВЉЊВЉЎ aǒƭĻǒƒ Ώ aźƭĭ /ğƦźƷğƌΫ ЌЉͲЉЉЉ ЌЉͲЉЉЉ
Grand Total 30,000 30,000
132
2019 Carry-Forward Capital Projects for Library Services
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
58101402 Aylmer Facility Improvements* 105,025 8,795 96,230
Grand Total 105,025 8,795 96,230
133
2019 Carry-Forward Capital Projects for Information Technology
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
ЎАБЉЊАЊЉ ĻĬƭźƷĻ 5ĻǝĻƌƚƦƒĻƓƷΫ ЊАͲЎЊЉ ЋЍЉ ЊАͲЋАЉ
ЎАБЉЊВЉВ t// 5ƚĭǒƒĻƓƷğƷźƚƓ IğƩķǞğƩĻΫ ЌЉͲЉЉЉ БВА ЋВͲЊЉЌ
Grand Total 47,510 1,136 46,374
134
2019 Carry-Forward Capital Projects for Ambulance
Actual Carry-
Forward Work-Carry-Forward
Cum BudgetIn-ProgressBudget Reserve
5) Capital WIP
Capital Assets - Work in Progress
28001901 Ambulance Proj A* 321,300 321,300
28001902 Defibs* 408,000 408,000
Grand Total 729,300 729,300
135